TITLE 9. ENVIRONMENT
TITLE 9. ENVIRONMENT
STATE WATER CONTROL BOARD
Final Regulation
REGISTRAR'S NOTICE: The following regulatory action is exempt from Article 2 of the Administrative Process Act in accordance with § 2.2-4006 A 4 c of the Code of Virginia, which excludes regulations that are necessary to meet the requirements of federal law or regulations, provided such regulations do not differ materially from those required by federal law or regulation. The State Water Control Board will receive, consider, and respond to petitions by any interested person at any time with respect to reconsideration or revision.
Title of Regulation: 9VAC25-875. Virginia Erosion and Stormwater Management Regulation (amending 9VAC25-875-970, 9VAC25-875-980).
Statutory Authority: § 62.1-44.15:28 of the Code of Virginia.
Effective Date: December 18, 2024.
Agency Contact: Rebeccah W. Rochet, Deputy Director, Division of Water Permitting, Department of Environmental Quality, 1111 East Main Street, Suite 1400, P.O. Box 1105, Richmond, VA 23218, telephone (804) 801-2950, or email rebeccah.rochet@deq.virginia.gov.
Summary:
Amendments to 40 CFR Part 122, effective July 12, 2023, replace the term "urbanized area" with "urban area with a population of 50,000 or more people as determined by the latest Decennial Census by the Bureau of the Census" due to changes made by the U.S. Census Bureau. The amendments conform Virginia Erosion and Stormwater Management Regulation (9VAC25-875) with the federal regulation.
9VAC25-875-970. Small municipal separate storm sewer systems.
A. Objectives of the stormwater regulations for small MS4s.
1. Subsections A through G of this section are written in a "readable regulation" format that includes both rule requirements and guidance. The recommended guidance is distinguished from the regulatory requirements by putting the guidance in a separate subdivision headed by the word "Note."
2. Under the statutory mandate in § 402(p)(6) of the Clean Water Act, the purpose of this portion of the stormwater program is to designate additional sources that need to be regulated to protect water quality and to establish a comprehensive stormwater program to regulate these sources.
3. Stormwater runoff continues to harm the nation's waters. Runoff from lands modified by human activities can harm surface water resources in several ways, including by changing natural hydrologic patterns and by elevating pollutant concentrations and loadings. Stormwater runoff may contain or mobilize high levels of contaminants, such as sediment, suspended solids, nutrients, heavy metals, pathogens, toxins, oxygen-demanding substances, and floatables.
4. The department strongly encourages partnerships and the watershed approach as the management framework for efficiently, effectively, and consistently protecting and restoring aquatic ecosystems and protecting public health.
B. As an operator of a small MS4, am I regulated under the state's stormwater program?
1. Unless you qualify for a waiver under subdivision 3 of this subsection, you are regulated if you operate a small MS4, including systems operated by federal, state, tribal, and local governments, including the Virginia Department of Transportation; and
a. Your small MS4 is located in an urbanized urban area with a population of 50,000 or more people as determined by the latest decennial census by the Bureau of the Census (if your small MS4 is not located entirely within an urbanized urban area with a population of 50,000 or more people, only the portion that is within the urbanized urban area is regulated); or
b. You are designated by the department, including where the designation is pursuant to subdivisions C 3 a and b of this section or is based upon a petition under 9VAC25-875-950 D.
2. You may be the subject of a petition to the department to require a permit for your discharge of stormwater. If the department determines that you need a permit, you are required to comply with subsections C through E of this section.
3. The department may waive the requirements otherwise applicable to you if you meet the criteria of subdivision 4 or 5 of this subsection B. If you receive a waiver under this section, you may subsequently be required to seek coverage under a permit in accordance with subdivision C 1 of this section if circumstances change. (See also subdivision E 2 of this section).
4. The department may waive permit coverage if your MS4 serves a population of less than 1,000 within the urbanized urban area identified in subdivision B 1 a of this section and you meet the following criteria:
a. Your system is not contributing substantially to the pollutant loadings of a physically interconnected MS4 that is regulated by the department; and
b. If you discharge any pollutants that have been identified as a cause of impairment of any water body to which you discharge, stormwater controls are not needed based on wasteload allocations that are part of an approved "total maximum daily load" (TMDL) that addresses the pollutants of concern.
