TITLE 9. ENVIRONMENT
REGISTRAR'S NOTICE: The
State Water Control Board is claiming an exemption from Article 2 of the
Administrative Process Act in accordance with § 2.2-4006 A 8 of the Code
of Virginia, which exempts general permits issued by the State Water Control
Board pursuant to the State Water Control Law (§ 62.1-44.2 et seq.), Chapter 24 (§ 62.1-242 et seq.) of Title 62.1, and
Chapter 25 (§ 62.1-254 et seq.) of Title 62.1 if the
board (i) provides a Notice of Intended Regulatory Action in conformance with
the provisions of § 2.2-4007.01; (ii) following the passage
of 30 days from the publication of the Notice of Intended Regulatory Action,
forms a technical advisory committee composed of relevant stakeholders,
including potentially affected citizens groups, to assist in the development of
the general permit; (iii) provides notice and receives oral and written comment
as provided in § 2.2-4007.03; and (iv) conducts at least
one public hearing on the proposed general permit.
Title of Regulation: 9VAC25-680. Virginia Water
Protection General Permit for Linear Transportation Projects (amending 9VAC25-680-10 through 9VAC25-680-100;
adding 9VAC25-680-15, 9VAC25-680-25, 9VAC25-680-27, 9VAC25-680-35; repealing
9VAC25-680-95).
Statutory Authority: §§ 62.1-44.15 and 62.1-44.15:5
of the Code of Virginia; § 401 of the Clean Water Act (33 USC § 1251
et seq.).
Effective Date: August 2, 2016.
Agency Contact: Brenda Winn, Department of Environmental
Quality, 629 East Main Street, P.O. Box 1105, Richmond, VA 233218, telephone
(804) 698-4516, FAX (804) 698-4032, or email brenda.winn@deq.virginia.gov.
Summary:
The regulatory action reissues the existing general permit
that expires on August 1, 2016. The amendments (i) revise or clarify which
activities in specific water sources require application for a permit
authorization and which activities are excluded; (ii) revise and clarify the
application process, including the administrative and technical information
required to achieve a complete permit application; (iii) revise and clarify the
compensatory mitigation requirements, including the sequencing of acceptable
compensatory mitigation actions and compensatory mitigation provisions, the
requirements for compensating impacts to open waters, or the compensation
necessary for temporary impacts; (iv) modify provisions related to application
processing, informational requirements, or actions occurring post-permit authorization
for coverage; (v) modify permit authorization transitions between general
permit cycles; (vi) delete the authorization term of seven years and provisions
for continuation of permit authorization coverage; (vii) incorporate certain
federal regulatory provisions; (viii) clarify and update definitions; (ix)
reorganize the regulation; and (x) correct grammar, spelling, and references.
9VAC25-680-10. Definitions.
The words and terms used in this chapter shall have the
meanings defined in the State Water Control Law (§ 62.1-44.2 et seq. of
the Code of Virginia) and the Virginia Water Protection (VWP) Permit Program
Regulation (9VAC25-210) unless a different meaning is required by the
context clearly indicates otherwise or unless otherwise or is
indicated below.
"Bank protection" means measures employed to
stabilize channel banks and combat existing erosion problems. Such measures may
include the construction of riprap revetments, sills, rock vanes, beach
nourishment, breakwaters, bulkheads, groins, spurs, levees, marsh toe
stabilization, anti-scouring devices, and submerged sills.
"Bioengineering method" means a biological measure
incorporated into a facility design to benefit water quality and minimize
adverse effects to aquatic resources, to the maximum extent practicable, for
long-term aquatic resource protection and improvement.
"Channelization" means the alteration of a
stream channel by widening, deepening, straightening, cleaning or paving
certain areas.
"Coverage" means authorization to conduct a
project in accordance with a VWP general permit.
"Cross-sectional drawing" means a graph or plot
of ground elevation across a waterbody or a portion of it, usually along a line
perpendicular to the waterbody or direction of flow.
"Emergent wetland" means a class of wetlands
characterized by erect, rooted, herbaceous plants growing in water or on a
substrate that is at least periodically deficient in oxygen as a result of
excessive water content, excluding mosses and lichens. This vegetation is
present for most of the growing season in most years and is usually dominated
by perennial plants.
"FEMA" means Federal Emergency Management
Agency.
"Forebay" means a deeper area at the upstream
end of a stormwater management facility that would be maintained through
excavation.
"Forested wetland" means a class of wetlands
characterized by woody vegetation that is six meters (20 feet) tall or taller.
These areas normally possess an overstory of trees, an understory of trees or
shrubs, and an herbaceous layer.
"Greater than one acre" means more than 1.00
acre (43,560 square feet).
"Impacts" means results caused by human-induced
activities conducted in surface waters, as specified in § 62.1-44.15:20 A of
the Code of Virginia.
"DEQ" means the Department of Environmental
Quality.
"Independent utility" means a test to determine
what constitutes a single and complete project. A project is considered to have
independent utility if it would be constructed absent the construction of other
projects in the project area. Portions of a multi-phase project that depend
upon other phases of the project do not have independent utility. Phases of a
project that would be constructed even if the other phases are not built can be
considered as separate single and complete projects with independent public
and economic utility.
"Isolated Wetland of Minimal Ecological Value
(IWOMEV)" means a wetland that (i) does not have a surface water
connection to other state waters; (ii) is less than one-tenth of an acre in
size; (iii) is not located in a Federal Emergency Management Agency designated
100-year floodplain; (iv) is not identified by the Virginia Natural Heritage
Program as a rare or state significant natural community; (v) is not forested;
and (vi) does not contain listed federal or state threatened or endangered
species.
"Less than one-half of an acre" means 0.00 to
0.49 acre (0 to 21,779 square feet).
"Linear transportation project" means a project for
the construction, expansion, modification or improvement of features such as, but
not limited to, roadways, railways, trails, bicycle and pedestrians paths, and
airport runways and taxiways, including all attendant features both temporary
and permanent. Nonlinear features commonly associated with transportation
projects, such as, but not limited to, vehicle maintenance or storage
buildings, parking lots, train stations, or aircraft hangars are not included
in this definition.
"Notice of project completion" means a statement
[ signed submitted ] by the permittee or
authorized agent that the authorized activities and any required compensatory
mitigation have been completed.
"Open water" means an area that, during a year
with normal patterns of precipitation, has standing water for sufficient
duration to establish an ordinary high water mark. The term "open
water" includes lakes and ponds but does not include ephemeral waters,
stream beds, or wetlands.
"Ordinary high water" or "ordinary high
water mark" means the line on the shore established by the fluctuations of
water and indicated by physical characteristics such as clear, natural line
impressed on the bank; shelving; changes in the character of soil; destruction
of terrestrial vegetation; the presence of litter and debris; or other
appropriate means that consider the characteristics of the surrounding areas.
"Perennial stream" means a well-defined channel
that contains water year round during a year of normal rainfall. Generally, the
water table is located above the streambed for most of the year and groundwater
is the primary source for stream flow. A perennial stream exhibits the typical
biological, hydrological, and physical characteristics commonly associated with
the continuous conveyance of water.
"Permanent impacts" means those impacts to
surface waters, including wetlands, that cause a permanent alteration of the
physical, chemical, or biological properties of the surface waters, or of the
functions and values of a wetland.
"Person" means an individual, corporation,
partnership, association, governmental body, municipal corporation, or any
other legal entity.
"Riprap" means a layer of nonerodible material
such as stone or chunks of concrete.
"Scrub-shrub wetland" means a class of wetlands
dominated by woody vegetation less than six meters (20 feet) tall. The species
include tree shrubs, young trees, and trees or shrubs that are small or stunted
because of environmental conditions.
"Single and complete project" means the total
project proposed or accomplished by a person, which also has independent
utility, as defined in this section. For linear projects, the "single and
complete project" (e.g., a single and complete crossing) will apply to
each crossing of a separate surface water (e.g., a single waterbody) water
body) and to multiple crossings of the same waterbody water body
at separate and distinct locations. Phases of a project that have independent
public and economic utility may each be considered single and complete.
"State program general permit (SPGP)" means a
general permit issued by the Department of the Army in accordance with 33
USC 1344(e), 33 CFR 325.2(e)(2), 33 USC § 1344 and 33 CFR
325.3(b) 33 CFR 325.5(c)(3) and that is founded on a state program.
The SPGP is designed to avoid duplication between the federal and state
programs.
"Stream bed" means the substrate of a stream, as
measured between the ordinary high water marks along a length of stream. The
substrate may consist of organic matter, bedrock or inorganic particles that
range in size from clay to boulders, or a combination of both. Areas contiguous
to the stream bed, but outside of the ordinary high water marks, are not
considered part of the stream bed.
"Surface waters" means all state waters that are
not ground water as defined in § 62.1-255 of the Code of Virginia.
"Temporary impacts" are those impacts to surface
waters, including wetlands, that do not cause a permanent alteration of the
physical, chemical, or biological properties of the surface water, or of the
functions and values of a wetland. Temporary impacts include activities in
which the ground is restored to its preconstruction conditions, contours, or
elevations, such that previous functions and values are restored.
"Up to 300 linear feet" means >0.00 to
300.00 linear feet or less, as measured along the center of the main
channel of the stream segment.
"Up to 1500 1,500 linear feet" means >0.00
to 1500.00 1,500.00 linear feet or less, as measured along
the center of the main channel of the stream segment.
"Up to one-tenth of an acre" means 0.10 acre
(4,356 square feet) or less.
"Up to two acres" means 2.00 acres (87,120 square
feet) or less.
"Utility line" means a pipe or pipeline for the
transportation of any gaseous, liquid, liquefiable or slurry substance, for any
purpose, and a cable, line, or wire for the transmission for any purpose of
electrical energy, telephone, and telegraph messages and radio and television
communication. The term utility line does not include activities which drain a
surface water to convert it to an upland, such as drainage tiles or french
drains; however, it does apply to pipes conveying drainage from another area.
9VAC25-680-15. Statewide information requirements.
The board may request (i) such plans, specifications, and
other pertinent information as may be necessary to determine the effect of an
applicant's discharge on the quality of state waters or (ii) such other
information as may be necessary to accomplish the purposes of this chapter. Any
owner, permittee, or person applying for a VWP permit or general permit
coverage shall provide the information requested by the board.
9VAC25-680-20. Purpose; delegation of authority; effective
date of VWP general permit.
A. The purpose of this [ regulation chapter ]
is to establish VWP General Permit Number WP3 under [ the VWP permit program
regulation 9VAC25-210 ] to govern permanent and temporary
impacts related to the construction and maintenance of Virginia Department of
Transportation (VDOT) or other linear transportation projects. Applications for
coverage under this VWP general permit shall be processed for approval,
approval with conditions, or denial by the board. Authorization,
authorization Coverage, coverage with conditions, or application
denial by the board shall constitute the VWP general permit action. Each VWP
general permit action and shall follow all provisions in the State
Water Control Law (§ 62.1-44.2 et seq. of the Code of Virginia), except for the
public comment and participation provisions, from which each VWP general permit
action is exempt.
B. The director or his designee may perform any act of the
board provided under this chapter, except as limited by § 62.1-44.14
of the Code of Virginia.
C. This VWP general permit regulation will become
effective on August 1, 2006, and will expire on August 1, 2016.
D. Authorization to impact surface waters under this VWP
general permit is effective upon compliance with all the provisions of
9VAC25-680-30. Notwithstanding the expiration date of this general permit
regulation, authorization to impact surface waters under this VWP general
permit will continue for seven years.
9VAC25-680-25. Authorization for coverage under VWP general
permit effective August 1, 2006.
A. All complete applications or notifications received by
the board through 11:59 p.m. on August 1, 2016, shall be processed in
accordance with the VWP general permit regulation in effect August 1, 2006,
through August 1, 2016. If the application or notification is incomplete or if
there is not adequate time as allowed by § 62.1-44.15:21 of the Code of
Virginia to make a completeness determination, the applicant shall reapply for
coverage under the VWP general permit effective August 2, 2016, or apply for a
VWP individual permit, including payment of any required permit application
fee. No refund of permit application fees shall be made.
B. VWP general permit authorizations granted through 11:59
p.m. on August 1, 2016, shall remain in full force and effect until 11:59 p.m.
on the expiration date stated on the VWP authorization cover page, unless
otherwise revoked or terminated or unless a notice of project completion is
received by the board on or before that date. Any permittee that desires to
continue an authorized activity beyond the stated expiration date must reapply
for coverage under the VWP general permit effective August 2, 2016, pursuant to
its terms, standards, and conditions, or apply for a VWP individual permit,
including payment of any required permit application fee. This section shall
only apply to permittees holding valid authorizations for coverage granted
under the VWP general permit effective August 1, 2006, through August 1, 2016.
9VAC25-680-27. VWP general permit coverage; transition;
continuation.
A. All applications or notifications received on or after
August 2, 2016, will be processed in accordance with the VWP general permit
regulation effective August 2, 2016.
B. The general permit in 9VAC25-680-100 is effective
August 2, 2016, and expires August 1, [ 2031 2026 ].
Any coverage that is granted pursuant to 9VAC25-680-30 shall remain in full force
and effect until 11:59 p.m. on August 1, [ 2031 2026 ],
unless the general permit coverage is terminated or revoked [ or
unless a notice of project completion is received by the board ] on
or before this date. Where a permittee that has received general permit
coverage desires to continue or complete the authorized activities beyond
August 1, [ 2031 2026 ], the permittee
shall reapply for new general permit coverage or for a VWP individual permit,
including payment of any required permit application fee. Activities in surface
waters requiring a permit shall not commence or continue until VWP general
permit coverage is granted or a VWP individual permit is issued by the board.
C. Application may be made at any time for a VWP
individual permit in accordance with 9VAC25-210. Activities in surface waters
requiring a permit shall not commence or continue until VWP general permit
coverage is granted or a VWP individual permit is issued by the board.
9VAC25-680-30. Authorization to impact surface waters.
A. Any person governed by this granted coverage
under the VWP general permit is authorized to effective August 2,
2016, may permanently or temporarily impact up to two acres of nontidal
wetlands or open water and up to 1,500 linear feet of nontidal stream bed for
linear transportation projects, provided that:
1. The applicant submits notification as required in 9VAC25-680-50
and 9VAC25-680-60.
2. The applicant remits the any required permit
application processing fee in accordance with 9VAC25-20.
3. The applicant receives general permit coverage from the
Department of Environmental Quality and complies with the limitations and
other requirements of 9VAC25-680-100 the VWP general permit; the
general permit coverage [ letter ]; the Clean Water
Act, as amended; and the State Water Control Law and attendant regulations.
4. The applicant receives approval from the Virginia
Department of Environmental Quality.
5. 4. The applicant has not been required to
obtain a VWP individual permit under [ the VWP permit regulation
(9VAC25-210) 9VAC25-210 ] for the proposed project impacts. The
applicant, at his discretion, may seek a VWP individual permit, or
coverage under another applicable VWP general permit, in lieu of
coverage under this VWP general permit.
6. 5. Impacts, both temporary and permanent,
result from a single and complete project, including all attendant features.
a. Where a road segment (e.g., the shortest segment of a road
with independent utility that is part of a larger project) has multiple
crossings of state waters (several single and complete projects), the board may
at its discretion require a VWP individual permit.
b. For the purposes of this chapter, when an interchange has
multiple crossings of state waters, the entire interchange shall be considered
the single and complete project.
