TITLE 9. ENVIRONMENT
Final Regulation
REGISTRAR'S NOTICE: The
State Water Control Board is claiming an exemption from Article 2 of the
Administrative Process Act in accordance with § 2.2-4006 A 4 a of the Code
of Virginia, which excludes regulations that are necessary to conform to
changes in Virginia statutory law or the appropriation act where no agency
discretion is involved. The State Water Control Board will receive, consider,
and respond to petitions by any interested person at any time with respect to
reconsideration or revision.
Title of Regulation: 9VAC25-880. General VPDES Permit
for Discharges of Stormwater from Construction Activities (amending 9VAC25-880-50).
Statutory Authority: § 62.1-44.15:25 of the Code of
Virginia.
Effective Date: November 25, 2020.
Agency Contact: Erin Belt, Department of Environmental
Quality, 1111 East Main Street, Suite 1400, P.O. Box 1105, Richmond, VA 23218,
telephone (757) 374-4621, or email erin.belt@deq.virginia.gov.
Summary:
Pursuant to Chapter 565 of the 2020 Acts of Assembly, the
amendments clarify the process whereby any person that receives coverage under
the General Virginia Pollutant Discharge Elimination System (VPDES) Permit for
Discharges of Stormwater from Construction Activities that will be transporting
fill from a project site for disposal off site as part of its land-disturbing
activities discloses to the department as part of its registration statement
(i) the source of the fill to be disposed of, (ii) the contents of the fill,
and (iii) the off-site location of the disposal.
9VAC25-880-50. Registration statement.
A. Deadlines for submitting registration statement. Any
operator seeking coverage under this general permit, and that is required to
submit a registration statement, shall submit a complete and accurate general
VPDES permit registration statement in accordance with this section, which
shall serve as a notice of intent for coverage under the general VPDES permit
for discharges of stormwater from construction activities.
1. New construction activities.
a. Any operator proposing a new stormwater discharge from
construction activities shall submit a complete and accurate registration statement
to the VSMP authority prior to the commencement of land disturbance.
b. Any operator proposing a new stormwater discharge from
construction activities in response to a public emergency where the related
work requires immediate authorization to avoid imminent endangerment to human
health or the environment is authorized to discharge under this general permit,
provided that:
(1) The operator submits a complete and accurate registration
statement to the VSMP authority no later than 30 days after commencing land
disturbance; and
(2) Documentation to substantiate the occurrence of the public
emergency is provided with the registration statement.
c. Any operator proposing a new stormwater discharge
associated with the construction of a single-family detached residential
structure, within or outside a common plan of development or sale, is
authorized to discharge under this general permit and is not required to submit
a registration statement or the department portion of the permit fee.
2. Existing construction activities.
a. Any operator who was authorized to discharge under the
expiring or expired general permit and who intends to continue coverage under
this general permit shall:
(1) Submit a complete and accurate registration statement to
the VSMP authority at least 60 days prior to the expiration date of the
existing permit or a later submittal date established by the board; and
(2) Update its stormwater pollution prevention plan to comply
with the requirements of this general permit no later than 60 days after the
date of coverage under this general permit.
b. Any operator with an existing stormwater discharge
associated with the construction of a single-family detached residential
structure, within or outside a common plan of development or sale that intends
to continue coverage under this general permit, is authorized to discharge
under this general permit and is not required to submit a registration
statement or the department portion of the permit fee, provided that the
operator updates its stormwater pollution prevention plan to comply with the
requirements of this general permit no later than 60 days after the date of
coverage under this general permit.
3. For stormwater discharges from construction activities
where the operator changes, the new operator shall submit a complete and
accurate registration statement or transfer agreement form and any other
documents deemed necessary by the VSMP authority to the VSMP authority to
demonstrate transfer of ownership and long-term maintenance responsibilities
for stormwater management facilities, as required, has occurred prior to
assuming operational control over site specifications or commencing work
on-site.
4. Late notifications. Operators are not prohibited from
submitting registration statements after commencing land disturbance. When a
late registration statement is submitted, authorization for discharges shall
not occur until coverage under the general permit is issued. The VSMP
authority, department, board, and the EPA reserve the right to take enforcement
action for any unpermitted discharges that occur between the commencement of
land disturbance and discharge authorization.