5. The department may waive permit coverage if your MS4 serves a population under 10,000 and you meet the following criteria:
a. The department has evaluated all surface waters, including small streams, tributaries, lakes, and ponds, that receive a discharge from your MS4;
b. For all such waters, the department has determined that stormwater controls are not needed based on wasteload allocations that are part of an approved TMDL that addresses the pollutants of concern or, if a TMDL has not been developed or approved, an equivalent analysis that determines sources and allocations for the pollutants of concern;
c. For the purpose of subdivision 5 of this subsection, the pollutants of concern include biochemical oxygen demand (BOD), sediment or a parameter that addresses sediment (such as total suspended solids, turbidity or siltation), pathogens, oil and grease, and any pollutant that has been identified as a cause of impairment of any water body that will receive a discharge from your MS4; and
d. The department has determined that future discharges from your MS4 do not have the potential to result in exceedances of water quality standards, including impairment of designated uses or other significant water quality impacts, including habitat and biological impacts.
C. If I am an operator of a regulated small MS4, how do I apply for a permit and when do I have to apply?
1. If you operate a regulated small MS4 under subsection B of this section, you must seek coverage under a permit issued by the department.
2. You must seek authorization to discharge under a general or individual permit, as follows:
a. If the department has issued a general permit applicable to your discharge and you are seeking coverage under the general permit, you must submit a registration statement that includes the information on your best management practices and measurable goals required by subdivision D 4 of this section. You may file your own registration statement, or you and other municipalities or governmental entities may jointly submit a registration statement. If you want to share responsibilities for meeting the minimum measures with other municipalities or governmental entities, you must submit a registration statement that describes which minimum measures you will implement and identify the entities that will implement the other minimum measures within the area served by your MS4. The general permit will explain any other steps necessary to obtain permit authorization.
b. (1) If you are seeking authorization to discharge under an individual permit and wish to implement a program under subsection D of this section, you must submit an application to the department that includes the information required under 9VAC25-875-920 F and subdivision D 4 of this section, an estimate of square mileage served by your small MS4, and any additional information that the department requests. A storm sewer map that satisfies the requirement of subdivision D 2 c (1) of this section will satisfy the map requirement in 9VAC25-875-920 F 7.
(2) If you are seeking authorization to discharge under an individual permit and wish to implement a program that is different from the program under subsection D of this section, you will need to comply with the permit application requirements of 9VAC25-875-950 C. You must submit both parts of the application requirements in 9VAC25-875-950 C 1 and 2 by March 10, 2003. You do not need to submit the information required by 9VAC25-875-950 C 1 b and C 2 regarding your legal authority, unless you intend for the permit writer to take such information into account when developing your other permit conditions.
(3) If allowed by the department, you and another regulated entity may jointly apply under either subdivision 2 b (1) or (2) of this subsection to be state co-permittees under an individual permit.
c. If your small MS4 is in the same urbanized urban area as a medium or large MS4 with a permit and that other MS4 is willing to have you participate in that MS4's stormwater program, you and the other MS4 may jointly seek a modification of the other MS4 permit to include you as a limited state co-permittee. As a limited state co-permittee, you will be responsible for compliance with the permit's conditions applicable to your jurisdiction. If you choose this option you will need to comply with the permit application requirements of 9VAC25-875-950, rather than the requirements of subsection D of this section. You do not need to comply with the specific application requirements of 9VAC25-875-950 C 1 c and d and 9VAC25-875-950 C 2 c (discharge characterization). You may satisfy the requirements in 9VAC25-875-950 C 1 e and 2 d (identification of a management program) by referring to the other MS4's stormwater management program.
d. NOTE: In referencing an MS4's stormwater management program, you should briefly describe how the existing plan will address discharges from your small MS4 or would need to be supplemented in order to adequately address your discharges. You should also explain your role in coordinating stormwater pollutant control activities in your MS4 and detail the resources available to you to accomplish the plan.
3. If you operate a regulated small MS4:
a. Designated under subdivision B 1 a of this section, you must apply for coverage under a permit or apply for a modification of an existing permit under subdivision 2 c of this subsection within 180 days of notice, unless the department grants a later date.
b. Designated under subdivision B 1 b of this section, you must apply for coverage under a permit or apply for a modification of an existing permit under subdivision 2 c of this subsection within 180 days of notice, unless the department grants a later date.