7. 6. The stream impact criterion applies to all
components of the project, including structures and stream channel
manipulations.
8. 7. Dredging does not exceed 5,000 cubic
yards.
9. [ Compensation ] 8. When
required, [ compensation ] for unavoidable impacts is
provided in accordance with 9VAC25-680-70 and 9VAC25-210-116.
B. Activities that may be authorized granted
coverage under this VWP general permit include the construction, expansion,
modification, or improvement of linear transportation crossings (e.g.,
highways, railways, trails, bicycle and pedestrian paths, and airport runways
and taxiways, including all attendant features both temporary and permanent).
C. The board waives the requirement for coverage under a VWP general
permit for activities that occur in an isolated wetland of minimal ecological
value, as defined in 9VAC25-680-10 9VAC25-210-10. Any
Upon request by the board, any person claiming this waiver bears the
burden to shall demonstrate to the satisfaction of the board
that he qualifies for the waiver.
D. Receipt of Coverage under this VWP general
permit does not relieve the permittee of the responsibility to comply with any
other applicable federal, state, or local statute, ordinance, or
regulation.
E. In issuing this VWP general permit, the board has not
taken into consideration the structural stability of the proposed structure or
structures.
F. E. Coverage under a nationwide or regional
permit promulgated by the U.S. Army Corps of Engineers (USACE), and for which
the board has issued § 401 certification existing in accordance with
9VAC25-210-130 H as of the effective date of this regulation August
2, 2016, shall constitute coverage under this VWP general permit [ , ]
unless a state program general permit (SPGP) is approved required
and granted for the covered activity or impact. Notwithstanding
any other provision, activities authorized under a nationwide or regional
permit promulgated by the USACE and certified by the board in accordance with
9VAC25-210-130 do not need to obtain coverage under this VWP general permit
unless a state programmatic general permit is approved for the covered activity
or impact.
G. F. When the board determines on a
case-by-case basis that concerns for water quality and the aquatic environment
so indicate, the board may require individual applications and a
VWP individual permits permit in accordance with 9VAC25-210-130 B
rather than approving granting coverage under this VWP general
permit.
9VAC25-680-35. Administrative continuance.
Beginning on August 2, 2016, in any case where an existing
permittee has submitted a timely and complete notification or application for
coverage under the next consecutive VWP general permit in accordance with
9VAC25-680-50 and 9VAC25-680-60 and the board, through no fault of the
permittee, does not issue the next consecutive VWP general permit with an
effective date on or before the expiration date of the expiring VWP general
permit, the conditions of that expiring VWP general permit and any requirements
of coverage granted under it shall continue in force until the effective date
of the next consecutive VWP general permit.
9VAC25-680-40. Exceptions to coverage.
A. Authorization for coverage Coverage under
this VWP general permit will not apply in the following areas: is not
required if the activity is excluded from permitting in accordance with
9VAC25-210-60.
1. Wetlands composed of 10% or more of the following
species (singly or in combination) in a vegetative stratum: Atlantic white
cedar (Chamaecyparis thyoides), bald cypress (Taxodium distichum), water tupelo
(Nyssa aquatica), or overcup oak (Quercus lyrata). Percentages shall be based
upon either basal area or percent areal cover in the area of impact.
2. Surface waters where the proposed activity will impact
federal or state listed or proposed threatened or endangered species or
proposed or designated critical habitat.
B. Authorization for coverage Coverage under
this VWP general permit cannot be used in combination with authorizations
for coverage under other VWP general permits in order to impact greater
than two acres of nontidal wetlands or open water or greater than 1,500 linear
feet of nontidal stream bed. More than one authorization for Granting
coverage under this VWP general permit more than once for a single and
complete project is prohibited, except when the cumulative impact to surface
waters does not exceed the limits specified here.
C. This VWP general permit may not cannot be
used to authorize for nonlinear features commonly associated with
transportation projects, such as, but not limited to, vehicle maintenance or
storage buildings, parking lots, train stations, or aircraft hangars.
D. The activity to impact surface waters shall not have been
prohibited by state law or regulations, nor shall it contravene applicable
Water Quality Standards (9VAC25-260).
E. The board shall deny application for coverage under
this VWP general permit to any applicant conducting activities that cause, may
reasonably be expected to cause, or may be contributing to a violation of water
quality standards, including discharges or discharge-related activities that
are likely to significantly affect aquatic life, or for activities that
together with other existing or proposed impacts to wetlands will cause or
contribute to a significant impairment of state waters or fish and wildlife
resources.
F. This VWP general permit does not authorize activities that
cause more than minimal changes to the peak hydraulic flow characteristics,
that significantly increase flooding, or that cause more than minimal
degradation of the water quality of a stream.
G. This Coverage under this VWP general permit may
shall not be used granted for:
1. Construction of a stormwater management facility in
perennial streams or in oxygen- or waters designated as
oxygen-impaired or temperature-impaired waters (does not include
wetlands).
2. The construction of an irrigation impoundment on a
perennial stream.
3. Any water withdrawal activities.
4. The location of animal feeding operations or waste storage
facilities in state waters.
5. The pouring of wet or uncured concrete or the use
of tremie concrete or grout bags in state waters, unless the area is
contained within a cofferdam or the work is performed in the dry, or
unless approved by DEQ the Department of Environmental Quality.
6. Return flow discharges from dredge disposal sites.
7. Overboard disposal of dredge materials.
8. Dredging in marinas.
9. Dredging of shellfish areas, submerged aquatic vegetation
beds and or other highly productive areas.
10. Federal navigation projects.
11. The Any activity in surface waters that will
impact federal or state listed [ or proposed ] threatened
or endangered species or [ proposed or ] designated
critical habitat, or [ be the result in a ]
taking of threatened or endangered species in accordance with the following:
a. As pursuant to § 29.1-564 of the Code of Virginia, the
taking, transportation, processing, sale, or offer for sale within the
Commonwealth of any fish or wildlife appearing on any list of threatened or
endangered species published by the United States Secretary of the Interior
pursuant to the provisions of the federal Endangered Species Act of 1973 (P.L.
Public Law 93-205), or any modifications or amendments thereto, is
prohibited except as provided in § 29.1-568 of the Code of Virginia.
b. As pursuant to § 29.1-566 of the Code of Virginia and
4VAC15-20-130 B and C, the taking, transportation, processing, sale, or offer
for sale within the Commonwealth of any [ state-listed state
listed ] endangered or threatened species is prohibited except as
provided in § 29.1-568 of the Code of Virginia.
12. Any activity in wetlands composed of 10% or more, singularly
or in combination, based upon either basal area or percent areal cover in the
area of impact, in a vegetative stratum: Atlantic white cedar (Chamaecyparis
thyoides), bald cypress (Taxodium distichum), water tupelo (Nyssa aquatica), or
overcup oak (Quercus lyrata).
13. Any activity in tidal waters.
9VAC25-680-50. Notification.
A. Notification to the board will be required prior to
commencing construction, as follows:
1. When the Virginia Department of Transportation is the
applicant for coverage under this VWP general permit, the notification
requirements shall be in accordance with this section and 9VAC25-680-60, unless
otherwise authorized by the Department of Environmental Quality.
1. 2. An application for authorization of
coverage for proposed, permanent nontidal wetland or open water impacts
greater than one-tenth of an acre, or [ of for ]
proposed permanent nontidal stream bed impacts greater than 300 linear feet,
shall include all information pursuant to 9VAC25-680-60 B, except for
9VAC25-680-60 B 20 when the application is for a Virginia Department of
Transportation (VDOT) administered project. VDOT shall provide the information
in 9VAC25-680-60 B 20 through the VDOT State Environmental Review Process, the
National Environmental Policy Act (42 USC § 4321 et seq.) (for federal
actions), or the VDOT Geographic Information System. Compensatory
mitigation may be required for all permanent impacts in accordance with
Parts I, II, and III of this VWP general permit regulation. All temporary
impacts shall be restored to preexisting conditions, as per Parts I, II, and
III of this VWP general permit regulation.
2. 3. An application for the authorization of
coverage for proposed, permanent nontidal wetland or open water impacts
up to one-tenth of an acre, or [ of for ]
proposed, permanent nontidal stream bed impacts up to 300 linear feet,
shall be submitted as follows in accordance with either subdivision 3
a or 3 b of this subsection:
a. For a proposed VDOT-administered project that is not
subject to subdivision 2 c of this subsection, the application shall include
the information required by subdivisions 1 through 8, 13, 15, and 21 of
9VAC25-680-60 B. The VDOT Quarterly Reporting of Impacts Less Than One-Tenth
Acre application may be used, provided that it contains the required
information. Compensatory mitigation may be required for all permanent impacts
once the notification limits of one-tenth acre wetlands or open water, or 300
linear feet of stream bed, are exceeded. All temporary impacts, regardless of
amount, shall be restored to preexisting conditions, as per Parts I and III of
this VWP general permit regulation. For any proposed project in
wetlands, open water, streams, or compensatory mitigation sites that are under
a deed restriction, conservation easement, declaration of restrictive covenant,
or other land use protective instrument (hereafter "protected
areas"), when such restriction, easement, covenant, or instrument is the
result of a federal or state permit action and is specific to activities in
wetlands and compensatory mitigation sites, the application shall include all
of the information required by 9VAC25-680-60 B. Compensatory mitigation may be
required for all permanent impacts.
b. For all other projects that are not subject to subdivision
2 c of this subsection, the application shall include the information
required by subdivisions 1 through 9, 13, 15, 20, and 21 1 through 7,
11, 12, 15, and 16 of 9VAC25-680-60 B, and documentation that
verifies the quantity and type of impacts. Compensatory mitigation may be
required for all permanent impacts once the notification limits of one-tenth
acre wetlands or open water, or 300 linear feet of stream bed, are exceeded,
and if required, the application shall include the information in 9VAC25-680-60
B 13. All temporary impacts, regardless of amount, shall be restored to
preexisting conditions, as per Parts I and III of this VWP general permit
regulation.
c. For any proposed project in wetlands, open water,
streams, or compensatory mitigation sites that are under a deed restriction,
conservation easement, restrictive covenant, or other land use protective
instrument (hereafter protected areas), when such restriction, easement,
covenant, or instrument is the result of a federal or state permit action and
is specific to activities in wetlands and compensatory mitigation sites, the
application shall include all of the information required by 9VAC25-680-60 B,
and documentation that verifies the quantity and type of impacts. Application
for a VDOT-administered project shall provide the required information in
9VAC25-680-60 B 20 through the VDOT State Environmental Review Process, the
National Environmental Policy Act (for federal actions), or the VDOT Geographic
Information System. Compensatory mitigation may be required for all permanent
impacts, regardless of amount. All temporary impacts, regardless of amount,
shall be restored to preexisting conditions, as per Parts I and III of this VWP
general permit regulation.
B. A Joint Permit Application (JPA), a Virginia Department
of Transportation Interagency Coordination Meeting Joint Permit Application
(VDOT IACM JPA), or a VDOT Quarterly Reporting of Impacts Less Than One-Tenth
Acre The Department of Environmental Quality-approved application forms
shall serve as an application under this regulation for a VWP permit
or VWP general permit coverage.
C. The board will determine whether the proposed activity
requires coordination with the [ United States U.S. ]
Fish and Wildlife Service, the Virginia Department of Conservation and
Recreation, the Virginia Department of Agriculture and Consumer Services
[ , ] and the Virginia Department of Game and Inland Fisheries
regarding the presence of federal or state [ proposed or ]
listed threatened and endangered species or [ proposed or ]
designated critical habitat. Based upon consultation with these agencies, the
board may deny application for coverage under this general permit. The
applicant may also consult with these agencies prior to submitting an
application. Species or habitat information that the applicant provides will
assist DEQ the Department of Environmental Quality in reviewing
and processing the application.
9VAC25-680-60. Application.
A. Applications shall be filed with the board as follows:
1. The applicant shall file a complete application in
accordance with 9VAC25-680-50, and this section for a coverage
under this VWP General Permit Number WP3 general permit for
impacts to surface waters from linear transportation projects, which will
serve as a notice of intent for coverage under this VWP general permit
[ activities projects ].
2. The VDOT may use its monthly IACM process for submitting
applications.
B. The required A complete application shall
contain for VWP general permit coverage, at a minimum, consists of
the following information [ , ] if applicable to the project:
1. The applicant's legal name, mailing address, and
telephone number, and, if applicable, electronic mail address
and fax number.
2. If different from the applicant, legal name, mailing
address, telephone number, and if applicable, electronic mail address and fax
number of property owner.
2. The 3. If applicable, authorized agent's (if
applicable) name, mailing address, telephone number, and, if
applicable, fax number and electronic mail address.
3. 4. The existing VWP general permit tracking
number (if applicable), if applicable.
4. The name of the project, narrative description of
project purpose, and a description of the proposed activity in surface waters.
5. The name of the water body or water bodies or receiving
stream, as applicable.
6. The hydrologic unit code (HUC) for the project area.
7. The name of the city or county where the project is
located.
8. Latitude and longitude (to the nearest second) from a
central location within the project limits.
9. A detailed location map (e.g., a United States Geologic
Survey topographic quadrangle map) of the project area, including the project
boundary. The map shall be of sufficient detail such that the site may be
easily located for site inspection.
10. (Reserved.)
11. Project plan view. Plan view sketches shall include, at
a minimum, north arrow, scale, existing structures, existing and proposed
contours (if available), limit of surface water areas, direction of flow,
ordinary high water mark, impact limits, location and dimension of all proposed
structures in impact areas. In addition, cross-sectional or profile sketches
with the above information may be required to detail impact areas.
12. Dredge material management plan (for dredging projects
only) including plan and cross-section view drawings of the disposal or
dewatering area, the dimensions and design of the proposed berm and spillway,
and the capacity of the proposed disposal or dewatering site.
13. Surface water impact information (wetlands, streams, or
open water) for both permanent and temporary impacts, including a description
of the impact, the areal extent of the impact (area of wetland in square feet
and acres; area of stream, length of stream, and average width); the location
(latitude and longitude at the center of the impact, or at the center of each
impact for linear projects)) and the type of surface water impact (open water;
wetlands according to the Cowardin classification or similar terminology; or
perennial and nonperennial for streams). The board encourages applicants to
coordinate the determination of perennial or nonperennial streams with the
appropriate local government agency in Tidewater Virginia.
14. Functional values assessment for impacts to wetlands
greater than one acre, which shall consist of a summary of field observations
of the existing wetland functions and values and an assessment of the impact
that the project will have on these functions and values. The following
parameters and functions shall be directly addressed: surrounding land uses and
cover types; nutrient, sediment, and pollutant trapping; flood control and
flood storage capacity; erosion control and shoreline stabilization;
groundwater recharge and discharge; aquatic and wildlife habitat; and unique or
critical habitats.
15. A description of the specific on-site measures
considered and taken during project design and development both to avoid and
minimize impacts to surface waters to the maximum extent practicable.
