REGULATIONS
Vol. 38 Iss. 8 - December 06, 2021

TITLE 20. PUBLIC UTILITIES AND TELECOMMUNICATIONS
STATE CORPORATION COMMISSION
Chapter 315
Proposed

REGISTRAR'S NOTICE: The State Corporation Commission is claiming an exemption from the Administrative Process Act in accordance with § 2.2-4002 A 2 of the Code of Virginia, which exempts courts, any agency of the Supreme Court, and any agency that by the Constitution is expressly granted any of the powers of a court of record.

Title of Regulation: 20VAC5-315. Regulations Governing Net Energy Metering (amending 20VAC5-315-20).

Statutory Authority: §§ 12.1-13 and 56-594 of the Code of Virginia.

Public Hearing Information: A public hearing will be scheduled upon request.

Public Comment Deadline: January 4, 2022.

Agency Contact: Mike Cizenski, Principal Utility Engineer, Public Utility Regulation Division, State Corporation Commission, P.O. Box 1197, Richmond, VA 23218, telephone (804) 371-9441, or email mike.cizenski@scc.virginia.gov.

Summary:

Pursuant to Chapter 266 of the 2021 Acts of Assembly, Special Session I, the amendment conforms the definition of "small agricultural generator" to § 56-594.2 of the Code of Virginia to include any business granted a manufacturer license pursuant to subdivisions 1 through 6 of § 4.1-206.1 of the Code of Virginia.

AT RICHMOND, NOVEMBER 12, 2021

COMMONWEALTH OF VIRGINIA, ex rel.

STATE CORPORATION COMMISSION

CASE NO. PUR-2021-00251

Ex Parte: In the matter of amending regulations

governing net energy metering

ORDER ESTABLISHING PROCEEDING

The Regulations Governing Net Energy Metering, 20 VAC 5-315-10 et seq. ("Net Energy Metering Rules"), adopted by the State Corporation Commission ("Commission") pursuant to § 56-594 of the Code of Virginia ("Code"), establish the requirements for participation by an eligible customer-generator in net energy metering in the Commonwealth. The Net Energy Metering Rules include conditions for interconnection and metering, billing, and contract requirements between net metering customers, electric distribution companies, and energy service providers.

Chapter 266 of the 2021 Acts of Assembly, Special Session I ("Chapter 266"), amended the definition of "[s]mall agricultural generator" in Code § 56-594.2 as follows:

"Small agricultural generator" means a customer that: ...

2. Operates a small agricultural generating facility as part of (i) an agricultural business or (ii) any business granted a manufacturer license pursuant to subdivisions 1 through 6 of § 4.1-206.1;..."

The current Net Energy Metering Rules thus must be revised to reflect the change set forth in Chapter 266.

NOW THE COMMISSION, upon consideration of the matter, is of the opinion and finds that a proceeding should be established to amend the Net Energy Metering Rules in keeping with the expanded definition of "[s]mall agricultural generator" in Chapter 266.

To initiate this proceeding, the Commission Staff has prepared a proposed amendment to Rule 20 VAC 5-315-20 of the Net Energy Metering Rules ("Proposed Amendment"), which is appended to this Order. The Commission finds that notice of the Proposed Amendment should be given to the public; that interested persons should be provided an opportunity to file written comments on, propose modifications or supplements to, or request a hearing on the Proposed Amendment; and that each Virginia electric distribution company within the meaning of 20 VAC 5-315-20 should serve a copy of this Order upon each of their respective net metering customers and each of their existing small agricultural generators and file a certificate of service.

The Commission takes judicial notice of the ongoing public health issues related to the spread of the coronavirus, or COVID-19. The Commission has taken certain actions, and may take additional actions going forward, that could impact the procedures in this proceeding.1

Accordingly, IT IS ORDERED THAT:

(1) This case is docketed and assigned Case No. PUR-2021-00251.

(2) All comments and other documents and pleadings filed in this matter shall be submitted electronically to the extent authorized by Rule 5 VAC 5-20-150, Copies and format, of the Commission's Rules of Practice and Procedure,2 as modified herein.3 Confidential and Extraordinarily Sensitive Information shall not be submitted electronically and shall comply with Rule 5 VAC 5-20-170, Confidential information, of the Rules of Practice. At this time, any person seeking to hand deliver and physically file or submit any pleading or other document shall contact the Clerk's Office Document Control Center at (804) 371-9838 to arrange the delivery.4

(3) The Commission's Division of Information Resources shall forward a copy of this Order Establishing Proceeding to the Registrar of Regulations for publication in the Virginia Register of Regulations.