D. As an operator of a regulated small MS4, what will my MS4 permit require?
1. Your MS4 permit will require at a minimum that you develop, implement, and enforce a stormwater management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent practicable (MEP), to protect water quality, and to satisfy the appropriate water quality requirements of the Clean Water Act, the Virginia Erosion and Stormwater Management Act, and the State Water Control Law. Your stormwater management program must include the minimum control measures described in subdivision 2 of this subsection unless you apply for a permit under 9VAC25-875-950 C. For purposes of this section, narrative effluent limitations requiring implementation of best management practices (BMPs) are generally the most appropriate form of effluent limitations when designed to satisfy technology requirements (including reductions of pollutants to the maximum extent practicable) and to protect water quality. Implementation of best management practices consistent with the provisions of the stormwater management program required pursuant to this section and the provisions of the permit required pursuant to subsection C of this section constitutes compliance with the standard of reducing pollutants to the maximum extent practicable. The department will specify a time period of up to five years from the date of permit issuance for you to develop and implement your program.
2. Minimum control measures.
a. Public education and outreach on stormwater impacts.
(1) You must implement a public education program to distribute educational materials to the community or conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and the steps that the public can take to reduce pollutants in stormwater runoff.
(2) NOTE: You may use stormwater educational materials provided by the state, your tribe, EPA, environmental, public interest or trade organizations, or other MS4s. The public education program should inform individuals and households about the steps they can take to reduce stormwater pollution, such as ensuring proper septic system maintenance, ensuring the proper use and disposal of landscape and garden chemicals including fertilizers and pesticides, protecting and restoring riparian vegetation, and properly disposing of used motor oil or household hazardous wastes. The department recommends that the program inform individuals and groups how to become involved in local stream and beach restoration activities as well as activities that are coordinated by youth service and conservation corps or other citizen groups. The department recommends that the public education program be tailored, using a mix of locally appropriate strategies, to target specific audiences and communities. Examples of strategies include: distributing brochures or fact sheets, sponsoring speaking engagements before community groups, providing public service announcements, implementing educational programs targeted at school-age children, and conducting community-based projects such as storm drain stenciling, and watershed and beach cleanups. In addition, the department recommends that some of the materials or outreach programs be directed toward targeted groups of commercial, industrial, and institutional entities likely to have significant stormwater impacts. For example, providing information to restaurants on the impact of grease clogging storm drains and to garages on the impact of oil discharges. You are encouraged to tailor your outreach program to address the viewpoints and concerns of all communities, particularly minority and disadvantaged communities, as well as any special concerns relating to children.
b. Public involvement/participation.
(1) You must, at a minimum, comply with state, tribal, and local public notice requirements when implementing a public involvement/participation program.
(2) The department recommends that the public be included in developing, implementing, and reviewing your stormwater management program and that the public participation process should make efforts to reach out and engage all economic and ethnic groups. Opportunities for members of the public to participate in program development and implementation include serving as citizen representatives on a local stormwater management panel, attending public hearings, working as citizen volunteers to educate other individuals about the program, assisting in program coordination with other pre-existing programs, or participating in volunteer monitoring efforts. (Citizens should obtain approval where necessary for lawful access to monitoring sites.)
c. Illicit discharge detection and elimination.
(1) You must develop, implement, and enforce a program to detect and eliminate illicit discharges (as defined in 9VAC25-875-850) into your small MS4.
(2) You must:
(a) Develop, if not already completed, a storm sewer system map, showing the location of all outfalls and the names and location of all surface waters that receive discharges from those outfalls;
(b) To the extent allowable under state, tribal, or local law effectively prohibit, through ordinance or other regulatory mechanism, nonstormwater discharges into your storm sewer system and implement appropriate enforcement procedures and actions;
(c) Develop and implement a plan to detect and address nonstormwater discharges, including illegal dumping, to your system; and
(d) Inform public employees, businesses, and the general public of hazards associated with illegal discharges and improper disposal of waste.
(3) You need to address the following categories of nonstormwater discharges or flows (i.e., illicit discharges) only if you identify them as significant contributors of pollutants to your small MS4: water line flushing, landscape irrigation, diverted stream flows, rising groundwaters, uncontaminated groundwater infiltration (as defined in 40 CFR 35.2005(20)), uncontaminated pumped groundwater, discharges from potable water sources, foundation drains, air conditioning condensation, irrigation water, springs, water from crawl space pumps, footing drains, lawn watering, individual residential car washing, flows from riparian habitats and wetlands, dechlorinated swimming pool discharges, and street wash water. (Discharges or flows from fire-fighting activities are excluded from the effective prohibition against nonstormwater and need only be addressed where they are identified as significant sources of pollutants to surface waters.)