16. A conceptual plan for the intended compensation for
unavoidable impacts, including:
a. For wetlands, the conceptual compensation plan shall
include: the goals and objectives in terms of replacement of wetland acreage
and function; a detailed location map (e.g., a United States Geologic Survey
topographic quadrangle map), including latitude and longitude (to the nearest
second) at the center of the site; a description of the surrounding land use; a
hydrologic analysis, including a draft water budget based on expected monthly
inputs and outputs which will project water level elevations for a typical
year, a dry year, and a wet year; groundwater elevation data, if available, or
the proposed location of groundwater monitoring wells to collect these data; a
map for existing surface water areas on the proposed site or sites, including a
wetland delineation confirmation for any existing wetlands; a conceptual
grading plan; a conceptual planting scheme, including suggested plant species
and zonation of each vegetation type proposed; and a description of existing
soils, including general information on topsoil and subsoil conditions,
permeability, and the need for soil amendments.
b. For streams, the conceptual compensation plan shall
include: the goals and objectives in terms of water quality benefits and
replacement of stream functions; a detailed location map (e.g., a United States
Geologic Survey topographic quadrangle map), including the latitude and longitude
to the nearest second; the proposed stream segment restoration locations,
including plan view and cross-section sketches; the stream deficiencies that
need to be addressed; the proposed restoration measures to be employed,
including channel measurements, proposed design flows and types of instream
structures; and reference stream data, if available.
c. Applicants proposing to compensate off-site, including
purchase or use of mitigation bank credits, or contribution to an in-lieu fee
fund, shall submit an evaluation of the feasibility of on-site compensation. If
on-site compensation is practicable, applicants shall provide documentation as
to why the proposed off-site compensation is ecologically preferable. The
evaluation shall include, but not be limited to, the following assessment
criteria: water quality benefits, hydrologic source, hydrologic regime,
watershed, surface water functions and values, vegetation type, soils, impact
acreage, distance from impacts, timing of compensation versus impacts,
acquisition, constructability, and cost.
d. Applicants proposing compensation involving
contributions to an in-lieu fee fund shall state such as the conceptual
compensation plan. Written documentation of the willingness of the entity to
accept the donation and documentation of how the amount of the contribution was
calculated shall be submitted prior to issuance of this general permit
authorization.
e. Applicants proposing compensation involving the purchase
or use of mitigation banking credits shall include as their conceptual
compensation plan:
(1) The name of the proposed mitigation bank and the HUC in
which it is located;
(2) The number of credits proposed to be purchased or used;
and
(3) Certification from the bank owner of the availability
of credits.
17. A delineation map must be provided of the geographic
area of a delineated wetland for all wetlands on the site, in accordance with
9VAC25-210-45, including the wetlands data sheets. The delineation map shall
also include the location of streams, open water, and the approximate limits of
Chesapeake Bay Resource Protection Areas (RPAs), as other state or local
requirements may apply if the project is located within an RPA. Wetland types
shall be noted according to their Cowardin classification or similar
terminology. A copy of the USACE delineation confirmation, or other
correspondence from the USACE indicating their approval of the wetland
boundary, shall be provided at the time of application, or if not available at
that time, as soon as it becomes available during the VWP permit review.
18. A copy of the FEMA flood insurance rate map or
FEMA-approved local floodplain map for the project site.
19. The appropriate application processing fee for a VWP
permit in accordance with 9VAC25-20-10 et seq. The permit application fee for
VWP permit authorizations is based on acres only. Therefore, impacts that
include linear feet of stream bed must be converted to an acreage in order to
calculate the permit application fee.
20. A written disclosure identifying all wetlands, open
water, streams, and associated upland buffers within the proposed project or
compensation areas that are under a deed restriction, conservation easement,
restrictive covenant, or other land use protective instrument (protected areas).
Such disclosure shall include the nature of the prohibited activities within
the protected areas.
21. The following certification:
"I certify under penalty of law that this document and
all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system or those persons directly responsible for
gathering the information, the information submitted is to the best of my
knowledge and belief true, accurate, and complete. I am aware that there are
significant penalties for submitting false information including the
possibility of fine and imprisonment for knowing violations."
C. The application shall be signed in accordance with
9VAC25-210-100. If an agent is acting on behalf of an applicant, the applicant
shall submit an authorization of the agent that includes the signatures of both
the applicant and the agent.
5. Project name and proposed project schedule.
6. The following information for the project site location,
and any related permittee-responsible compensatory mitigation site [ ,
if applicable ]:
a. The physical street address, nearest street, or nearest
route number; city or county; zip code; and [ , ] if
applicable, parcel number of the site or sites.
b. Name of the impacted water body or water bodies, or
receiving waters, as applicable, at the site or sites.
c. The latitude and longitude to the nearest second at the
center of the site or sites.
d. The fourth order subbasin, as defined by the hydrologic
unit boundaries of the National Watershed Boundary Dataset, for the site or
sites.
e. A detailed map depicting the location of the site or
sites, including the project boundary [ and all existing
preservation areas on the site or sites ]. The map (e.g., a
[ United States U.S. ] Geologic Survey
topographic quadrangle map) should be of sufficient detail to easily locate the
site or sites for inspection.
[ f. GIS-compatible shapefile or shapefiles of the
project boundary and all existing preservation areas on the site or sites,
unless otherwise approved by or coordinated with DEQ. The requirement for a
GIS-compatible shapefile or shapefiles may be waived by DEQ on a case-by-case
basis. ]
7. A narrative description of the project, including
project purpose and need.
8. Plan-view drawing or drawings of the project site
sufficient to assess the project, including at a minimum the following:
a. North arrow, graphic scale, and existing and proposed
topographic or bathymetric contours.
b. Limits of proposed impacts to surface waters.
c. Location of all existing and proposed structures.
d. All delineated wetlands and all jurisdictional surface
waters on the site, including the Cowardin classification (i.e., emergent,
scrub-shrub, or forested) for those surface waters and waterway name, if
designated; ebb and flood or direction of flow; and ordinary high water mark in
nontidal areas.
e. The limits of Chesapeake Bay Resource Protection Areas
(RPAs) as field-verified by the applicant [ , ] and if
available, the limits as approved by the locality in which the project site is
located [ , ] unless the proposed use is exempt from
the Chesapeake Bay Preservation Area Designation and Management Regulations
(9VAC25-830).
f. The limits of any areas that are under a deed
restriction, conservation easement, restrictive covenant, or other land use
protective instrument (i.e., protected areas).
9. Cross-sectional and profile drawing or drawings.
Cross-sectional drawing or drawings of each proposed impact area shall include
at a minimum a graphic scale, existing structures, existing and proposed
elevations, limits of surface water areas, ebb and flood or direction of flow
(if applicable), ordinary high water mark in nontidal areas, impact limits, and
location of all existing and proposed structures. Profile drawing or drawings
with this information may be required on a case-by-case basis to demonstrate
minimization of impacts. Any application that proposes piping or culverting
stream flows shall provide a longitudinal profile of the pipe or culvert
position and stream bed thalweg, or shall provide spot elevations of the stream
thalweg at the beginning and end of the pipe or culvert, extending to a minimum
of 10 feet beyond the limits of proposed impact.
10. Materials assessment. Upon request by the board, the
applicant shall provide evidence or certification that the material is free
from toxic contaminants prior to disposal or that the dredging activity will
not cause or contribute to a violation of water quality standards during
dredging. The applicant may be required to conduct grain size and composition
analyses, tests for specific parameters or chemical constituents, or elutriate
tests on the dredge material.
11. A narrative description of all impacts proposed to
surface waters, including the type of activity to be conducted in surface
waters and any physical alteration to surface waters. Surface water impacts
shall be identified as follows:
a. Wetland impacts identified according to their Cowardin
classification (i.e., emergent, scrub-shrub, or forested) [ ,; ]
and for each classification, the individual impacts quantified in square
feet to the nearest whole number, cumulatively summed in square feet, and then
the sum converted to acres and rounded to two decimal places using commonly
accepted arithmetic principles of rounding.
b. Individual stream impacts [ (i) ] quantified
[ by length ] in linear feet to the nearest whole number
and [ then cumulatively summed, by average width in
feet to the nearest whole number; (ii) quantified in square feet to the nearest
whole number; ] and [ (iii) ] when
compensatory mitigation is required, the impacts identified according to the
assessed type using the Unified Stream Methodology.
c. Open water impacts identified according to their
Cowardin classification; and for each type, the individual impacts quantified
in square feet to the nearest whole number, cumulatively summed in square feet,
and then the sum converted to acres and rounded to two decimal places using
commonly accepted arithmetic principles of rounding.
d. A copy of the approved jurisdictional determination
[ , if when ] available, or [ when
unavailable, (i) ] the preliminary jurisdictional determination
from the U.S. Army Corps of Engineers (USACE), U.S. Department of Agriculture
Natural Resources Conservation Service (NRCS), or DEQ [ , ]
or [ (ii) ] other correspondence from the USACE,
NRCS, or DEQ indicating approval of the boundary of applicable jurisdictional
surface waters, including wetlands data sheets if applicable.
e. A delineation map [ and GIS-compatible
shapefile or shapefiles of the delineation map ] that
[ (i) ] depicts the geographic area or areas of all surface
water boundaries delineated in accordance with 9VAC25-210-45 and confirmed in
accordance with the jurisdictional determination process; [ (ii) ]
identifies such areas in accordance with subdivisions 11 a [ through,
11 b, and ] 11 c of this subsection; and [ (iii) ]
quantifies and identifies any other surface waters according to their
Cowardin classification (i.e., emergent, scrub-shrub, or forested) or similar
terminology [ , if applicable ]. [ The
requirements for a delineation map or GIS-compatible shapefile or shapefiles
may be waived by DEQ on a case-by-case basis. ]
12. An alternatives analysis for the proposed project
detailing the specific on-site measures taken during project design and
development to first avoid and then minimize impacts to surface waters to the
maximum extent practicable in accordance with the Guidelines for Specification
of Disposal Sites for Dredged or Fill Material, 40 CFR Part 230. Avoidance and
minimization includes, but is not limited to, the specific on-site measures
taken to reduce the size, scope, configuration, or density of the proposed
project, including review of alternative sites where required for the project,
which would avoid or result in less adverse impact to surface waters, and
documentation demonstrating the reason the applicant determined less damaging
alternatives are not practicable. The analysis shall demonstrate to the
satisfaction of the board that avoidance and minimization opportunities have
been identified and measures have been applied to the proposed activity such
that the proposed activity in terms of impacts to state waters and fish and
wildlife resources is the least environmentally damaging practicable
alternative.
13. A compensatory mitigation plan to achieve no net loss
of wetland acreage [ or and ] functions
or stream functions and water quality benefits.
a. If permittee-responsible compensation is proposed for
wetland impacts, a conceptual wetland compensatory mitigation plan must be
submitted in order for an application to be deemed complete and shall include
at a minimum (i) the goals and objectives in terms of replacement of wetland
acreage [ or and ] functions; (ii) a
detailed location map including latitude and longitude [ (to
to ] the nearest [ second) second ]
and the fourth order subbasin, as defined by the hydrologic unit boundaries
of the National Watershed Boundary Dataset, at the center of the site; (iii) a
description of the surrounding land use; (iv) a hydrologic analysis including a
draft water budget for nontidal areas based on expected monthly inputs and outputs
that will project water level elevations for a typical year, a dry year, and a
wet year; (v) groundwater elevation data, if available, or the proposed
location of groundwater monitoring wells to collect these data; (vi) wetland
delineation confirmation, data sheets, and maps for existing surface water
areas on the proposed site or sites; (vii) a conceptual grading plan; (viii) a
conceptual planting scheme including suggested plant species and zonation of
each vegetation type proposed; (ix) a description of existing soils including
general information on both topsoil and subsoil conditions, permeability, and
the need for soil amendments; (x) a draft design of any water control
structures; (xi) inclusion of buffer areas; (xii) a description of any structures
and features necessary for the success of the site; (xiii) the schedule for
compensatory mitigation site construction; and (xiv) measures for the control
of undesirable species.
b. If permittee-responsible compensation is proposed for
stream impacts, a conceptual stream compensatory mitigation plan must be
submitted in order for an application to be deemed complete and shall include
at a minimum (i) the goals and objectives in terms of water quality benefits
and replacement of stream functions; (ii) a detailed location map including the
latitude and longitude to the nearest second and the fourth order subbasin, as
defined by the hydrologic unit boundaries of the National Watershed Boundary
Dataset, at the center of the site; (iii) a description of the surrounding land
use; (iv) the proposed stream segment restoration locations including plan view
and cross-sectional drawings; (v) the stream deficiencies that need to be
addressed; (vi) data obtained from a DEQ-approved, stream impact assessment
methodology such as the Unified Stream Methodology; (vii) the proposed
restoration measures to be employed including channel measurements, proposed
design flows, types of instream structures, and conceptual planting scheme;
(viii) reference stream data, if available; (ix) inclusion of buffer areas; (x)
schedule for restoration activities; and (xi) measures for the control of
undesirable species.
c. For any permittee-responsible compensatory mitigation,
the conceptual compensatory mitigation plan shall also include a draft of the
intended protective mechanism or mechanisms, in accordance with 9VAC25-210-116
B 2, such as, but not limited to, a conservation easement held by a third party
in accordance with the Virginia Conservation Easement Act (§ 10.1-1009 et seq.
of the Code of Virginia) or the Virginia Open-Space Land Act (§ 10.1-1700 et
seq. of the Code of Virginia), a duly recorded declaration of restrictive
covenants, or other protective instrument. The draft intended protective
mechanism shall contain the information in subdivisions c (1), c (2), and c (3)
of this subdivision 13 or in lieu thereof shall describe the intended
protective mechanism or mechanisms that contains the information required
below:
(1) A provision for access to the site;
(2) The following minimum restrictions: no ditching, land
clearing, or discharge of dredge or fill material, and no activity in the area
designated as compensatory mitigation area with the exception of maintenance;
corrective action measures; or DEQ-approved activities described in the
approved final compensatory mitigation plan or long-term management plan; and
(3) A long-term management plan that identifies a long-term
steward and adequate financial assurances for long-term management in
accordance with the current standard for mitigation banks and in-lieu fee
program sites, except that financial assurances will not be necessary for
permittee-responsible compensation provided by government agencies on
government property. If approved by DEQ, permittee-responsible compensation on
government property and long-term protection may be provided through federal
facility management plans, integrated natural resources management plans, or
other alternate management plans submitted by a government agency or public
authority.
d. Any compensatory mitigation plan proposing the purchase
of mitigation bank or in-lieu fee program credits shall include the number and
type of credits proposed to be purchased and documentation from the approved
mitigation bank or in-lieu fee program sponsor of the availability of credits
at the time of application.
14. Permit application fee. The applicant will be notified
by the board as to the appropriate fee for the project [ in
accordance with 9VAC25-20 ].
15. A written description and a graphical depiction
identifying all upland areas including buffers, wetlands, open water, other
surface waters, and compensatory mitigation areas located within the proposed
project boundary or permittee-responsible compensatory mitigation areas that
are under a deed restriction, conservation easement, restrictive covenant, or
other land use protective instrument (i.e., protected areas). Such description
and a graphical depiction shall include the nature of the prohibited activities
within the protected areas and the limits of Chesapeake Bay Resource Protection
Areas (RPAs) as field-verified by the applicant [ , ] and
if available, the limits as approved by the locality in which the project site
is located, unless the proposed use is exempt from the Chesapeake Bay
Preservation Area Designation and Management Regulations (9VAC25-830), as
additional state or local requirements may apply if the project is located
within an RPA.
16. Signature page that has been signed, dated, and
certified by the applicant in accordance with 9VAC25-210-100. If the applicant
is a business or other organization, the signature must be made by an
individual with the authority to bind the business or organization, and the
title of the signatory must be provided. The application signature page, either
on the copy submitted to the Virginia Marine Resources Commission or to DEQ,
must have an original signature. Electronic submittals containing the original
signature page, such as that contained in a scanned document file, are
acceptable.