(4) On or before December 2, 2021, each Virginia electric distribution company to which the Net Energy Metering Rules apply shall serve a copy of this Order upon each of their respective net metering customers and each of their existing small agricultural generators and shall file with the Clerk of the Commission a certificate of service no later than December 22, 2021, consistent with the findings above.

(5) An electronic copy of the Proposed Amendment may be obtained by submitting a request to Michael A. Cizenski in the Commission's Division of Public Utility Regulation at the following email address: mike.cizenski@scc.virginia.gov. An electronic copy of the Proposed Amendment can be found at the Division of Public Utility Regulation's website: scc.virginia.gov/pages/Rulemaking. Interested persons may also download unofficial copies of the Order and the Proposed Amendment from the Commission's website: scc.virginia.gov/pages/Case-lnformation.

(6) On or before January 4, 2022, any interested person may comment on, propose modifications or supplements to, or request a hearing on the Proposed Amendment following the instructions on the Commission's website: scc.virginia.gov/casecomments/Submit-Public-Comments. Those unable, as a practical matter, to submit such documents electronically may file such comments by U.S. mail to the Clerk of the State Corporation Commission, c/o Document Control Center, P.O. Box 2118, Richmond, Virginia 23218-2118. All such documents shall refer to Case No. PUR-2021-00251. Individuals should be specific in their comments, proposals, or supplements to the Proposed Amendment and should address only those issues pertaining to the amendment of § 56-594.2 of the Code pursuant to Chapter 266. Issues outside the scope of addressing this amendment will not be open for consideration. Any request for hearing shall state with specificity why the issues raised in the request for hearing cannot be adequately addressed in written comments. If a sufficient request for hearing is not received, the Commission may consider the matter and enter an order based upon the comments, documents or other pleadings filed in this proceeding.

(7) On or before January 18, 2022, the Staff shall file with the Clerk of the Commission a report on or a response to any comments, proposals, or requests for hearing submitted to the Commission on the Proposed Amendment.

(8) This matter is continued for further orders of the Commission.

A COPY hereof shall be sent electronically by the Clerk of the Commission to all persons on the official Service List in this matter. The Service List is available from the Clerk of the Commission.

____________________________________________

1See, e.g., Commonwealth of Virginia, ex rel. State Corporation Commission, Ex Parte: Electronic Service of Commission Orders, Case No. CLK-2020-00004, Doc. Con. Cen. No. 200330035, Order Concerning Electronic Service of Commission Orders (Mar. 19, 2020), extended by Doc. Con. Cen. No. 200520105, Order Regarding the State Corporation Commission's Revised Operating Procedures During COVID-19 Emergency (May 11, 2020); Commonwealth of Virginia, ex rel., State Corporation Commission, Ex Parte: Revised Operating Procedures During COVID-19 Emergency, Case No. CLK-2020-00005, Doc. Con. Cen. No. 200330042, Order Regarding the State Corporation Commission's Revised Operating Procedures During COVID-19 Emergency (Mar. 19, 2020) ("Revised Operating Procedures Order"), extended by Doc. Con. Cen. No. 200520105, Order Regarding the State Corporation Commission's Revised Operating Procedures During COVID-19 Emergency (May 11, 2020); Commonwealth of Virginia, ex rel. State Corporation Commission, Ex Parte: Electronic service among parties during COVID-19 emergency, Case No. CLK-2020-00007, Doc. Con. Cen. No. 200410009, Order Requiring Electronic Service (Apr. 1, 2020).

25 VAC 5-20-10 et seq. ("Rules of Practice").

3See supra, n.1.

4As noted in the Revised Operating Procedures Order, submissions to the Commission's Clerk's Office via U.S. mail or commercial mail equivalents may be subject to delayed processing due to the COVID-19 public health issues.

20VAC5-315-20. Definitions.

The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:

"Agricultural business" means any sole proprietorship, corporation, partnership, electing small business (Subchapter S) corporation, or limited liability company engaged primarily in the production and sale of plants and animals, products collected from plants and animals, or plant and animal services that are useful to the public.

"Agricultural net metering customer" means a customer that operates an electrical generating facility consisting of one or more agricultural renewable fuel generators having an aggregate generation capacity of not more than 500 kilowatts as part of an agricultural business under a net metering service arrangement. An agricultural net metering customer may be served by multiple meters serving the agricultural net metering customer that are located at the same or adjacent sites and that may be aggregated into one account. This account shall be served under the appropriate tariff.