(4) NOTE: The department recommends that the plan to detect and address illicit discharges include the following four components: (i) procedures for locating priority areas likely to have illicit discharges, (ii) procedures for tracing the source of an illicit discharge, (iii) procedures for removing the source of the discharge, and (iv) procedures for program evaluation and assessment. The department recommends visually screening outfalls during dry weather and conducting field tests of selected pollutants as part of the procedures for locating priority areas. Illicit discharge education actions may include storm drain stenciling; a program to promote, publicize, and facilitate public reporting of illicit connections or discharges; and distribution of outreach materials.
d. Construction site stormwater runoff control.
(1) You must develop, implement, and enforce a program to reduce pollutants in any stormwater runoff to your small MS4 from construction activities that result in a land disturbance of greater than or equal to one acre, or equal to or greater than 2,500 square feet in all areas of the jurisdictions designated as subject to the Chesapeake Bay Preservation Area Designation and Management Regulations adopted pursuant to the Chesapeake Bay Preservation Act. Reduction of stormwater discharges from construction activity disturbing less than one acre must be included in your program if that construction activity is part of a larger common plan of development or sale that would disturb one acre or more. If the department waives requirements for stormwater discharges associated with small construction activity in accordance with the definition in 9VAC25-875-20, you are not required to develop, implement, or enforce a program to reduce pollutant discharges from such sites.
(2) Your program must include the development and implementation of, at a minimum:
(a) An ordinance or other regulatory mechanism to require erosion and sediment controls, as well as sanctions to ensure compliance, to the extent allowable under state, tribal, or local law;
(b) Requirements for construction site operators to implement appropriate erosion and sediment control best management practices;
(c) Requirements for construction site operators to control waste such as discarded building materials, concrete truck washout, chemicals, litter, and sanitary waste at the construction site that may cause adverse impacts to water quality;
(d) Procedures for site plan review which incorporate consideration of potential water quality impacts;
(e) Procedures for receipt and consideration of information submitted by the public; and
(f) Procedures for site inspection and enforcement of control measures.
(3) NOTE: Examples of sanctions to ensure compliance include nonmonetary penalties, fines, bonding requirements, or permit denials for noncompliance. The department recommends that procedures for site plan review include the review of individual pre-construction site plans to ensure consistency with erosion and sediment control requirements. Procedures for site inspections and enforcement of control measures could include steps to identify priority sites for inspection and enforcement based on the nature of the construction activity, topography, and the characteristics of soils and receiving water quality. You are encouraged to provide appropriate educational and training measures for construction site operators. You may wish to require a stormwater pollution prevention plan for construction sites within your jurisdiction that discharge into your system. (See 9VAC25-875-1030 L and subdivision E 2 of this section.) The department may recognize that another government entity may be responsible for implementing one or more of the minimum measures on your behalf.
e. Post-construction stormwater management in new development and redevelopment.
(1) You must develop, implement, and enforce a program to address stormwater runoff from new development and redevelopment projects that disturb greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale, that discharge into your small MS4. Your program must ensure that controls are in place that would prevent or minimize water quality impacts.
(2) You must:
(a) Develop and implement strategies that include a combination of structural and nonstructural best management practices (BMPs) appropriate for your community;
(b) Use an ordinance or other regulatory mechanism to address post-construction runoff from new development and redevelopment projects to the extent allowable under state, tribal, or local law; and
(c) Ensure adequate long-term operation and maintenance of BMPs.