C. An analysis of the functions of wetlands proposed to be
impacted may be required by DEQ. When required, the method selected for the
analysis shall assess water quality or habitat metrics and shall be coordinated
with DEQ in advance of conducting the analysis.
1. No analysis shall be required when:
a. Wetland impacts per each single and complete project
total 1.00 acre or less; or
b. The proposed compensatory mitigation consists of
purchasing mitigation bank or in-lieu fee program credits at standard
mitigation ratios of 2:1 for forest, 1.5:1 for scrub-shrub, and 1:1 for
emergent, or higher.
2. Analysis shall be required when wetland impacts per each
single and complete project total 1.01 acres or more and when any of the
following applies:
a. The proposed compensatory mitigation consists of
permittee-responsible compensation, including water quality enhancements as
replacement for wetlands; or
b. The proposed compensatory mitigation consists of
purchasing mitigation bank or in-lieu fee program credits at less than the standard
mitigation ratios of 2:1 for forest, 1.5:1 for scrub-shrub, and 1:1 for
emergent.
D. Upon receipt of an application from the Department of
Transportation for a road or highway construction project by the appropriate
DEQ office, the board has 10 business days, pursuant to § 33.2-258 of
the Code of Virginia, to review the application and either determine the
information requested in subsection B of this section is complete or inform the
Department of Transportation that additional information is required to make
the application complete (pursuant to § 33.1-19.1 of the Code of Virginia).
Upon receipt of an application from other applicants for any type of project,
the board has 15 days to review the application and either determine the
information requested in subsection B of this section is complete or inform the
applicant that additional information is required to make the application
complete. For Department of Transportation road or highway construction
projects, Pursuant to § 33.2-258 of the Code of Virginia,
[ application for ] coverage under this VWP general
permit for Department of Transportation road or highway construction
projects shall be approved, or approved with conditions, or the
application shall be denied [ , ] within 30 business days
of receipt of a complete application (pursuant to § 33.1-19.1 of the Code of
Virginia). For all other projects, [ application for ]
coverage under this VWP general permit shall be approved, or
approved with conditions, or the application shall be denied [ , ]
within 45 days of receipt of a complete application. If the board fails to act
within the applicable 30 or 45 days on a complete application, coverage under
this VWP general permit shall be deemed approved granted.
1. In evaluating the application, the board shall make an
assessment of the impacts associated with the project in combination with other
existing or proposed impacts. Coverage Application for coverage
under this VWP general permit shall be denied if the cumulative impacts will
cause or contribute to a significant impairment of state waters or fish and
wildlife resources.
2. The board may place additional conditions requirements
on a project in order to approve authorization grant coverage
under this VWP general permit. However, these conditions the
requirements must be consistent with [ the VWP general
permit regulation this chapter ].
E. Incomplete application. Where an application is incomplete
not accepted as complete by the board within the applicable 10 or 15 days of
receipt, the board shall require the submission of additional information from
the applicant and may suspend processing the of any
application until such time as the applicant has supplied the requested
information and the application is complete. Where the applicant becomes aware
that he omitted one or more relevant facts from an application, or submitted
incorrect information in an application or in reports any report
to the board, he the applicant shall immediately submit such
facts or the correct information. A revised application with new information
shall be deemed a new application, for the purposes of review but
shall not require an additional permit application fee. An incomplete permit
application may be administratively withdrawn from processing by the board for
failure to provide the required information after 180 60 days
from the date that of the original permit application was
received latest written information request made by the board. An
applicant may request a suspension of application review by the board, but requesting
a suspension shall not preclude the board from administratively withdrawing an
incomplete application. Resubmittal of a permit application for the same or
similar project, after such time that the original permit application was
administratively withdrawn, shall require submittal of an additional permit
application fee.
9VAC25-680-70. Compensation.
A. In accordance with 9VAC25-680-50 A, compensatory Compensatory
mitigation may be required for all permanent, nontidal surface water
impacts as specified in 9VAC25-680-50 A. All temporary, nontidal surface
water impacts shall be restored to preexisting conditions in accordance with
9VAC25-680-100.
B. Generally, the sequence of preferred compensation
options shall be restoration, then creation, then mitigation banking, and then
in-lieu fee fund. Also, on-site, in-kind compensatory mitigation, when
available, shall be deemed the most ecologically preferable form of
compensation for project impacts, in most cases. However, off-site or
out-of-kind compensation opportunities that prove to be more ecologically
preferable to practicable on-site or in-kind compensation may be considered.
When the applicant can demonstrate satisfactorily that an off-site or
out-of-kind compensatory mitigation proposal is ecologically preferable, then
such proposal may be deemed appropriate for compensation of project impacts.
Compensatory mitigation and any compensatory mitigation proposals shall be
in accordance with this section and 9VAC25-210-116.
C. For the purposes of this VWP general permit,
compensatory mitigation for unavoidable wetland impacts may be met through the
following:
1. Wetland creation.
2. Wetland restoration.
3. The purchase or use of credits from a mitigation bank,
pursuant to § 62.1-44.15:23 of the Code of Virginia.
4. A contribution to an approved in-lieu fee fund.
5. Preservation of upland buffers adjacent to state waters,
when utilized in conjunction with subdivision 1, 2, or 3 of this subsection and
when consistent with 9VAC25-210-116 A.
6. Restoration of upland buffers adjacent to state waters,
when utilized in conjunction with subdivision 1, 2, or 3 of this subsection and
when consistent with 9VAC25-210-116 A.
7. Preservation of wetlands, when utilized in conjunction
with subdivision 1, 2, or 3 of this subsection.
D. For the purposes of this VWP general permit,
compensatory mitigation for unavoidable stream impacts may be met through the
following:
1. Stream channel restoration or enhancement.
2. Riparian buffer restoration or enhancement.
3. Riparian buffer preservation, when consistent with
9VAC25-210-116 A.
4. A contribution to an approved in-lieu fee fund.
5. The purchase or use of credits from a mitigation bank,
pursuant to § 62.1-44.15:23 of the Code of Virginia.
E. In order for contribution to an in-lieu fee fund to be
an acceptable form of compensation, the fund must be approved for use by the
board according to the provisions of 9VAC25-210-116 D. The applicant shall
provide proof of contribution to DEQ prior to commencing activities in impact
areas.
F. In order for purchase or use of bank credits to be an
acceptable form of compensation, the bank shall be operating in accordance with
the provisions of § 62.1-44.15:23 of the Code of Virginia and 9VAC25-210-116 E.
The applicant shall provide proof of purchase, use, or debit to DEQ prior to
commencing activities in impact areas.
G. Compensation C. When required, compensatory
mitigation for unavoidable, permanent wetland impacts shall be provided at
the following minimum compensation to impact mitigation ratios:
1. Impacts to forested wetlands shall be mitigated at 2:1, as
calculated on an area basis.
2. Impacts to [ scrub shrub scrub-shrub ]
wetlands shall be mitigated at 1.5:1, as calculated on an area basis.
3. Impacts to emergent wetlands shall be mitigated at 1:1, as
calculated on an area basis.
H. Compensation D. When required, compensatory
mitigation for stream bed impacts shall be appropriate to replace lost
functions and water quality benefits. One factor in determining the required
stream compensation shall be an analysis of stream impacts utilizing a stream
impact assessment methodology acceptable to DEQ the Department of
Environmental Quality.
I. E. Compensation for permanent open water
impacts, other than to streams, may be required at a an
in-kind or out-of-kind mitigation ratio of 1:1 replacement to impact
ratio or less, as calculated on an area basis, to offset impacts to
state waters and fish and wildlife resources from significant impairment.
Compensation shall not be required for permanent or temporary impacts to
open waters identified as palustrine by the Cowardin classification method,
[ except but compensation may be required ] when
such open waters are located in areas of karst topography in Virginia and are formed
by the natural solution of limestone.
J. Compensation F. When conversion results in a
permanent alteration of the functions of a wetland, compensatory mitigation
for conversion impacts to wetlands shall be required at a 1:1 replacement to
impact mitigation ratio, as calculated on an area basis, when
such conversion results in a permanent alteration of the functions and values
of the wetlands. For example, the permanent conversion of a forested
wetland to an emergent wetland is considered to be a permanent impact for the
purposes of this [ regulation chapter ]. Compensation
for conversion of other types of surface waters may be required, as
appropriate, to offset impacts to state waters and fish and wildlife resources from
significant impairment.
9VAC25-680-80. Notice of planned changes; modifications to
coverage.
A. The permittee shall notify the board in advance of the
a planned change, and the planned change an application or
request will for modification to coverage shall be reviewed
according to all provisions of this regulation chapter. Coverage
shall not be modified if (i) the cumulative total of permanent and temporary
impacts [ for a single and complete project ] exceeds
two acres of nontidal wetlands or open water or exceeds 1,500 linear feet of
nontidal stream bed or (ii) the criteria in subsection B of this section are
not met. The applicant may submit a new permit application for consideration
under a VWP individual permit.
B. Authorization under this VWP general permit coverage
may be modified subsequent to issuance if the permittee determines that
additional permanent wetland, open water, or stream under the following
circumstances:
1. Additional impacts to surface waters are
necessary, provided that the additional impacts are associated with the
previously authorized activities in authorized locations within the same phase
of development or within logical termini, the cumulative increase in acreage of
wetland or open water impacts is not greater than 1/4 acre, the cumulative
increase in stream bed impacts is not greater than 100 linear feet, and the
additional impacts are fully mitigated. Prior to a planned change approval, DEQ
may require submission of a compensatory mitigation plan for the additional
impacts. In cases where the original impacts totaled less than 1/10 acre of
wetlands or open water, or less than 300 linear feet of stream bed, and the
additional impacts result in these limits being exceeded, the notice of planned
change will not be approved. However, the applicant may submit a new permit
application and permit application fee for the total impacts to be considered
under this VWP general permit, another VWP general permit, or a VWP individual
permit.:
a. The additional impacts are proposed prior to impacting
the additional areas.
b. The proposed additional impacts are located within the
project boundary as depicted in the application for coverage or are located in
areas of directly-related off-site work [ , ] unless
otherwise prohibited in this [ VWP general permit regulation
chapter ].
c. The permittee has provided sufficient documentation that
the board may reasonably determine that the additional impacts will not impact
federal or state listed [ or proposed ] threatened
or endangered species or [ proposed or ] designated
critical habitat [ , ] or [ be the
result in a ] taking of threatened or endangered species.
[ The board recommends that the permittee verify that the project will
not impact any proposed threatened or endangered species or proposed critical
habitat. ]
d. The cumulative, additional permanent wetland or open
water impacts for one or more notices of planned change do not exceed 0.25
acre.
e. The cumulative, additional permanent stream impacts for
one or more notices of planned change do not exceed 100 linear feet.
f. Documentation is provided demonstrating that the
proposed surface water impacts have been avoided to the maximum extent
practicable in accordance with the informational requirements of 9VAC25-680-60
B 12.
g. Compensatory mitigation for the proposed impacts, if
required, meets the requirements of 9VAC25-680-70 and 9VAC25-210-116. Prior to
a planned change approval, the Department of Environmental Quality may require
submission of a compensatory mitigation plan for the additional impacts.
h. Where such additional impacts are temporary, and prior
to initiating the impacts, the permittee provides a written statement to the
board that the area to be temporarily impacted will be restored to its
preconstruction elevations and contours [ , ] with
topsoil from the impact area where practicable, such that the previous acreage
and functions are restored [ , ] in accordance
with Parts I A 3 and B 11 of 9VAC25-680-100. The additional temporary impacts
shall not cause the cumulative total impacts to exceed the general permit
threshold for use. The proposed temporary impacts shall be deemed approved if
DEQ does not respond within 10 days of receipt of the request for authorization
to temporarily impact additional surface waters.
i. The additional proposed impacts do not change the
category of the project, based on the original impact amounts as specified in
9VAC25-680-50 A 2. However, the applicant may submit a new permit application
for the total impacts to be considered under this VWP general permit, another
VWP general permit, or a VWP individual permit.
C. Authorization under this VWP general permit may be
modified after issuance if the project results in less 2. A reduction in
wetland or stream impacts. Compensation Compensatory mitigation
requirements may be modified in relation to the adjusted impacts at the
request of the permittee, provided that the adjusted compensation compensatory
mitigation meets the initial authorization compensation compensatory
mitigation goals. DEQ shall not be responsible for ensuring refunds for
mitigation bank credit purchases, mitigation bank usage, or in-lieu fee fund
contributions program credit purchases.
D. Authorization under this VWP general permit may be
modified after issuance for a 3. A change in project plans or use
that does not result in a change in to authorized project impacts
other than those allowed in subdivisions 1 and 2 of this subsection.
E. Authorization under the VWP general permit may be
modified for a change to the mitigation bank at which credits are purchased or
used, provided that the same amount of credits are purchased or used and all
criteria for use in 9VAC25-210-116 E are met.
F. Authorization under the VWP general permit may be
modified after issuance for typographical errors.
G. A Notice of Planned Change is not required after
authorization issuance for additional temporary impacts to surface waters,
provided that DEQ is notified in writing regarding additional temporary
impacts, and the area is restored to preexisting conditions in accordance with
Part I C 11 of this general permit. In no case can the additional temporary
impacts exceed the general permit threshold for use.
H. In no case can this authorization be modified to exceed
the general permit threshold for use.
I. A notice of planned change shall be denied if fish and
wildlife resources are significantly impacted or if the criteria in subsection
B of this section are not met. However, the original VWP general permit
authorization shall remain in effect. The applicant may submit a new permit
application and permit application fee for consideration under a VWP individual
permit.
4. Substitute a specific, DEQ-approved mitigation bank or
in-lieu fee program with another DEQ-approved mitigation bank or in-lieu fee
program or substitute all or a portion of the prior authorized
permittee-responsible compensation with a purchase of mitigation credits in
accordance with 9VAC25-210-116 C from a DEQ-approved mitigation bank or in-lieu
fee program. The amount of credits proposed to be purchased shall be sufficient
to meet the compensatory mitigation requirement for which the compensatory
mitigation is proposed to replace.
5. Correct typographical errors.
9VAC25-680-90. Termination of authorization by consent coverage.
When all permitted activities requiring notification under
9VAC25-680-50 A and all compensatory mitigation requirements have been
completed, or if the authorized impacts will not occur, the A. The
permittee shall submit a request for termination by consent within 30 days of project
completion or project cancellation completing or canceling all
authorized activities requiring notification under 9VAC25-680-50 A and all
compensatory mitigation requirements. When submitted for project
completion, the request for termination by consent shall constitute a
notice of project completion in accordance with 9VAC25-210-130 F.
The director may accept this termination of authorization coverage
on behalf of the board. The permittee shall submit the following information:
1. Name, mailing address, and telephone number of the
permittee;
2. Name and location of the activity;
3. The VWP general permit authorization tracking
number; and
4. One of the following certifications:
a. For project completion:
"I certify under penalty of law that all activities and
any required compensatory mitigation authorized by a the VWP
general permit and general permit coverage have been completed. I
understand that by submitting this notice of termination I am no longer authorized
to perform activities in surface waters in accordance with the VWP general
permit and general permit coverage, and that performing activities in
surface waters is unlawful where the activity is not authorized by a the
VWP permit or coverage, unless otherwise excluded from obtaining coverage.