"Agricultural renewable fuel generator" or "agricultural renewable fuel generating facility" means one or more electrical generators that:

1. Use as their sole energy source solar power, wind power, or aerobic or anaerobic digester gas;

2. The agricultural net metering customer owns and operates, or has contracted with other persons to own or operate, or both;

3. Are located on land owned or controlled by the agricultural business;

4. Are connected to the agricultural net metering customer's wiring on the agricultural net metering customer's side of the agricultural net metering customer's interconnection with the distributor;

5. Are interconnected and operated in parallel with an electric company's distribution facilities; and

6. Are used primarily to provide energy to metered accounts of the agricultural business.

"Billing period" means, as to a particular agricultural net metering customer or a net metering customer, the time period between the two meter readings upon which the electric distribution company and the energy service provider calculate the agricultural net metering customer's or net metering customer's bills.

"Billing period credit" means, for a nontime-of-use agricultural net metering customer or a nontime-of-use net metering customer, the quantity of electricity generated and fed back into the electric grid by the agricultural net metering customer's agricultural renewable fuel generator or by the net metering customer's renewable fuel generator in excess of the electricity supplied to the customer over the billing period. For time-of-use agricultural net metering customers or time-of-use net metering customers, billing period credits are determined separately for each time-of-use tier.

"Competitive service provider" means a person, licensed by the State Corporation Commission, that sells or offers to sell a competitive energy service within the Commonwealth. This term includes affiliated competitive service providers but does not include a party that supplies electricity or natural gas, or both, exclusively for its own consumption or the consumption of one or more of its affiliates. For the purpose of this chapter, competitive service providers include aggregators.

"Contiguous sites" means a group of land parcels in which each parcel shares at least one boundary point with at least one other parcel in the group. Property whose surface is divided only by public right-of-way is considered contiguous.

"Customer" means a net metering customer or an agricultural net metering customer.

"Demand charge-based time-of-use tariff" means a retail tariff for electric supply service that has two or more time-of-use tiers for energy-based charges and an electricity supply demand (kilowatt) charge.

"Electric cooperative" means an electric distribution company organized pursuant to Chapter 9.1 (§ 56-231.15 et seq.) of Title 56 of the Code of Virginia, owned by its members.

"Electric distribution company" means the entity that owns or operates the distribution facilities delivering electricity to the premises of an agricultural net metering customer or a net metering customer.

"Energy service provider (supplier)" means the entity providing electricity supply service, either tariffed or competitive service, to an agricultural net metering customer or a net metering customer.

"Excess generation" means the amount of electrical energy generated in excess of the electrical energy consumed by the agricultural net metering customer or net metering customer over the course of the net metering period. For time-of-use agricultural net metering customers or net metering customers, excess generation is determined separately for each time-of-use tier.

"Generator" or "generating facility" means an electrical generating facility consisting of one or more renewable fuel generators or one or more agricultural renewable fuel generators that meet the criteria under the definition of "net metering customer" and "agricultural net metering customer," respectively.

"Low-income utility customer" means the same as that term is defined in § 56-576 of the Code of Virginia.

"Net metering customer" means for an electric cooperative, a customer owning and operating, or contracting with other persons to own or operate, or both, an electrical generating facility consisting of one or more renewable fuel generators having an aggregate generation capacity of not more than 20 kilowatts for residential customers and not more than one megawatt for nonresidential customers. The generating facility shall be operated under a net metering service arrangement. For an investor-owned electric distribution company, "net metering customer" means a customer owning and operating, or contracting with other persons to own or operate, or both, an electrical generating facility consisting of one or more renewable fuel generators having an aggregate generation capacity of not more than 25 kilowatts for residential customers and not more than three megawatts for nonresidential customers. The generating facility shall be operated under a net metering service arrangement.

"Net metering period" means each successive 12-month period beginning with the first meter reading date following the final interconnection of an agricultural net metering customer or a net metering customer's generating facility consisting of one or more agricultural renewable fuel generators or one or more renewable fuel generators, respectively, with the electric distribution company's distribution facilities.

"Net metering service" means providing retail electric service to an agricultural net metering customer operating an agricultural renewable fuel generating facility or a net metering customer operating a renewable fuel generating facility and measuring the difference, over the net metering period, between the electricity supplied to the customer from the electric grid and the electricity generated and fed back to the electric grid by the customer.

"Nonprofit customer" or "not-for-profit customer" means a person that is exempt from federal income taxation, including (without limitation) schools, hospitals, institutions of higher education, public charities, and churches and other houses of religious worship, as determined by the Internal Revenue Service.

"Person" means any individual, sole proprietorship, corporation, limited liability company, partnership, association, company, business, trust, joint venture, or other private legal entity, the Commonwealth, or any city, county, town, authority, or other political subdivision of the Commonwealth.