(3) NOTE: If water quality impacts are considered from the beginning stages of a project, new development and potentially redevelopment provide more opportunities for water quality protection. The department recommends that the BMPs chosen be appropriate for the local community, minimize water quality impacts, and attempt to maintain pre-development runoff conditions. In choosing appropriate BMPs, the department encourages you to participate in locally based watershed planning efforts that attempt to involve a diverse group of stakeholders, including interested citizens. When developing a program that is consistent with this measure's intent, the department recommends that you adopt a planning process that identifies the municipality's program goals (e.g., minimize water quality impacts resulting from post-construction runoff from new development and redevelopment), implementation strategies (e.g., adopt a combination of structural and nonstructural BMPs), operation and maintenance policies and procedures, and enforcement procedures. In developing your program, you should consider assessing existing ordinances, policies, programs, and studies that address stormwater runoff quality. In addition to assessing these existing documents and programs, you should provide opportunities to the public to participate in the development of the program. Nonstructural BMPs are preventative actions that involve management and source controls such as: (i) policies and ordinances that provide requirements and standards to direct growth to identified areas, protect sensitive areas such as wetlands and riparian areas, maintain and increase open space (including a dedicated funding source for open space acquisition), provide buffers along sensitive water bodies, minimize impervious surfaces, and minimize disturbance of soils and vegetation; (ii) policies or ordinances that encourage infill development in higher density urban areas, and areas with existing infrastructure; (iii) education programs for developers and the public about project designs that minimize water quality impacts; and (iv) measures such as minimization of percent impervious area after development and minimization of directly connected impervious areas. Structural BMPs include: storage practices such as wet ponds and extended-detention outlet structures; filtration practices such as grassed swales, sand filters, and filter strips; and infiltration practices such as infiltration basins and infiltration trenches. The department recommends that you ensure the appropriate implementation of the structural BMPs by considering some or all of the following: pre-construction review of BMP designs; inspections during construction to verify BMPs are built as designed; post-construction inspection and maintenance of BMPs; and penalty provisions for the noncompliance with design, construction, or operation and maintenance. Stormwater technologies are constantly being improved, and the department recommends that your requirements be responsive to these changes, developments, or improvements in control technologies.
f. Pollution prevention/good housekeeping for municipal operations.
(1) You must develop and implement an operation and maintenance program that includes a training component and has the ultimate goal of preventing or reducing pollutant runoff from municipal operations. Using training materials that are available from EPA, state, tribe, or other organizations, your program must include employee training to prevent and reduce stormwater pollution from activities such as park and open space maintenance, fleet and building maintenance, new construction and land disturbances, and stormwater system maintenance.
(2) NOTE: The department recommends that, at a minimum, you consider the following in developing your program: maintenance activities, maintenance schedules, and long-term inspection procedures for structural and nonstructural stormwater controls to reduce floatables and other pollutants discharged from your separate storm sewers; controls for reducing or eliminating the discharge of pollutants from streets, roads, highways, municipal parking lots, maintenance and storage yards, fleet or maintenance shops with outdoor storage areas, salt/sand storage locations and snow disposal areas operated by you, and waste transfer stations; procedures for properly disposing of waste removed from the separate storm sewers and areas listed above (such as dredge spoil, accumulated sediments, floatables, and other debris); and ways to ensure that new flood management projects assess the impacts on water quality and examine existing projects for incorporating additional water quality protection devices or practices. Operation and maintenance should be an integral component of all stormwater management programs. This measure is intended to improve the efficiency of these programs and require new programs where necessary. Properly developed and implemented operation and maintenance programs reduce the risk of water quality problems.
3. If an existing VESMP requires you to implement one or more of the minimum control measures of subdivision 2 of this subsection, the department may include conditions in your permit that direct you to follow that VESMP's requirements rather than the requirements of subdivision 2 of this subsection. A VESMP is a local, state, or tribal municipal stormwater management program that imposes, at a minimum, the relevant requirements of subdivision 2 of this subsection.
4. a. In your permit application (either a registration statement for coverage under a general permit or an individual permit application), you must identify and submit to the department the following information:
(1) The best management practices (BMPs) that you or another entity will implement for each of the stormwater minimum control measures provided in subdivision 2 of this subsection;
(2) The measurable goals for each of the BMPs including, as appropriate, the months and years in which you will undertake required actions, including interim milestones and the frequency of the action; and
(3) The person responsible for implementing or coordinating your stormwater management program.
b. If you obtain coverage under a general permit, you are not required to meet any measurable goals identified in your registration statement in order to demonstrate compliance with the minimum control measures in subdivisions 2 c through f of this subsection unless, prior to submitting your registration statement, EPA or the department has provided or issued a menu of BMPs that addresses each such minimum measure. Even if no regulatory authority issues the menu of BMPs, however, you still must comply with other requirements of the general permit, including good faith implementation of BMPs designed to comply with the minimum measures.
c. NOTE: Either EPA or the department will provide a menu of BMPs. You may choose BMPs from the menu or select others that satisfy the minimum control measures.