I also understand that the submittal of this notice does not release me from
liability for any violations of this the VWP general permit authorization
or coverage."
b. For project cancellation:
"I certify under penalty of law that the activities and
any required compensatory mitigation authorized by this the VWP
general permit and general permit coverage will not occur. I understand
that by submitting this notice of termination I am no longer authorized to perform
activities in surface waters in accordance with the VWP general permit and
general permit coverage, and that performing activities in surface waters
is unlawful where the activity is not authorized by a the VWP
permit or for coverage, unless otherwise excluded from obtaining coverage.
I also understand that the submittal of this notice does not release me from
liability for any violations of this the VWP general permit authorization
or coverage, nor does it allow me to resume the permitted authorized
activities without reapplication and reauthorization coverage."
c. For events beyond permittee control, the permittee shall
provide a detailed explanation of the events, to be approved by DEQ the
Department of Environmental Quality, and the following certification
statement:
"I certify under penalty of law that the activities or
the required compensatory mitigation authorized by a the VWP
general permit and general permit coverage have changed as the result of
events beyond my control (see attached). I understand that by submitting this
notice of termination I am no longer authorized to perform activities in
surface waters in accordance with the VWP general permit and general permit
coverage, and that performing activities in surface waters is unlawful where
the activity is not authorized by a the VWP permit or
coverage, unless otherwise excluded from obtaining coverage. I also
understand that the submittal of this notice does not release me from liability
for any violations of this the VWP general permit authorization
or coverage, nor does it allow me to resume the permitted authorized
activities without reapplication and reauthorization coverage."
B. VWP general permit coverage may be terminated for cause
in accordance with 9VAC25-210-180 F and [ 9VAC25-230
§ 62.1-44.15:02 of the Code of Virginia ], or without cause in
accordance with 9VAC25-210-180 G and [ 9VAC25-230 §
62.1-44.15:02 ].
9VAC25-680-95. Transition. (Repealed.)
A. All applications received on or after August 1, 2006,
will be processed in accordance with these new procedures.
B. VWP general permit authorizations issued prior to
August 1, 2006, will remain in full force and effect until such authorizations
expire, are revoked, or are terminated.
C. Notices of planned change and all other types of
notification that are received by the board prior to August 1, 2006, will be
processed in accordance with the VWP general permit regulation in effect at
that time. Notices of planned change and all other types of notification to the
board that are received on or after August 1, 2006, will be processed in
accordance with these new procedures.
9VAC25-680-100. VWP general permit.
Any applicant whose application has been accepted by the
board shall be subject to the following requirements:
VWP General Permit No. WP3
Authorization Expiration date:
Authorization Notes(s):
VWP GENERAL PERMIT FOR LINEAR TRANSPORTATION PROJECTS UNDER
THE VIRGINIA WATER PROTECTION PERMIT AND THE VIRGINIA STATE WATER CONTROL LAW
Based upon an examination of the information submitted by
the applicant and in
VWP GENERAL PERMIT NO. WP3 FOR LINEAR TRANSPORTATION
PROJECTS UNDER THE VIRGINIA WATER PROTECTION PERMIT AND THE VIRGINIA STATE
WATER CONTROL LAW
Effective date: August 2, 2016
Expiration date: August 1, [ 2031 2026 ]
In compliance with § 401 of the Clean Water Act,
as amended (33 USC § 1341) and the State Water Control Law and regulations
adopted pursuant thereto, the board has determined that there is a reasonable
assurance that the activity authorized by this VWP general permit, if conducted
in accordance with the conditions set forth herein complied with,
will protect instream beneficial uses and, will not violate
applicable water quality standards. The board finds that the effect of the
impact, together with other existing or proposed impacts to wetlands, and
will not cause or contribute to a significant impairment of state waters or
fish and wildlife resources. In issuing this VWP general permit, the board
has not taken into consideration the structural stability of any proposed
activities.
Subject The permanent or temporary impact of up to
two acres of nontidal wetlands or open water and up to 1,500 linear feet of
nontidal stream bed shall be subject to the provisions of the VWP
general permit set forth herein; any requirements in coverage granted under
this VWP general permit; the Clean Water Act, as amended,;
and pursuant to the State Water Control Law and regulations adopted
pursuant to it, the permittee is authorized to permanently or temporarily
impact up to two acres of nontidal wetlands or open water and up to 1,500
linear feet of nontidal stream bed.
Permittee:
Address:
Activity Location:
Activity Description:
The authorized activity shall be in accordance with this
cover page, Part I-Special Conditions, Part II-Compensation, Monitoring, and
Reporting, and Part III-Conditions Applicable to All VWP Permits, as set forth
herein.
_________________________________
Director, Department of Environmental Quality
|
___________
Date
|
Part I. Special Conditions.
A. Authorized activities.
1. This permit authorizes The activities authorized
by this chapter shall not cause more than the permanent or temporary
impacts of up to two acres of nontidal wetlands or open water and up to 1,500
linear feet of nontidal stream bed according to the information provided in
the approved and complete application. [ Additional permit
requirements as stipulated by the board in the coverage letter, if any, shall
be enforceable conditions of this permit. ]
2. Any changes to the authorized permanent impacts to surface
waters associated with this project shall require either a notice
of planned change in accordance with 9VAC25-680-80. An application or
request for modification to coverage or another VWP permit application may
be required.
3. Any changes to the authorized temporary impacts to surface
waters associated with this project shall require written notification
to DEQ and approval from the Department of Environmental Quality in
accordance with 9VAC25-680-80 prior to initiating the impacts and
restoration to preexisting conditions in accordance with the conditions of this
permit authorization.
4. Modification to compensation requirements may be approved
at the request of the permittee when a decrease in the amount of authorized
surface waters impacts occurs, provided that the adjusted compensation meets
the initial authorization compensation goals.
5. The activities authorized for coverage under this VWP
general permit must commence and be completed within seven years of the date of
this authorization.
B. Continuation of Coverage. Reapplication for
continuation of coverage under this VWP general permit or a new VWP permit may
be necessary if any portion of the authorized activities or any VWP permit
requirement (including compensation) has not been completed within seven years
of the date of authorization. Notwithstanding any other provision, a request
for continuation of coverage under a VWP general permit in order to complete
monitoring requirements shall not be considered a new application and no
application fee will be charged. The request for continuation of coverage must
be made no less than 60 days prior to the expiration date of this VWP general
permit authorization, at which time the board will determine if continuation of
the VWP general permit authorization is necessary.
C. B. Overall project conditions.
1. The activities authorized by this VWP general permit shall
be executed in a manner so as to minimize adverse impacts on instream
beneficial uses as defined in § 62.1-10 (b) of the Code of Virginia.
2. No activity may substantially disrupt the movement of aquatic
life indigenous to the water body, including those species which normally
migrate through the area, unless the primary purpose of the activity is to
impound water. Culverts Pipes and culverts placed in streams must
be installed to maintain low flow conditions. and shall be
countersunk at both inlet and outlet ends of the pipe or culvert [ , ]
unless specifically approved by the Department of Environmental Quality on a
case-by-case basis and as follows: The requirement to countersink does not
apply to extensions or maintenance of existing [ pipes and ] culverts
that are not countersunk, floodplan floodplain pipe and culverts
being placed above ordinary high water, pipes and culverts being placed
on bedrock, or pipes or culverts required to be placed on slopes 5.0% or
greater. No activity may cause more than minimal adverse effect on
navigation. Furthermore the activity must not impede the passage of normal or
expected high flows and the structure or discharge must withstand expected high
flows. Bedrock encountered during construction must be identified and
approved in advance of a design change where the countersunk condition cannot
be met. Pipes and culverts 24 inches or less in diameter shall be countersunk
three inches below the natural stream bed elevations, and pipes and culverts
greater than 24 inches shall be countersunk at least six inches below the
natural stream bed elevations. Hydraulic capacity shall be determined based on
the reduced capacity due to the countersunk position. In all stream crossings
appropriate measures shall be implemented to minimize any disruption of aquatic
life movement.
3. Wet or uncured concrete shall be prohibited from entry into
flowing surface waters, unless the area is contained within a cofferdam and
the work is performed in the dry or unless otherwise approved by DEQ
the Department of Environmental Quality. Excess or waste concrete shall
not be disposed of in flowing surface waters or washed into flowing surface
waters.
4. All fill material shall be clean and free of contaminants
in toxic concentrations or amounts in accordance with all applicable laws and
regulations.
5. Erosion and sedimentation controls shall be designed in
accordance with the Virginia Erosion and Sediment Control Handbook, Third
Edition, 1992. These controls shall be placed prior to clearing and grading and
maintained in good working order to minimize impacts to state waters. These
controls shall remain in place until the area is stabilized and shall then be
removed.
6. Exposed slopes and streambanks shall be stabilized
immediately upon completion of work in each permitted impact area. All denuded
areas shall be properly stabilized in accordance with the Virginia Erosion and
Sediment Control Handbook, Third Edition, 1992.
7. All construction, construction access (e.g., cofferdams,
sheetpiling, and causeways) and demolition activities associated with this
the project shall be accomplished in a manner that minimizes
construction or waste materials from entering surface waters to the maximum
extent practicable, unless authorized by this VWP general permit.
8. No machinery may enter flowing waters, unless authorized by
this VWP general permit or approved prior to entry by the Department of
Environmental Quality.
9. Heavy equipment in temporarily impacted wetland areas shall
be placed on mats, geotextile fabric, or other suitable material, to minimize
soil disturbance to the maximum extent practicable. Equipment and materials
shall be removed immediately upon completion of work.
10. All nonimpacted surface waters and compensatory mitigation
areas within 50 feet of permitted authorized activities and
within the project or right-of-way limits shall be clearly flagged or marked
for the life of the construction activity at that location to preclude unauthorized
disturbances to these surface waters and compensatory mitigation areas during
construction. The permittee shall notify contractors that no activities are to
occur in these marked surface waters.
11. Temporary disturbances to surface waters during
construction shall be avoided and minimized to the maximum extent practicable.
All temporarily disturbed wetland areas shall be restored to preexisting
conditions within 30 days of completing work at each respective temporary
impact area, which shall include reestablishing preconstruction elevations
and contours, with topsoil from the impact area where practicable
and planting or seeding with appropriate wetland vegetation according to cover
type (i.e., emergent, scrub/shrub scrub-shrub, or
forested). The permittee shall take all appropriate measures to promote and
maintain revegetation of temporarily disturbed wetland areas with wetland
vegetation through the second year post-disturbance. All temporarily impacted
streams and streambanks shall be restored to their original preconstruction
elevations and contours with topsoil from the impact area where
practicable within 30 days following the construction at that stream
segment, and the banks. Streambanks shall be seeded or planted
with the same vegetation cover type originally present along the streambanks,
including [ any necessary, ] supplemental erosion control
grasses [ if necessary ], except for invasive.
Invasive species identified on DCR's the Department of
Conservation and Recreation's Virginia Invasive Alien Plant Species of
Virginia list List shall not be used to the maximum extent practicable
or without prior approval from the Department of Environmental Quality.
12. Materials (including fill, construction debris, and
excavated and woody materials) temporarily stockpiled in wetlands shall be
placed on mats or geotextile fabric, immediately stabilized to prevent entry
into state waters, managed such that leachate does not enter state waters, and
completely removed within 30 days following completion of that construction
activity. Disturbed areas shall be returned to original preconstruction
elevations and contours, with topsoil from the impact area where
practicable; restored within 30 days following removal of the stockpile,;
and restored with the same vegetation cover type originally present, including
[ any necessary ] supplemental erosion control grasses [ if
necessary ], except for invasive. Invasive species
identified on DCR's the Department of Conservation and Recreation's
Virginia Invasive Alien Plant Species of Virginia list List
shall not be used to the maximum extent practicable or without prior approval
from the Department of Environmental Quality.
13. Continuous flow of perennial springs shall be maintained
by the installation of spring boxes, french drains, or other similar
structures.
14. The permittee shall employ measures to prevent spills of
fuels or lubricants into state waters.
15. The permittee shall conduct his activities in accordance
with the time-of-year restrictions recommended by the Virginia Department of
Game and Inland Fisheries, the Virginia Marine Resources Commission, or other
interested and affected agencies, as contained, when applicable, in
Department of Environmental Quality VWP general permit coverage, and shall
ensure that all contractors are aware of the time-of-year restrictions imposed.
16. Water quality standards shall not be violated as a result
of the construction activities, unless allowed by this permit authorization.
17. If stream channelization or relocation is required, all
work in surface waters shall be done in the dry, unless otherwise
authorized by this VWP general permit the Department of Environmental
Quality, and all flows shall be diverted around the channelization or
relocation area until the new channel is stabilized. This work shall be
accomplished by leaving a plug at the inlet and outlet ends of the new channel
during excavation. Once the new channel has been stabilized, flow shall be
routed into the new channel by first removing the downstream plug and then the
upstream plug. The rerouted stream flow must be fully established before
construction activities in the old stream channel can begin.
D. C. Road crossings.
1. Access roads and associated bridges or, pipes,
and culverts shall be constructed to minimize the adverse effects on
surface waters to the maximum extent practicable. Access roads constructed
above preconstruction elevations and contours and elevations in
surface waters must be bridged, piped, or culverted to maintain surface
flows.
2. Installation of road crossings shall occur in the dry via
the implementation of cofferdams, sheetpiling, stream diversions, or similar
structures.
E. D. Utility
lines.
1. All utility line work in surface waters shall be performed
in a manner that minimizes disturbance, and the area must be returned to its original
preconstruction elevations and contours with topsoil from the impact
area where practicable and restored within 30 days of completing work in
the area, unless otherwise authorized by this VWP general permit the
Department of Environmental Quality. Restoration shall be the seeding or
planting of the same vegetation cover type originally present, including
[ any necessary ] supplemental erosion control grasses [ if
necessary ], except for invasive. Invasive species
identified on DCR's the Department of Conservation and Recreation's
Virginia Invasive Alien Plant Species of Virginia list List
shall not be used to the maximum extent practicable or without prior approval
from the Department of Environmental Quality.
2. Material resulting from trench excavation may be
temporarily sidecast into wetlands not to exceed a total of 90 days, provided
the material is not placed in a manner such that it is dispersed by currents or
other forces.
3. The trench for a utility line cannot be constructed in a
manner that drains wetlands (e.g., backfilling with extensive gravel layers
creating a french drain effect). For example, utility lines may be backfilled
with clay blocks to ensure that the trench does not drain surface waters
through which the utility line is installed.
F. E. Stream modification and stream bank
protection.
1. Riprap bank stabilization shall be of an appropriate size
and design in accordance with the Virginia Erosion and Sediment Control
Handbook, Third Edition, 1992.
2. Riprap aprons for all outfalls shall be designed in
accordance with the Virginia Erosion and Sediment Control Handbook, Third
Edition, 1992.
3. For bank protection activities, the structure and backfill
shall be placed as close to the stream bank as practicable. No material shall
be placed in excess of the minimum necessary for erosion protection.
4. All stream bank protection structures shall be located to
eliminate or minimize impacts to vegetated wetlands to the maximum extent
practicable.
5. Asphalt and materials containing asphalt or other toxic
substances shall not be used in the construction of submerged sills or
breakwaters.
6. Redistribution of existing stream substrate for the purpose
of erosion control is prohibited.
7. No material removed from the stream bottom shall be
disposed of in surface waters, unless otherwise authorized by
this VWP general permit.