5. Late registration statements. Registration statements for
existing facilities covered under subdivision A 2 a of this section will be
accepted after the expiration date of this permit, but authorization to
discharge will not be retroactive. The VSMP authority, department, board, and
the EPA reserve the right to take enforcement action for any unpermitted
discharges that occur after existing permit coverage expires and prior to
coverage under this permit is approved.
B. Registration statement. The operator shall submit a
registration statement to the VSMP authority that contains the following
information:
1. Name, contact, mailing address, telephone number, and email
address if available of the construction activity operator. No more than one
operator may receive coverage under each registration statement;
NOTE: General permit coverage will be issued to this operator,
and the certification in subdivision 17 of this subsection shall be signed by
the appropriate person associated with this operator as described in Part III K
of 9VAC25-880-70.
2. Name and physical location address of the construction
activity, when available, to be covered under this general permit, including
city or county, and latitude and longitude in decimal degrees (six digits -
ten-thousandths place);
3. A site map (in an 8.5 inch by 11 inch format) showing the
location of the existing or proposed land-disturbing activities for which the
operator is seeking permit coverage, the limits of land disturbance,
construction entrances, on-site support activities, and all water bodies
receiving stormwater discharges from the site;
4. If offsite off-site support activities will
be used, the name and physical location address, when available, of those
offsite all off-site support activities, including city or county;
latitude and longitude in decimal degrees (six digits - ten-thousandths place);
and whether or not the offsite off-site support activity will be
covered under this general permit or a separate VPDES permit;
5. If excavated material (i.e., fill) will be transported
off site for disposal, the name and physical location address, when available,
of all off-site excavated material disposal areas, including city or county;
latitude and longitude in decimal degrees (six digits – ten-thousandths place);
and the contents of the excavated material;
6. Status of the construction activity: federal, state,
public, or private;
6. 7. Nature of the construction activity (e.g.,
commercial, industrial, residential, agricultural, oil and gas, etc.);
7. 8. If stormwater management plans for the
construction activity have been approved by an entity with department approved
annual standards and specifications, the name of the entity with the department
approved annual standards and specifications. A copy of the annual standard and
specification entity form shall be submitted with the registration statement;
8. 9. If the construction activity was
previously authorized to discharge under the general permit effective July 1,
2014, the date of erosion and sediment control plan approval for the estimated
area to be disturbed by the construction activity during this permit term;
9. 10. If the construction activity was
previously authorized to discharge under the general permit effective July 1,
2014, whether land disturbance has commenced;
10. 11. Name of the receiving waters and sixth
order Hydrologic Unit Code (HUC);
11. 12. If the discharge is through a municipal
separate storm sewer system (MS4), the name of the MS4 operator;
12. 13. Estimated project start date and
completion date;
13. 14. Total land area of development and
estimated area to be disturbed by the construction activity during this permit
term (to the nearest one-hundredth of an acre);
14. 15. Whether the area to be disturbed by the
construction activity is part of a larger common plan of development or sale;
15. 16. If nutrient credits are to be used to
demonstrate compliance with the water quality technical criteria as allowed in
9VAC25-870-65 F, a letter of availability from an appropriate nutrient bank
that nonpoint source nutrient credits are available;
16. 17. A stormwater pollution prevention plan
(SWPPP) shall be prepared in accordance with the requirements of the General
VPDES Permit for Stormwater Discharges from Construction Activities prior to
submitting the registration statement. By signing the registration statement,
the operator certifies that the SWPPP has been prepared; and
17. 18. The following certification: "I
certify under penalty of law that I have read and understand this registration
statement and that this document and all attachments were prepared in
accordance with a system designed to assure that qualified personnel properly
gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who manage the system or those persons directly responsible
for gathering the information, the information submitted is to the best of my
knowledge and belief true, accurate, and complete. I am aware that there are
significant penalties for submitting false information including the
possibility of fine and imprisonment for knowing violations."
C. The registration statement shall be signed in accordance
with 9VAC25-880-70, Part III K.
VA.R. Doc. No. R21-6490; Filed September 29, 2020, 5:11 a.m.