5. a. You must comply with any more stringent effluent limitations in your permit, including permit requirements that modify or are in addition to the minimum control measures based on an approved total maximum daily load (TMDL) or equivalent analysis. The department may include such more stringent limitations based on a TMDL or equivalent analysis that determines such limitations are needed to protect water quality.
b. NOTE: The department strongly recommends that until the evaluation of the stormwater program in subsection G of this section, no additional requirements beyond the minimum control measures be imposed on regulated small MS4s without the agreement of the operator of the affected small MS4, except where an approved TMDL or equivalent analysis provides adequate information to develop more specific measures to protect water quality.
6. You must comply with other applicable permit requirements, standards and conditions established in the individual or general permit developed consistent with the provisions of 9VAC25-31-190 through 9VAC25-31-250, as appropriate.
7. Evaluation and assessment.
a. You must evaluate program compliance, the appropriateness of your identified best management practices, and progress towards achieving your identified measurable goals. The department may determine monitoring requirements for you in accordance with monitoring plans appropriate to your watershed. Participation in a group monitoring program is encouraged.
b. You must keep records required by the permit for at least three years. You must submit your records to the department only when specifically asked to do so. You must make your records, including a description of your stormwater management program, available to the public at reasonable times during regular business hours (see 9VAC25-875-900 for confidentiality provision). You may assess a reasonable charge for copying. You may require a member of the public to provide advance notice.
c. Unless you are relying on another entity to satisfy your permit obligations under subdivision E 1 of this section, you must submit annual reports to the department for your first permit term. For subsequent permit terms, you must submit reports in years two and four unless the department requires more frequent reports. As of the start date in Table 1 of 9VAC25-31-1020, all reports submitted in compliance with this subsection shall be submitted electronically by the owner, operator, or the duly authorized representative of the small MS4 to the department in compliance with this section and 40 CFR Part 3 (including, in all cases, 40 CFR Part 3 Subpart D), 9VAC25-875-940, and Part XI (9VAC25-31-950 et seq.) of the Virginia Pollutant Discharge Elimination System (VPDES) Permit Regulation. Part XI of 9VAC25-31 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of Part XI of 9VAC25-31, the owner, operator, or the duly authorized representative of the small MS4 may be required to report electronically if specified by a particular permit. Your report must include:
(1) The status of compliance with permit conditions, an assessment of the appropriateness of your identified best management practices and progress towards achieving your identified measurable goals for each of the minimum control measures;
(2) Results of information collected and analyzed, including monitoring data, if any, during the reporting period;
(3) A summary of the stormwater activities you plan to undertake during the next reporting cycle;
(4) A change in any identified best management practices or measurable goals for any of the minimum control measures; and
(5) Notice that you are relying on another governmental entity to satisfy some of your permit obligations (if applicable).
E. As an operator of a regulated small MS4, may I share the responsibility to implement the minimum control measures with other entities?
1. You may rely on another entity to satisfy your permit obligations to implement a minimum control measure if:
a. The other entity, in fact, implements the control measure;
b. The particular control measure, or component thereof, is at least as stringent as the corresponding permit requirement; and
c. The other entity agrees to implement the control measure on your behalf. In the reports you must submit under subdivision D 7 c of this section, you must also specify that you rely on another entity to satisfy some of your permit obligations. If you are relying on another governmental entity regulated under the permit program to satisfy all of your permit obligations, including your obligation to file periodic reports required by subdivision D 7 c of this section, you must note that fact in your registration statement, but you are not required to file the periodic reports. You remain responsible for compliance with your permit obligations if the other entity fails to implement the control measure (or component thereof). Therefore, the department encourages you to enter into a legally binding agreement with that entity if you want to minimize any uncertainty about compliance with your permit.
2. In some cases, the department may recognize, either in your individual permit or in a general permit, that another governmental entity is responsible under a permit for implementing one or more of the minimum control measures for your small MS4. Where the department does so, you are not required to include such minimum control measure(s) in your stormwater management program. Your permit may be reopened and modified to include the requirement to implement a minimum control measure if the entity fails to implement it.