G. F. Dredging.
1. Dredging depths shall be determined and authorized
according to the proposed use and controlling depths outside the area to be
dredged.
2. Dredging shall be accomplished in a manner that minimizes
disturbance of the bottom and minimizes turbidity levels in the water column.
3. If evidence of impaired water quality, such as a fish kill,
is observed during the dredging, dredging operations shall cease, and
the Department of Environmental Quality (DEQ) shall be notified
immediately.
4. Barges used for the transportation of dredge material shall
be filled in such a manner to prevent the overflow of dredged materials.
5. Double handling of dredged material in state waters shall
not be permitted.
6. For navigation channels the following shall apply:
a. A buffer of four times the depth of the dredge cut shall be
maintained between the bottom edge of the design channel and the channelward
limit of wetlands, or a buffer of 15 feet shall be maintained from the dredged
cut and the channelward edge of wetlands, whichever is greater. This landward
limit of buffer shall be flagged and inspected prior to construction.
b. Side slope cuts of the dredging area shall not exceed a
two-horizontal-to-one-vertical slope to prevent slumping of material into the
dredged area.
7. A dredged material management plan for the designated
upland disposal site shall be submitted and approved 30 days prior to initial
dredging activity.
8. Pipeline outfalls and spillways shall be located at
opposite ends of the dewatering area to allow for maximum retention and
settling time. Filter fabric shall be used to line the dewatering area and to
cover the outfall pipe to further reduce sedimentation to state waters.
9. The dredge material dewatering area shall be of adequate
size to contain the dredge material and to allow for adequate dewatering and
settling out of sediment prior to discharge back into state waters.
10. The dredge material dewatering area shall utilize an
earthen berm or straw bales covered with filter fabric along the edge of the
area to contain the dredged material, and filter bags, or other
similar filtering practices, any of which shall be properly stabilized
prior to placing the dredged material within the containment area.
11. Overtopping of the dredge material containment berms with
dredge materials shall be strictly prohibited.
H. G. Stormwater management facilities.
1. Stormwater management facilities shall be installed in
accordance with best management practices and watershed protection techniques
(e.g., vegetated buffers, siting considerations to minimize adverse effects to
aquatic resources, bioengineering methods incorporated into the facility design
to benefit water quality and minimize adverse effects to aquatic resources)
that provide for long-term aquatic resources protection and enhancement, to the
maximum extent practicable.
2. Compensation for unavoidable impacts shall not be allowed
within maintenance areas of stormwater management facilities.
3. Maintenance activities within stormwater management
facilities shall not require additional permit authorization coverage
or compensation, provided that the maintenance activities do not exceed the
original contours of the facility, as approved and constructed, and is
accomplished in designated maintenance areas as indicated in the facility
maintenance or design plan or when unavailable, an alternative plan approved
by the Department of Environmental Quality.
Part II. Construction and Compensation Requirements,
Monitoring and Reporting.
A. Minimum compensation requirements [ :. ]
1. The permittee shall provide appropriate and practicable
any required compensation for all impacts meeting in
accordance with the conditions outlined in this VWP general permit
[ , the coverage letter, ] and the chapter promulgating the
general permit. For all compensation that requires a protective mechanism,
including preservation of surface waters or buffers, the permittee shall record
the approved protective mechanism in the chain of title to the property, or an
equivalent instrument for government-owned lands, and proof of recordation
shall be submitted to the Department of Environmental Quality prior to
commencing impacts in surface waters.
2. Compensation options that may be considered under this VWP
general permit shall meet the criteria in 9VAC25-680-70 and 9VAC25-210-116.
3. The permittee-responsible compensation site or sites
depicted in the conceptual compensation plan submitted with the application
shall constitute the compensation site for the approved project. A site
change will may require a modification to the authorization
coverage.
4. For compensation involving the purchase or use of
mitigation bank credits or a contribution to an the purchase of
in-lieu fee fund program credits, the permittee shall not
initiate work in permitted impact areas until documentation of the mitigation
bank credit purchase or usage or of the fund contribution in-lieu
fee program credit purchase has been submitted to and received by DEQ
the Department of Environmental Quality.
5. All aspects of the compensation The final
compensatory mitigation plan shall be finalized, submitted to
and approved by the board prior to a construction activity in permitted impact
areas. The board shall review and provide written comments on the final
plan within 30 days of receipt or it shall be deemed approved. The final compensation
plan as approved by the board shall be an enforceable requirement of any
coverage under this VWP general permit authorization. Deviations
from the approved final plan must shall be submitted and
approved in advance by the board.
6. a. The final permittee-responsible
wetlands compensation plan shall include:
a. The goals and objectives of the plan in terms of
replacement of wetland acreage and functions, by wetland type;
b. Location map, including latitude and longitude (to the
nearest second) at the center of the site;
c. Summary of the type and acreage of existing wetland
impacts anticipated during the construction of the compensation site and
proposed compensation for these impacts;
d. Grading plan with existing and proposed elevations at
one-foot or less contours;
e. Schedule for compensation site construction, including
sequence of events with estimated dates;
f. Hydrologic analysis, including a water budget based on
expected monthly inputs and outputs that will project water level elevations
for a typical year, a dry year, and a wet year;
g. Groundwater elevation data for the site, or the location
of groundwater monitoring wells to collect these data, and groundwater data for
reference wetlands, if applicable;
h. Design of water control structures;
i. Planting scheme and schedule, indicating plant species
zonation, and acreage of each vegetation type proposed;
j. An abatement and control plan covering all undesirable
plant species, as listed on DCR's Invasive Alien Plant Species of Virginia
list, that includes the proposed procedures for notifying DEQ of their
presence, methods of removal, and the control of such species;
k. Erosion and sedimentation control plan;
l. A soil preparation and amendment plan addressing both
topsoil and subsoil conditions;
m. A discussion of structures and features considered
necessary for the success of the plan;
n. A monitoring plan, including success criteria,
monitoring goals and methodologies, monitoring and reporting schedule, and the
locations of photographic stations and monitoring wells, sampling points and,
if applicable, reference wetlands;
o. Site access plan;
p. The location and composition of any buffers; and
q. The mechanism for protection of the compensation areas.
(1) The complete information on all components of the
conceptual compensation plan.
(2) A summary of the type and acreage of existing wetland
impacts anticipated during the construction of the compensation site and the
proposed compensation for these impacts; a site access plan; a monitoring plan,
including proposed success criteria, monitoring goals, and the location of
photo-monitoring stations, monitoring wells, vegetation sampling points, and
reference wetlands or streams [ (if available), if
available ]; an abatement and control plan for undesirable plant
species; an erosion and sedimentation control plan; a construction schedule;
and the final protective mechanism for the protection of the compensation site
or sites, including all surface waters and buffer areas within its boundaries.
(3) The approved protective mechanism. The protective
mechanism shall be recorded in the chain of title to the property, or an
equivalent instrument for government-owned lands, and proof of recordation
shall be submitted to the Department of Environmental Quality prior to
commencing impacts in surface waters.
7. b. The final permittee-responsible
stream compensation plan shall include:
a. The goals and objectives of the compensation plan in
terms of replacement of stream functions and water quality benefits;
b. A location map, including latitude and longitude (to the
nearest second) at the center of the site;
c. An evaluation, discussion, and plan sketches of existing
conditions on the proposed compensation stream, including the identification of
functional and physical deficiencies for which the measures are proposed, and
summary of geomorphologic measurements (e.g., stream width, entrenchment ratio,
width-depth ratio, sinuosity, slope, substrate, etc.);
d. The identification of existing geomorphological stream
type being impacted and proposed geomorphological stream type for compensation
purposes;
e. Detailed design information for the proposed restorative
measures, including geomorphological measurements and reference reach
information as appropriate;
f. Riparian buffer plantings, including planting scheme,
species, buffer width;
g. Livestock access limiting measures, to the greatest
extent possible;
h. A site access plan;
i. An erosion and sedimentation control plan, if
appropriate;
j. Abatement and control plan covering all undesirable
plant species, as listed on DCR's Invasive Alien Plant Species of Virginia list
that includes the proposed procedures for notifying DEQ of their presence,
methods for removal, and the control of such species;
k. A schedule for compensation site construction including
projected start date, sequence of events with projected dates, and projected
completion date;
l. A monitoring plan, including a monitoring and reporting
schedule; monitoring design and methodologies to evaluate the success of the
proposed compensation measures, allowing comparison from year to year; proposed
success criteria for appropriate compensation measures; location of all
monitoring stations including photo stations, vegetation sampling points,
survey points, bank pins, scour chains, and reference streams;
m. The mechanism for protection of the compensation area;
and
n. Plan view sketch depicting the pattern and all
compensation measures being employed, a profile sketch, and cross-section
sketches of the proposed compensation stream.
(1) The complete information on all components of the
conceptual compensation plan.
(2) An evaluation, discussion, and plan drawing or drawings
of existing conditions on the proposed compensation stream, including the
identification of functional and physical deficiencies for which the measures
are proposed, and summary of geomorphologic measurements (e.g., stream width,
entrenchment ratio, width-depth ratio, sinuosity, slope, substrate, etc.); a
site access plan; a monitoring plan, including a monitoring and reporting
schedule, monitoring design and methodologies for success, proposed success
criteria, location of photo-monitoring stations, vegetation sampling points,
survey points, bank pins, scour chains, and reference streams; an abatement and
control plan for undesirable plant species; an erosion and sedimentation
control plan, if appropriate; a construction schedule; a plan-view drawing
depicting the pattern and all compensation measures being employed; a profile
drawing; cross-sectional drawing or drawings of the proposed compensation
stream; and the final protective mechanism for the protection of the
compensation site or sites, including all surface waters and buffer areas
within its boundaries.
(3) The approved protective mechanism. The protective
mechanism shall be recorded in the chain of title to the property, or an
equivalent instrument for government-owned lands, and proof of recordation
shall be submitted to the Department of Environmental Quality prior to
commencing impacts in surface waters.
8. For final 6. The following criteria shall apply
to permittee-responsible wetland or stream compensation plans, the:
a. The vegetation used shall be native species common
to the area, shall be suitable for growth in local wetland or riparian
conditions, and shall be from areas within the same or adjacent USDA U.S.
Department of Agriculture Plant Hardiness Zone or NRCS Natural
Resources Conservation Service Land Resource Region as that of the project
site. Planting of woody plants shall occur when vegetation is normally
dormant, unless otherwise approved in the final wetlands or stream compensation
plan or plans.
9. The final wetland or stream compensation plan or plans
shall include a mechanism for protection in perpetuity of the compensation
sites to include all state waters within the compensation site boundary or
boundaries. Such protections shall be in place within 120 days of final
compensation plan approval. The restrictions, protections, or preservations, or
similar instrument, shall state that no activity will be performed on the
property in any area designated as a compensation area with the exception of
maintenance or corrective action measures authorized by the board. Unless
specifically authorized by the board through the issuance of a VWP individual
or general permit, or waiver thereof, this restriction applies to ditching,
land clearing or the discharge of dredge or fill material. Such instrument
shall contain the specific phrase "ditching, land clearing or discharge of
dredge or fill material" in the limitations placed on the use of these
areas. The protective instrument shall be recorded in the chain of title to the
property, or an equivalent instrument for government-owned lands. Proof of recordation
shall be submitted within 120 days of final compensation plan approval.
10. b. All work in permitted impact areas shall
cease if compensation site construction has not commenced within 180 days of
commencement of project construction, unless otherwise authorized by the board.
11. DEQ c. The Department of Environmental Quality
shall be notified in writing at least 10 days prior to the initiation of
construction activities at the compensation sites site.
12. Planting of woody plants shall occur when vegetation is
normally dormant unless otherwise approved in the final wetlands or stream
compensation plan(s).
13. d. Point sources of stormwater runoff shall
be prohibited from entering a wetland compensation site prior to treatment by
appropriate best management practices. Appropriate best management practices
may include sediment traps, grassed waterways, vegetated filter strips, debris
screens, oil and grease separators, or forebays.
14. e. The success of the compensation shall be
based on meeting the success criteria established in the approved final
compensation plan.
15. Wetland hydrology shall be considered established if
depths to the seasonal high water table are equal to or less than 12 inches
below ground surface for at least 12.5% of the region's killing frost-free
growing season, as defined in the soil survey for the locality of the
compensation site or the NRCS WETS table, measured in consecutive days under
typical precipitation conditions, and as defined in the water budget of the
final compensation plan. For the purpose of this regulation, the growing season
is defined as the period in which temperatures are expected to be above 28
degrees Fahrenheit in five out of 10 years, or the period during which the soil
temperature in a wetland compensation site is greater than biological zero
(five degrees Celsius) at a depth of 50 centimeters (19.6 inches), if such data
is available.
16. The wetland plant community shall be considered
established according to the performance criteria specified in the final
compensation plan and approved by the board. The proposed vegetation success
criteria in the final compensation plan shall include the following:
a. Species composition shall reflect the desired plant
community types stated in the final wetland compensation plan by the end of the
first growing season and shall be maintained through the last monitoring year.
b. Species composition shall consist of greater than 50%
facultative (FAC) or wetter (FACW or OBL) vegetation, as expressed by plant
stem density or areal cover, by the end of the first growing season and shall
be maintained through the last monitoring year.
17. Undesirable plant species shall be identified and
controlled as described in the undesirable plant species control plan, such
that they are not dominant species or do not change the desired community
structure. The control plan shall include procedures to notify DEQ when
undesirable plant species comprise greater than 5.0% of the vegetation by areal
coverage on wetland or stream compensation sites. The notification shall
include the methods of removal and control, and whether the methods are
successful.
18. f. If the wetland or stream compensation
area fails to meet the specified success criteria in a particular monitoring
year, other than the final monitoring year, the reasons for this failure shall
be determined and a corrective action plan shall be submitted to DEQ the
Department of Environmental Quality for approval with or before that year's
monitoring report. The corrective action plan shall contain at minimum the
proposed actions, a schedule for those actions, and a monitoring plan, and
shall be implemented by the permittee in accordance with the approved schedule.
Should significant changes be necessary to ensure success, the required
monitoring cycle shall begin again, with monitoring year one being the year
that the changes are complete as confirmed by DEQ the Department of
Environmental Quality. If the wetland or stream compensation area fails to
meet the specified success criteria by the final monitoring year [ , ]
or if the wetland or stream compensation area has not met the stated restoration
goals, reasons for this failure shall be determined and a corrective action
plan, including proposed actions, a schedule, and a monitoring plan, shall be
submitted with the final year monitoring report for DEQ the
Department of Environmental Quality approval. Corrective action shall be
implemented by the permittee in accordance with the approved schedule. Annual
monitoring shall be required to continue until two sequential, annual reports
indicate that all criteria have been successfully satisfied and the site has
met the overall restoration goals (e.g., that corrective actions were
successful).
19. g. The surveyed wetland boundary for
the compensation site shall be based on the results of the hydrology, soils,
and vegetation monitoring data and shall be shown on the site plan. Calculation
of total wetland acreage shall be based on that boundary at the end of the
monitoring cycle. Data shall be submitted by December 31 of the final
monitoring year.
20. h. Herbicides or algicides shall not
be used in or immediately adjacent to the compensation site or sites without
prior authorization by the board. All vegetation removal shall be done by
manual means only, unless authorized by DEQ the Department of
Environmental Quality in advance.