"Phase I Utility" shall be defined in accordance with subdivision A 1 of § 56-585.1 of the Code of Virginia.

"Phase II Utility" shall be defined in accordance with subdivision A 1 of § 56-585.1 of the Code of Virginia.

"Purchase power agreement provider" or "PPA provider" means, in an electric cooperative service territory, a person registered with the commission's Division of Public Utility Regulation pursuant to 20VAC5-315-77 to offer third-party partial requirements power purchase agreements to customers.

"Registry" means, in reference to a PPA provider, the list of those persons registered with the commission's Division of Public Utility Regulation as PPA providers.

"Renewable Energy Certificate" or "REC" represents the renewable energy attributes associated with the production of one megawatt-hour (MWh) of electrical energy by a generator.

"Renewable fuel generator" or "renewable fuel generating facility" means one or more electrical generators that:

1. Use renewable energy, as defined by § 56-576 of the Code of Virginia, as their total fuel source;

2. The net metering customer owns and operates, or has contracted with other persons to own or operate, or both;

3. Are located on land owned or leased by the net metering customer and connected to the net metering customer's wiring on the net metering customer's side of its interconnection with the distributor;

4. Are interconnected pursuant to a net metering arrangement and operated in parallel with the electric distribution company's distribution facilities; and

5. Are intended primarily to offset all or part of the net metering customer's own electricity requirements. For an electric cooperative, the capacity of any generating facility installed on or after July 1, 2015, shall not exceed the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available. For an investor-owned electric distribution company, the capacity of any generating facility installed between July 1, 2015, and July 1, 2020, shall not exceed the expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available.

"Small agricultural generating facility" means an electrical generating facility that:

1. Has a capacity of not more than 1.5 megawatts and does not exceed 150% of the customer's expected annual energy consumption based on the previous 12 months of billing history or an annualized calculation of billing history if 12 months of billing history is not available;

2. Uses as its total source of fuel renewable energy;

3. Is located on the customer's premises and is interconnected with the utility's distribution system through a separate meter;

4. Is interconnected and operated in parallel with an electric utility's distribution system but not transmission facilities;

5. Is designed so that the electricity generated is expected to remain on the utility's distribution system; and

6. Is a qualifying small power production facility pursuant to the Public Utility Regulatory Policies Act of 1978 (P.L. 95-617).

"Small agricultural generator" means a customer that:

1. Is not an eligible agricultural customer-generator pursuant to § 56-594 of the Code of Virginia;

2. Operates a small agricultural generating facility as part of (i) an agricultural business or (ii) any business granted a manufacturer license pursuant to subdivisions 1 through 6 of § 4.1-206.1 of the Code of Virginia;

3. May be served by multiple meters that are located at separate but contiguous sites;

4. May aggregate the electricity consumption measured by the meters, solely for purposes of calculating 150% of the customer's expected annual energy consumption but not for billing or retail service purposes, provided that the same utility serves all of its meters;

5. Uses not more than 25% of the contiguous land owned or controlled by the agricultural business for purposes of the renewable energy generating facility; and

6. Provides the electric utility with a certification, attested under oath, as to the amount of land being used for renewable generation.

"System peak" for an electric cooperative, means the highest peak, based on the noncoincident peak of the electric cooperative or the coincident peak of all of the electric cooperative's customers of the past three years listed in Part O, Line 20 of Form 7 (Financial And Operating Report - Electric Distribution) filed with the U.S. Department of Agriculture's Rural Utilities Service (RUS), or an equivalent form if a cooperative is not an RUS borrower, less any portion of the cooperative's total load that is served by a competitive service provider or by a market-based rate.

"Third-party partial requirements power purchase agreement" or "third-party PPA" means, for an electric cooperative, an agreement entered into pursuant to § 56-594.01 K of the Code of Virginia between a customer engaging in net energy metering and a registered PPA provider pursuant to 20VAC5-315-77.

"Time-of-use customer" means an agricultural net metering customer or net metering customer receiving retail electricity supply service under a demand charge-based time-of-use tariff.

"Time-of-use period" means an interval of time over which the energy (kilowatt-hour) rate charged to a time-of-use customer does not change.

"Time-of-use tier" or "tier" means all time-of-use periods given the same name (e.g., on-peak, off-peak, critical peak, etc.) for the purpose of time-differentiating energy (kilowatt-hour)-based charges. The rates associated with a particular tier may vary by day and by season.

VA.R. Doc. No. R22-6231; Filed November 14, 2021