F. As an operator of a regulated small MS4, what happens if I don't comply with the application or permit requirements in subsections C through E of this section? Permits are enforceable under the Clean Water Act and the Virginia Erosion and Stormwater Management Act. Violators may be subject to the enforcement actions and penalties described in Clean Water Act §§ 309(b), (c), and (g) and 505 or under §§ 62.1-44.15:39 through 62.1-44.15:48 of the Code of Virginia and Article 5 of the State Water Control Law. Compliance with a permit issued pursuant to § 402 of the Clean Water Act is deemed compliance, for purposes of §§ 309 and 505, with §§ 301, 302, 306, 307, and 403, except any standard imposed under § 307 for toxic pollutants injurious to human health. If you are covered as a state co-permittee under an individual permit or under a general permit by means of a joint registration statement, you remain subject to the enforcement actions and penalties for the failure to comply with the terms of the permit in your jurisdiction except as set forth in subdivision E 2 of this section.
G. Will the small MS4 stormwater program regulations at subsections B through F of this section change in the future? EPA intends to conduct an enhanced research effort and compile a comprehensive evaluation of the NPDES MS4 stormwater program. The board will reevaluate the regulations based on data from the EPA NPDES MS4 stormwater program, from research on receiving water impacts from stormwater, and the effectiveness of best management practices (BMPs), as well as other relevant information sources.
9VAC25-875-980. General permits.
A. The department may issue a general permit in accordance with the following:
1. The general permit shall be written to cover one or more categories or subcategories of discharges, except those covered by individual permits, within a geographic area. The area should correspond to existing geographic or political boundaries, such as:
a. Designated planning areas under §§ 208 and 303 of CWA;
b. Sewer districts or sewer authorities;
c. City, county, or state political boundaries;
d. State highway systems;
e. Standard metropolitan statistical areas as defined by the Office of Management and Budget;
f. Urbanized Urban areas with a population of 50,000 or more people as designated determined by the latest decennial census by the Bureau of the Census according to criteria in 30 FR 15202 (May 1, 1974); or
g. Any other appropriate division or combination of boundaries.
2. The general permit may be written to regulate one or more categories within the area described in subdivision 1 of this subsection, where the sources within a covered subcategory of discharges are stormwater point sources.
3. Where sources within a specific category of dischargers are subject to water quality-based limits imposed pursuant to 9VAC25-875-1030, the sources in that specific category or subcategory shall be subject to the same water quality-based effluent limitations.
4. The general permit must clearly identify the applicable conditions for each category or subcategory of dischargers covered by the permit.
5. The general permit may exclude specified sources or areas from coverage.
B. Administration.
1. General permits may be issued, modified, revoked and reissued, or terminated in accordance with applicable requirements of this chapter.
2. Authorization to discharge.
a. Except as provided in subdivisions 2 e and 2 f of this subsection, dischargers seeking coverage under a general permit shall submit to the department a written notice of intent to be covered by the general permit. A discharger who fails to submit a notice of intent in accordance with the terms of the permit is not authorized to discharge, under the terms of the general permit unless the general permit, in accordance with subdivision 2 e of this subsection, contains a provision that a notice of intent is not required or the department notifies a discharger (or treatment works treating domestic sewage) that it is covered by a general permit in accordance with subdivision 2 f of this subsection. A complete and timely notice of intent (NOI) to be covered in accordance with general permit requirements fulfills the requirements for permit applications for the purposes of this chapter. As of the start date in Table 1 of 9VAC25-31-1020, all notices of intent submitted in compliance with this subdivision shall be submitted electronically by the discharger (or treatment works treating domestic sewage) to the department in compliance with this subdivision 2 and 40 CFR Part 3 (including, in all cases, 40 CFR Part 3 Subpart D), 9VAC25-875-940, and Part XI (9VAC25-31-950 et seq.) of the Virginia Pollutant Discharge Elimination System (VPDES) Permit Regulation. Part XI of 9VAC25-31 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of Part XI of 9VAC25-31, dischargers or treatment works treating domestic sewage may be required to report electronically if specified by a particular permit.
b. The contents of the notice of intent shall be specified in the general permit and shall require the submission of information necessary for adequate program implementation, including at a minimum, the legal name and address of the owner or operator, the facility name and address, type of facility or discharges, and the receiving stream, and other required data elements as identified in Appendix A to 40 CFR Part 127 as adopted by reference in 9VAC25-31-1030. All notices of intent shall be signed in accordance with 9VAC25-875-940.