B. Impact site construction monitoring.
1. Construction activities authorized by this permit that are
within impact areas shall be monitored and documented. The monitoring shall document
the preexisting conditions, activities during construction, and
post-construction conditions. Monitoring shall consist of one of the
following options:
a. Photographs shall be taken during construction at the
end of the first, second and third months of commencing construction, and then
every six months thereafter for the remainder of the construction project.
Photos are not required during periods of no activity within impact areas.
b. An ortho-rectified photograph shall be taken by a firm
specializing in ortho-rectified photography prior to construction, and annually
thereafter, until all impacts are taken. Photos shall clearly show the
delineated surface waters and authorized impact areas.
c. In lieu of photographs, and with prior approval from
DEQ, the permittee may submit a written narrative that summarizes site
construction activities in impact areas. The narrative shall be submitted at
the end of the first, second, and third months after commencing construction,
and then every six months thereafter, for the remainder of the construction
activities. Narratives are not required during periods of no activity with the
impact areas.
2. As part of construction monitoring, photographs taken at
the photo stations or the narrative shall document site activities and
conditions, which may include installation and maintenance of erosion and
sediment controls; surface water discharges from the site; condition of
adjacent nonimpact surface waters; flagged nonimpact surface waters;
construction access and staging areas; filling, excavation, and dredging
activities; culvert installation; dredge disposal; and site stabilization,
grading, and associated restoration activities. With the exception of the preconstruction
photographs, photographs at an individual impact site shall not be required
until construction activities are initiated at that site. With the exception of
the post-construction photographs, photographs at an individual impact site
shall not be required once the site is stabilized following completion of
construction at that site.
3. Each photograph shall be labeled to include the
following information: permit number, impact area and photo station number,
date and time of the photograph, name of the person taking the photograph,
photograph orientation, and photograph subject description.
a. Preconstruction photographs taken at each impact area
prior to initiation of activities within impact areas. Photographs shall remain
on the project site and depict the impact area and the nonimpacted surface
waters immediately adjacent to and downgradient of each impact area. Each
photograph shall be labeled to include the following information: permit
number, impact area number, date and time of the photograph, name of the person
taking the photograph, photograph orientation, and photograph subject
description.
b. Site inspections shall be conducted by the permittee or
the permittee's qualified designee once every calendar month during activities
within impact areas. Monthly inspections shall be conducted in the following
areas: all authorized permanent and temporary impact areas; all avoided surface
waters, including wetlands, stream channels, and open water; surface water
areas within 50 feet of any land disturbing activity and within the project or
right-of-way limits; and all [ on site on-site ]
permanent preservation areas required under this permit. Observations shall
be recorded on the inspection form provided by the Department of Environmental
Quality. The form shall be completed in its entirety for each monthly
inspection and shall be kept on site and made available for review by the
Department of Environmental Quality staff upon request during normal business
hours. Inspections are not required during periods of no activity within impact
areas.
4. 2. Monitoring of water quality parameters
shall be conducted during permanent relocation of perennial streams through new
channels in the manner noted below. The permittee shall report violations of
water quality standards to DEQ the Department of Environmental
Quality in accordance with the procedures in Part II E 9VAC25-680-100
Part II E. Corrective measures and additional monitoring may be required if
water quality standards are not met. Reporting shall not be required if water
quality standards are not violated.
a. A sampling station shall be located upstream and
immediately downstream of the relocated channel.
b. Temperature, pH [ , ] and dissolved oxygen
(D.O.) measurements shall be taken every 30 minutes for at least two hours at
each station prior to opening the new channels and immediately before opening
new channels.
c. Temperature, pH [ , ] and D.O. readings
shall be taken after opening the channels and every 30 minutes for at least
three hours at each station.
C. Wetland Permittee-responsible wetland
compensation site monitoring.
1. An as-built ground survey, or an aerial survey provided by
a firm specializing in aerial surveys, shall be conducted for the entire
compensation site or sites, including invert elevations for all water elevation
control structures and spot elevations throughout the site or sites. Aerial
surveys shall include the variation from actual ground conditions, such as +/-
0.2 feet. Either type of survey shall be certified by a licensed surveyor or by
a registered professional engineer to conform to the design plans. The survey
shall be submitted within 60 days of completing compensation site construction.
Changes or deviations in the as-built survey or aerial survey shall be shown on
the survey and explained in writing.
2. Photographs shall be taken at the compensation site or
sites from the permanent markers identified in the final compensation plan, and
established to ensure that the same locations and view directions at the site
or sites are monitored in each monitoring period. These photographs shall be
taken after the initial planting and at a time specified in the final
compensation plan during every monitoring year.
3. Compensation site monitoring shall begin on the first day
of the first complete growing season (monitoring year 1) after wetland
compensation site construction activities, including planting, have been
completed. Monitoring shall be required for monitoring years 1, 2, 3, and 5,
unless otherwise approved by DEQ the Department of Environmental
Quality. In all cases, if all success criteria have not been met in the
final monitoring year, then monitoring shall be required for each consecutive
year until two annual sequential reports indicate that all criteria have been
successfully satisfied.
4. The establishment of wetland hydrology shall be measured
weekly during the growing season, with the location and number of monitoring
wells, and frequency of monitoring for each site, set forth in the final
monitoring plan. Hydrology monitoring well data shall be accompanied by
precipitation data, including rainfall amounts, either from on site or from the
closest weather station. Once the wetland hydrology success criteria have been
satisfied for a particular monitoring year, monitoring may be discontinued for
the remainder of that monitoring year following DEQ Department of
Environmental Quality approval. After a period of three monitoring years,
the permittee may request that hydrology monitoring be discontinued, providing
that adequate hydrology has been established and maintained. Hydrology
monitoring shall not be discontinued without written approval from DEQ the
Department of Environmental Quality.
5. The presence of hydric soils or soils under hydric
conditions shall be evaluated in accordance with the final compensation plan.
6. The establishment of wetland vegetation shall be in
accordance with the final compensation plan. Monitoring shall take place in
August, September, or October during the growing season of each monitoring
year, unless otherwise authorized in the monitoring plan.
7. The presence of undesirable plant species shall be
documented.
8. All wetland compensation monitoring reports shall be
submitted in accordance with 9VAC25-680-100 Part II E 6.
D. Stream Permittee-responsible stream
compensation, restoration, and monitoring.
1. Riparian buffer restoration activities shall be detailed in
the final compensation plan and shall include, as appropriate, the planting of
a variety of native species currently growing in the site area, including
appropriate seed mixtures and woody species that are bare root, balled, or
burlapped. A minimum buffer width of 50 feet, measured from the top of the
stream bank at bankfull elevation landward on both sides of the stream, shall
be required where practical.
2. The installation of root wads, vanes, and other instream
structures, shaping of the stream banks and channel relocation shall be
completed in the dry whenever practicable.
3. Livestock access to the stream and designated riparian
buffer shall be limited to the greatest extent practicable.
4. Stream channel restoration activities shall be conducted in
the dry or during low flow conditions. When site conditions prohibit access
from the streambank, or upon prior authorization from the Department
of Environmental Quality, heavy equipment shall may be
authorized for use within the stream channel.
5. Photographs shall be taken at the compensation site from
the vicinity of the permanent [ photo photo-monitoring ]
stations identified in the final compensation plan. The photograph orientation
shall remain constant during all monitoring events. At a minimum, photographs
shall be taken from the center of the stream, facing downstream, with a
sufficient number of photographs to view the entire length of the restoration
site. Photographs shall document the completed restoration conditions.
Photographs shall be taken prior to site activities, during instream and
riparian compensation construction activities, within one week of completion of
activities, and during at least one day of each monitoring year to depict
restored conditions.
6. An as-built ground survey, or an aerial survey provided by
a firm specializing in aerial surveys, shall be conducted for the entire
compensation site or sites. Aerial surveys shall include the variation from
actual ground conditions, such as +/- 0.2 feet. The survey shall be certified
by the licensed surveyor or by a registered, professional engineer to conform
to the design plans. The survey shall be submitted within 60 days of completing
compensation site construction. Changes or deviations from the final
compensation plans in the as-built survey or aerial survey shall be shown on
the survey and explained in writing.
7. Compensation site monitoring shall begin on day one of the
first complete growing season (monitoring year 1) after stream compensation
site constructions activities, including planting, have been completed. Monitoring
shall be required for monitoring years 1 and 2, unless otherwise determined
approved by DEQ the Department of Environmental Quality.
In all cases, if all success criteria have not been met in the final monitoring
year, then monitoring shall be required for each consecutive year until two
annual sequential reports indicate that all criteria have been successfully
satisfied.
8. All stream compensation site monitoring reports
shall be submitted in accordance with 9VAC25-680-100 Part II E 6.
E. Reporting.
1. Written communications required by this VWP general permit
shall be submitted to the appropriate DEQ Department of Environmental
Quality office. The VWP general permit authorization tracking
number shall be included on all correspondence.
2. DEQ The Department of Environmental Quality
shall be notified in writing at least 10 days prior to the start of
construction activities at the first permitted site authorized by this VWP
general permit authorization so that inspections of the project can be planned,
if deemed necessary by DEQ. The notification shall include a projected schedule
for initiation and completion of work at each permitted impact area.
3. Construction monitoring reports shall be submitted to
DEQ no later than the 10th day of the month following the month in which the
monitoring event specified in Part II B takes place, unless otherwise specified
below. The reports shall include the following, as appropriate:
a. For each permitted impact area, a written narrative
stating whether work was performed during the monitoring period, and if work
was performed, a description of the work performed, when the work was
initiated, and the expected date of completion.
b. Photographs labeled with the permit number, the photo
station number, the photo orientation, the date and time of the photo, the name
of the person taking the photograph, and a brief description of the
construction activities. The first construction monitoring report shall include
the photographs taken at each impact site prior to initiation of construction
in a permitted impact area. Written notification and photographs demonstrating
that all temporarily disturbed wetland and stream areas have been restored in
compliance with the permit conditions shall be submitted within 30 days of
restoration. The post-construction photographs shall be submitted within 30
days of documenting post-construction conditions.
c. Summary of activities conducted to comply with the
permit conditions.
d. Summary of permit noncompliance events or problems
encountered, subsequent notifications, and corrective actions.
e. Summary of anticipated work to be completed during the
next monitoring period and an estimated date of construction completion at all
impact areas.
f. Labeled site map depicting all impact areas and photo
stations.
3. A construction status update form provided by the
Department of Environmental Quality shall be completed and submitted to the
Department of Environmental Quality twice per year for the duration of coverage
under a VWP general permit. Forms completed in June shall be submitted by or on
July 10, and forms completed in December shall be submitted by or on January 10.
The form shall include reference to the VWP permit tracking number and one of
the following statements for each authorized surface water impact location:
a. Construction activities have not yet started;
b. Construction activities have started;
c. Construction activities have started but are currently
inactive; or
d. Construction activities are complete.
4. DEQ The Department of Environmental Quality
shall be notified in writing within 30 days following the completion of all
activities in all permitted authorized impact areas authorized
under this permit.
5. DEQ The Department of Environmental Quality
shall be notified in writing at least 10 days prior to the initiation of
activities at the permittee-responsible compensation site. The
notification shall include a projected schedule of activities and construction
completion.
6. All permittee-responsible compensation site
monitoring reports shall be submitted annually by December 31, with the
exception of the last year of authorization, in which case the report
shall be submitted at least 60 days prior to the expiration of authorization
under the general permit, unless otherwise approved by the Department of
Environmental Quality.
a. All wetland compensation site monitoring reports
shall include, as applicable, the following:
(1) General description of the site including a site location
map identifying [ photo photo-monitoring ] stations,
vegetative and soil monitoring stations, monitoring wells, and wetland zones.
(2) Summary of activities completed during the monitoring
year, including alterations or maintenance conducted at the site.
(3) Description of monitoring methods.
(4) Analysis of all hydrology information, including
monitoring well data, precipitation data, and gauging data from streams or other
open water areas, as set forth in the final compensation plan.
(5) Evaluation of hydric soils or soils under hydric
conditions, as appropriate.
(6) Analysis of all vegetative community information,
including woody and herbaceous species, both planted and volunteers, as set
forth in the final compensation plan.
(7) Photographs labeled with the permit number, the name of
the compensation site, the photo photo-monitoring station number,
the photograph orientation, the date and time of the photograph, the name of
the person taking the photograph, and a brief description of the photograph
subject. This information shall be provided as a separate attachment to each
photograph, if necessary. Photographs taken after the initial planting shall be
included in the first monitoring report after planting is complete.
(8) Discussion of wildlife or signs of wildlife observed at
the compensation site.
(9) Comparison of site conditions from the previous monitoring
year and reference site.
(10) Discussion of corrective measures or maintenance
activities to control undesirable species, to repair damaged water control
devices, or to replace damaged planted vegetation.
(11) Corrective action plan [ , which that ]
includes proposed actions, a schedule, and monitoring plan.
b. All stream compensation site monitoring reports
shall include, as applicable, the following:
(1) General description of the site including a site location
map identifying [ photo photo-monitoring ] stations and
monitoring stations.
(2) Summary of activities completed during the monitoring
year, including alterations or maintenance conducted at the site.
(3) Description of monitoring methods.
(4) [ An evaluation Evaluation ] and
discussion of the monitoring results in relation to the success criteria and
overall goals of compensation.
(5) Photographs shall be labeled with the permit number, the
name of the compensation site, the photo photo-monitoring station
number, the photograph orientation, the date and time of the photograph, the
name of the person taking the photograph, and a brief description of the
photograph subject. Photographs taken prior to compensation site construction
activities, during instream and riparian restoration activities, and within one
week of completion of activities shall be included in the first monitoring
report.
(6) [ A discussion Discussion ] of
alterations, maintenance, or major storm events resulting in significant change
in stream profile or cross section, and corrective actions conducted at the
stream compensation site.
(7) Documentation of undesirable plant species and summary of
abatement and control measures.
(8) [ A summary Summary ] of wildlife
or signs of wildlife observed at the compensation site.
(9) Comparison of site conditions from the previous monitoring
year and reference site, and as-built survey, if applicable.
(10) [ A corrective Corrective ]
action plan [ , which that ] includes proposed actions,
a schedule and monitoring plan.
(11) Additional submittals that were approved by DEQ the
Department of Environmental Quality in the final compensation plan.
7. The permittee shall notify DEQ the Department of
Environmental Quality in writing when unusual or potentially complex
conditions are encountered which require debris removal or involve potentially
toxic substance. Measures to remove the obstruction, material, or toxic
substance or to change the location of a structure are prohibited until
approved by DEQ the Department of Environmental Quality.
8. The permittee shall report fish kills or spills of oil or
fuel immediately upon discovery. If spills or fish kills occur between the
hours of 8:15 a.m. to 5 p.m., Monday through Friday, the appropriate DEQ
Department of Environmental Quality regional office shall be notified;
otherwise, the Department of Emergency Management shall be notified at
1-800-468-8892.
9. Violations of state water quality standards shall be
reported within 24 hours to the appropriate DEQ Department of
Environmental Quality office no later than the end of the business day
following discovery.
10. The permittee shall notify the Department of
Environmental Quality no later than the end of the third business day following
the discovery of additional impacts to surface waters including wetlands,
stream channels, and open water that are not authorized by the Department of
Environmental Quality or to any required preservation areas. The notification
shall include photographs, estimated acreage or linear footage of impacts, and
a description of the impacts.
10. 11. Submittals required by this VWP general
permit shall contain the following signed certification statement:
"I certify under penalty of law that this document and
all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violation."