c. General permits shall specify the deadlines for submitting notices of intent to be covered and the date or dates when a discharger is authorized to discharge under the permit.
d. General permits shall specify whether a discharger that has submitted a complete and timely notice of intent to be covered in accordance with the general permit and that is eligible for coverage under the permit is authorized to discharge in accordance with the permit either upon receipt of the notice of intent by the department after a waiting period specified in the general permit on a date specified in the general permit or upon receipt of notification of inclusion by the department. Coverage may be terminated or revoked in accordance with subdivision 3 of this subsection.
e. Stormwater discharges associated with small construction activity may, at the discretion of the department, be authorized to discharge under a general permit without submitting a notice of intent where the department finds that a notice of intent requirement would be inappropriate. In making such a finding, the department shall consider the (i) type of discharge, (ii) expected nature of the discharge, (iii) potential for toxic and conventional pollutants in the discharges, (iv) expected volume of the discharges, (v) other means of identifying discharges covered by the permit, and (vi) estimated number of discharges to be covered by the permit. The department shall provide in the public notice of the general permit the reasons for not requiring a notice of intent.
f. The department may notify a discharger that it is covered by a general permit, even if the discharger has not submitted a notice of intent to be covered. A discharger so notified may request an individual permit under subdivision 3 c of this subsection.
3. Requiring an individual permit.
a. The department may require any discharger authorized by a general permit to apply for and obtain an individual permit. Any interested person may request the department to take action under this subdivision. Cases where an individual permit may be required include the following:
(1) The discharger is not in compliance with the conditions of the general permit;
(2) A change has occurred in the availability of demonstrated technology or practices for the control or abatement of pollutants applicable to the point source;
(3) Effluent limitation guidelines are promulgated for point sources covered by the general permit;
(4) A water quality management plan, established by the department pursuant to 9VAC25-720, containing requirements applicable to such point sources is approved;
(5) Circumstances have changed since the time of the request to be covered so that the discharger is no longer appropriately controlled under the general permit, or either a temporary or permanent reduction or elimination of the authorized discharge is necessary;
(6) The discharge is a significant contributor of pollutants. In making this determination, the department may consider the following factors:
(a) The location of the discharge with respect to surface waters;
(b) The size of the discharge;
(c) The quantity and nature of the pollutants discharged to surface waters; and
(d) Other relevant factors;
b. Permits required on a case-by-case basis.
(1) The department may determine, on a case-by-case basis, that certain stormwater discharges, and certain other facilities covered by general permits that do not generally require an individual permit may be required to obtain an individual permit because of their contributions to water pollution.
(2) Whenever the department decides that an individual permit is required under this subsection, except as provided in subdivision 3 b (3) of this subsection, the department shall notify the discharger in writing of that decision and the reasons for it and shall send an application form with the notice. The discharger must apply for a permit within 60 days of notice, unless permission for a later date is granted by the department. The question whether the designation was proper will remain open for consideration during the public comment period for the draft permit and in any subsequent public hearing.
(3) Prior to a case-by-case determination that an individual permit is required for a stormwater discharge under this subsection, the department may require the discharger to submit a permit application or other information regarding the discharge under the State Water Control Law and § 308 of the CWA. In requiring such information, the department shall notify the discharger in writing and shall send an application form with the notice. The discharger must apply for a permit under 9VAC25-875-950 A 1 within 60 days of notice or under 9VAC25-875-950 A 8 within 180 days of notice, unless permission for a later date is granted by the department. The question whether the initial designation was proper will remain open for consideration during the public comment period for the draft permit and in any subsequent public hearing.
c. Any owner or operator authorized by a general permit may request to be excluded from the coverage of the general permit by applying for an individual permit. The owner or operator shall submit an application under 9VAC25-875-920 with reasons supporting the request. The request shall be processed under the applicable parts of this chapter. The request shall be granted by issuing of an individual permit if the reasons cited by the owner or operator are adequate to support the request.
d. When an individual permit is issued to an owner or operator otherwise subject to a general permit, the applicability of the general permit to the individual permit permittee is automatically terminated on the effective date of the individual permit.
e. A source excluded from a general permit solely because it already has an individual permit may request that the individual permit be revoked and that it be covered by the general permit. Upon revocation of the individual permit, the general permit shall apply to the source.
VA.R. Doc. No. R25-7991; Filed October 30, 2024