Part III. Conditions Applicable to All VWP General Permits.
A. Duty to comply. The permittee shall comply with all
conditions, limitations, and other requirements of the VWP general
permit; any requirements in coverage granted under this VWP general permit;
the Clean Water Act, as amended; and the State Water Control Law and
regulations adopted pursuant to it. Any VWP general permit violation or
noncompliance is a violation of the Clean Water Act and State Water Control Law
and is grounds for (i) enforcement action, (ii) VWP general permit coverage
termination for cause, (iii) VWP general permit coverage revocation, (iv)
denial of application for coverage, or (v) denial of an application for a
modification to VWP general permit coverage. Nothing in this VWP general
permit shall be construed to relieve the permittee of the duty to comply with
all applicable federal and state statutes, regulations, and toxic
standards and prohibitions. VWP general permit noncompliance is a violation
of the Clean Water Act and State Water Control Law, and is grounds for
enforcement action, VWP general permit authorization, termination for cause,
VWP general permit authorization, revocation, or denial of a continuation of
coverage request.
B. Duty to mitigate. The permittee shall take all reasonable
steps to minimize or prevent impacts in violation of the VWP general permit
that may have a reasonable likelihood of adversely affecting human health or
the environment.
C. Reopener. This VWP general permit authorization may
be reopened to modify its conditions when the circumstances on which the
previous VWP general permit authorization was based have materially and
substantially changed, or special studies conducted by the board or the permittee
show material and substantial change since the time the VWP general permit authorization
was issued and thereby constitute cause for revoking and reissuing the
VWP general permit authorization revocation and reissuance.
D. Compliance with state and federal law. Compliance with
this VWP general permit constitutes compliance with the VWP permit requirements
of the State Water Control Law. Nothing in this VWP general permit shall be
construed to preclude the institution of any legal action under or relieve the
permittee from any responsibilities, liabilities, or other penalties
established pursuant to any other state law or regulation or under the
authority preserved by § 510 of the Clean Water Act.
E. Property rights. The issuance of this VWP general permit
does not convey property rights in either real or personal property, or
[ any ] exclusive privileges, nor does it authorize injury to
private property or, any invasion of personal property rights, nor
or any infringement of federal, state, or local laws or
regulations.
F. Severability. The provisions of this VWP general permit authorization
are severable.
G. Right of Inspection and entry. The Upon
presentation of credentials, the permittee shall allow the board or its
agents, upon the presentation of credentials any duly authorized agent
of the board, at reasonable times and under reasonable circumstances,
to enter upon the permittee's property, public or private, and have
access to inspect and copy any records that must be kept as part of the
VWP general permit conditions; to inspect any facilities, operations,
or practices (including monitoring and control equipment) regulated or required
under the VWP general permit; and to sample or monitor any substance, parameter,
or activity for the purpose of assuring compliance with the conditions of the
VWP general permit or as otherwise authorized by law. For the purpose of this
section, the time for inspection shall be deemed reasonable during regular
business hours. Nothing contained herein shall make an inspection time
unreasonable during an emergency.
H. Transferability of VWP general permit authorization
coverage. This VWP general permit authorization coverage
may be transferred to another person by a permittee when all of the
criteria listed below in this subsection are met. On the date of
the VWP general permit authorization coverage transfer, the
transferred VWP general permit authorization coverage shall be as
fully effective as if it had been issued granted directly to the
new permittee.
1. The current permittee notifies the board of the proposed
transfer of the title to the facility or property. 2. The notice to the
board includes general permit coverage and provides a written
agreement between the current and new permittees containing a specific date of
transfer of VWP general permit authorization responsibility, coverage,
and liability to the new permittee, or that the current permittee will retain
such responsibility, coverage, or liability, including liability for compliance
with the requirements of enforcement activities related to the permitted
authorized activity.
3. 2. The board does not within 15 days
notify the current and new permittees of its intent to modify or revoke and
reissue the VWP general permit authorization within 15 days.
I. Notice of planned change. Authorization under this VWP
general permit coverage may be modified subsequent to issuance in one
or more of the cases listed below accordance with 9VAC25-680-80. A
notice of planned change is not required if the project results in additional
temporary impacts to surface waters, provided that DEQ is notified in writing,
the additional temporary impacts are restored to preexisting conditions in
accordance with Part I C 11 of this general permit, and the additional
temporary impacts do not exceed the general permit threshold for use. The
permittee shall notify the board in advance of the planned change, and the
planned change request will be reviewed according to all provisions of this regulation.
1. The permittee determines that additional permanent
wetland, open water, or stream impacts are necessary, provided that the
additional impacts are associated with the previously authorized activities in
authorized locations within the same phase of development, the cumulative
increase in acreage of wetland or open water impacts is not greater than 1/4
acre, the cumulative increase in stream bed impacts is not greater than 100
linear feet, and the additional impacts are fully compensated.
2. The project results in less wetland or stream impacts,
in which case compensation requirements may be modified in relation to the
adjusted impacts at the request of the permittee, provided that the adjusted
compensation meets the initial authorization compensation goals.
3. There is a change in the project plans that does not
result in a change in project impacts.
4. There is a change in the mitigation bank at which
credits are purchased or used, provided that the same amount of credits are
purchased or used and all criteria for use are met, as detailed in
9VAC25-210-116 E.
5. Typographical errors need to be corrected.
J. VWP general permit authorization coverage
termination for cause. This VWP general permit authorization coverage
is subject to termination for cause by the board after public notice and
opportunity for a hearing pursuant to [ 9VAC25-230
§ 62.1-44.15:02 of the Code of Virginia ]. Reasons for termination for
cause are as follows:
1. Noncompliance by the permittee with any provision of
[ the VWP general permit regulation this chapter ],
any condition of the VWP general permit authorization, or any
requirement in general permit coverage;
2. The permittee's failure in the application or during the VWP
general permit authorization issuance process of granting VWP general
permit coverage to disclose fully all relevant facts or the permittee's
misrepresentation of any relevant facts at any time;
3. The permittee's violation of a special or judicial order; and
4. A determination by the board that the permitted authorized
activity endangers human health or the environment and can be regulated to
acceptable levels by a modification to VWP general permit authorization
planned change coverage or a termination for cause.;
5. A change in any condition that requires either a
temporary or permanent reduction or elimination of any activity controlled by
the VWP general permit; or
6. A determination that the authorized activity has ceased
and that the compensation for unavoidable adverse impacts has been successfully
completed.
K. The board may terminate VWP general permit coverage
without cause when the permittee is no longer a legal entity due to death or
dissolution or when a company is no longer authorized to conduct business in
the Commonwealth. The termination shall be effective 30 days after notice of
the proposed termination is sent to the last known address of the permittee or
registered agent, unless the permittee objects within that time. If the
permittee does object during that period, the board shall follow the applicable
procedures for termination under §[ § 62.1-44.15:02 and ] 62.1-44.15:25
of the Code of Virginia [ and 9VAC25-230 ].
K. L. VWP general permit authorization coverage
termination by consent. This VWP general permit authorization may be
terminated by consent when all permitted activities requiring notification
under 9VAC25-680-50 A and all compensatory mitigation have been completed or
when the authorized impacts will not occur. The permittee shall submit a
request for termination by consent within 30 days of project completion or
project cancellation completing or [ cancelling
canceling ] all authorized activities requiring notification under
9VAC25-680-50 A and all compensatory mitigation requirements. When
submitted for project completion, the request for termination by consent
shall constitute a notice of project completion in accordance with
9VAC25-210-130 F. The director may accept this termination of authorization
coverage on behalf of the board. The request for termination by
consent permittee shall contain submit the following
information:
1. Name, mailing address, and telephone number of
the permittee;
2. Name and location of the activity;
3. The VWP general permit authorization tracking
number; and
4. One of the following certifications:
a. For project completion:
"I certify under penalty of law that all activities and
any required compensatory mitigation authorized by a the VWP
general permit and general permit coverage have been completed. I
understand that by submitting this notice of termination I am no longer authorized
to perform activities in surface waters in accordance with the VWP general
permit and general permit coverage, and that performing activities in
surface waters is unlawful where the activity is not authorized by a the
VWP permit or coverage, unless otherwise excluded from obtaining coverage.
I also understand that the submittal of this notice does not release me from
liability for any violations of this the VWP general permit authorization
coverage."
b. For project cancellation:
"I certify under penalty of law that the activities and
any required compensatory mitigation authorized by this the VWP
general permit and general permit coverage will not occur. I understand
that by submitting this notice of termination I am no longer authorized to
perform activities in surface waters in accordance with the VWP general permit and
general permit coverage, and that performing activities in surface waters
is unlawful where the activity is not authorized by a the VWP
permit or coverage, unless otherwise excluded from obtaining coverage. I
also understand that the submittal of this notice does not release me from
liability for any violations of this the VWP general permit authorization
or coverage, nor does it allow me to resume the permitted authorized
activities without reapplication and reauthorization coverage."
c. For events beyond permittee control, the permittee shall
provide a detailed explanation of the events, to be approved by DEQ the
Department of Environmental Quality, and the following certification
statement:
"I certify under penalty of law that the activities or
the required compensatory mitigation authorized by a the VWP
general permit and general permit coverage have [ been completed
changed as the result of events beyond my control ] (see attached).
I understand that by submitting this notice of termination I am no longer
authorized to perform activities in surface waters in accordance with the VWP
general permit and general permit coverage, and that performing
activities in surface waters is unlawful where the activity is not authorized
by a the VWP permit or coverage, unless otherwise excluded
from obtaining coverage. I also understand that the submittal of this
notice does not release me from liability for any violations of this the
VWP general permit authorization or coverage, nor does it allow me to
resume the permitted authorized activities without reapplication
and reauthorization coverage."
L. M. Civil and criminal liability. Nothing in
this VWP general permit shall be construed to relieve the permittee from civil
and criminal penalties for noncompliance.
M. N. Oil and hazardous substance liability.
Nothing in this VWP general permit shall be construed to preclude the
institution of legal action or relieve the permittee from any responsibilities,
liabilities, or penalties to which the permittee is or may be subject under §
311 of the Clean Water Act or §§ 62.1-44.34:14 through 62.1-44.34:23 of
the State Water Control Law.
N. O. Duty to cease or confine activity. It
shall not be a defense for a permittee in an enforcement action that it would
have been necessary to halt or reduce the activity for which a VWP general
permit coverage has been granted in order to maintain compliance with
the conditions of the VWP general permit or coverage.
O. P. Duty to provide information.
1. The permittee shall furnish to the board any information which
that the board may request to determine whether cause exists for
modifying, revoking and reissuing and, or terminating the
VWP permit authorization, coverage or to determine compliance
with the VWP general permit authorization or general permit
coverage. The permittee shall also furnish to the board, upon request,
copies of records required to be kept by the permittee.
2. Plans, maps, conceptual reports, and other relevant
information shall be submitted as required by the board prior to commencing
construction.
P. Q. Monitoring and records requirements.
1. Monitoring of parameters, other than pollutants, shall be
conducted according to approved analytical methods as specified in the VWP general
permit. Analysis of pollutants will be conducted according to 40 CFR Part 136
(2000), Guidelines Establishing Test Procedures for the Analysis of Pollutants.
2. Samples and measurements taken for the purpose of
monitoring shall be representative of the monitored activity.
3. The permittee shall retain records of all monitoring
information, including all calibration and maintenance records and all original
strip chart or electronic recordings for continuous monitoring instrumentation,
copies of all reports required by the VWP general permit, and records of
all data used to complete the application for coverage under the VWP general
permit, for a period of at least three years from the date of the general
permit expiration of a granted VWP permit. This period may be
extended by request of the board at any time.
4. Records of monitoring information shall include, as
appropriate:
a. The date, exact place, and time of sampling or
measurements;
b. The name of the individuals who performed the sampling or
measurements;
c. The date and time the analyses were performed;
d. The name of the individuals who performed the analyses;
e. The analytical techniques or methods supporting the
information such as observations, readings, calculations, and bench data
used;
f. The results of such analyses; and
g. Chain of custody documentation.
Q. R. Unauthorized discharge of pollutants.
Except in compliance with this VWP general permit, it shall be unlawful for the
permittee to:
1. Discharge into state waters sewage, industrial wastes,
other wastes, or any noxious or deleterious substances;
2. Excavate in a wetland;
3. Otherwise alter the physical, chemical, or biological
properties of state waters and make them detrimental to the public health, to
animal or aquatic life, or to the uses of such waters for domestic or
industrial consumption, for recreation, or for other uses; or
4. On and after August 1, 2001, for linear transportation
projects of the Virginia Department of Transportation, or on and after October
1, 2001 [ , ] for all other projects, conduct the following
activities in a wetland:
a. New activities to cause draining that significantly alters
or degrades existing wetland acreage or functions;
b. Filling or dumping;
c. Permanent flooding or impounding; or
d. New activities that cause significant alteration or
degradation of existing wetland acreage or functions.
S. Duty to reapply. Any permittee desiring to continue a
previously authorized activity after the expiration date of the VWP general
permit shall comply with the provisions in 9VAC25-680-27.
NOTICE: The following
forms used in administering the regulation were filed by the agency. The forms
are not being published; however, online users of this issue of the Virginia
Register of Regulations may click on the name of a form with a hyperlink to
access it. The forms are also available from the agency contact or may be
viewed at the Office of the Registrar of Regulations, General Assembly
Building, 2nd Floor, Richmond, Virginia 23219.
FORMS (9VAC25-680)
[ Department of Environmental Quality Water Division
Permit Application Fee Form (rev. 10/14)
Department
of Environmental Quality Water Division Permit Application Fee Form (rev.
10/2014) ]
Joint Permit Application for Activities in Waters and
Wetlands of the Commonwealth of Virginia (eff. 10/04)
[ Joint Permit Application for Projects in Tidewater,
Virginia (eff. 10/04) (eff. 3/14)
Monthly Reporting of Impacts Less than or Equal to
One-Tenth Acre Statewide (eff. 08/2007)
Standard Joint Permit Application for Activities in
Waters and Wetlands of the Commonwealth of Virginia (eff. 03/2014)
Virginia Department of Transportation Inter-Agency
Coordination Meeting Joint Permit Application (eff. 10/02) (eff. 06/2008)
Standard
Joint Permit Application for Activities in Waters and Wetlands of the
Commonwealth of Virginia (eff. 3/2014)
Virginia
Department of Transportation, Inter-Agency Coordination Meeting Joint Permit
Application (eff. 6/2008)
Monthly
Reporting of Impacts Less than or Equal to One-Tenth Acre Statewide (eff.
8/2007) ]
DOCUMENTS INCORPORATED BY REFERENCE (9VAC25-680)
Classification
of Wetlands and Deepwater Habitats of the United States, Cowardin, Lewis M. II,
et al., United States Fish and Wildlife Service, December 1979, Reprinted 1992
[ . ]
Guidelines for Specification of Disposal Sites for Dredged
[ of or ] Fill Material, 40 CFR Part 230
[ (Federal Register December 24, 1980) ]
Virginia Erosion and Sediment Control Handbook, Third
Edition, 1992, Department of Conservation and Recreation.
Virginia
Invasive Plant Species List, Natural Heritage Technical Document 14-11,
Department of Conservation and Recreation, Division of Natural Heritage (2014)
VA.R. Doc. No. R14-4059; Filed May 13, 2016, 8:29 a.m.