REGULATIONS
Vol. 41 Iss. 1 - August 26, 2024

TITLE 9. ENVIRONMENT
STATE WATER CONTROL BOARD
Chapter 151
Final

TITLE 9. ENVIRONMENT

STATE WATER CONTROL BOARD

Final Regulation

REGISTRAR'S NOTICE: The State Water Control Board is claiming an exemption from Article 2 of the Administrative Process Act in accordance with (i) § 2.2-4006 A 4 a of the Code of Virginia, which excludes regulations that are necessary to conform to changes in Virginia statutory law where no agency discretion is involved and (ii) § 2.2-4006 A 3 of the Code of Virginia, which excludes regulations that consist only of changes in style or form or corrections of technical errors. The board will receive, consider, and respond to petitions by any interested person at any time with respect to reconsideration or revision.

Titles of Regulations: 9VAC25-115. Virginia Pollutant Discharge Elimination System (VPDES) General Permit Regulation for Seafood Processing Facilities (amending 9VAC25-115-50).

9VAC25-151. Virginia Pollutant Discharge Elimination System (VPDES) General Permit Regulation for Discharges of Stormwater Associated with Industrial Activity (amending 9VAC25-151-60, 9VAC25-151-70, 9VAC25-151-400).

9VAC25-210. Virginia Water Protection Permit Program Regulation (amending 9VAC25-210-60).

9VAC25-31. Virginia Pollutant Discharge Elimination System (VPDES) Permit Regulation (amending 9VAC25-31-950, 9VAC25-31-960, 9VAC25-31-970, 9VAC25-31-980, 9VAC25-31-1010, 9VAC25-31-1020, 9VAC25-31-1030).

9VAC25-830. Chesapeake Bay Preservation Area Designation and Management Regulations (amending 9VAC25-830-40, 9VAC25-830-130, 9VAC25-830-140, 9VAC25-830-150).

9VAC25-890. Virginia Pollutant Discharge Elimination System (VPDES) General Permit for Discharges of Stormwater from Small Municipal Separate Storm Sewer Systems (MS4s) (amending 9VAC25-890-1, 9VAC25-890-20, 9VAC25-890-30, 9VAC25-890-40).

9VAC25-900. Certification of Nonpoint Source Nutrient Credits (amending 9VAC25-900-10, 9VAC25-900-40, 9VAC25-900-60, 9VAC25-900-90, 9VAC25-900-100, 9VAC25-900-110, 9VAC25-900-120, 9VAC25-900-230).

Statutory Authority:

§ 62.1-44.15 of the Code of Virginia; § 402 of the Clean Water Act; 40 CFR Parts 122, 123, 124, 403, and 503 (9VAC25-31).

§ 62.1-44.15 of the Code of Virginia; § 402 of the Clean Water Act; 40 CFR Parts 122, 123, and 124 (9VAC25-115, 9VAC25-151).

§ 62.1-44.15 of the Code of Virginia; § 401 of the Clean Water Act (9VAC25-210).

§§ 62.1-44.15:69 and 62.1-44.15:72 of the Code of Virginia (9VC25-830).

§ 62.1-44.15:28 of the Code of Virginia (9VAC25-890).

§ 62.1-44.19:20 of the Code of Virginia (9VAC25-900).

Effective Date: September 25, 2024.

Agency Contact: Rebeccah W. Rochet, P.E, Deputy Director, Division of Water Permitting, Department of Environmental Quality, 1111 East Main Street, Suite 1400, P.O. Box 1105, Richmond, VA 23218, telephone (804) 801-2950, or email rebeccah.rochet@deq.virginia.gov.

Summary:

The amendments update references to the Virginia Erosion and Stormwater Management Regulation (9VAC25-875) that became effective July 1, 2024. Pursuant to Chapters 68 and 758 of the 2016 Acts of Assembly, the amendments also reflect changes to the Code of Virginia that became effective July 1, 2024.

9VAC25-31-950. Purpose and scope.

A. This part, in conjunction with the reporting requirements specified in this chapter and 9VAC25-870 9VAC25-875, specifies the requirements for:

1. Electronic reporting of information by VPDES permittees;

2. Facilities or entities seeking coverage under VPDES general permits;

3. Facilities or entities submitting stormwater certifications or waivers from VPDES permit requirements;

4. Industrial users located in municipalities without approved local pretreatment programs; and

5. Approved pretreatment programs.

B. Proper collection, management, and sharing of the data and information listed in Appendix A of 40 CFR Part 127, as adopted by reference in 9VAC25-31-1030, ensures that there is timely, complete, accurate, and nationally consistent set of data about the NPDES program.

9VAC25-31-960. Definitions.

In addition to the definitions given in Part I (9VAC25-31-10 et seq.) of this chapter, the following definitions apply to this part.

"NPDES data group" means the group of related data elements identified in Table 1 in Appendix A to 40 CFR Part 127 as adopted by reference in 9VAC25-31-1030. These NPDES data groups have similar regulatory reporting requirements and have similar data sources.

"Minimum set of NPDES data" means the data and information listed in Appendix A to 40 CFR Part 127 as adopted by reference in 9VAC25-31-1030.

"Program reports" means the information reported by VPDES-regulated entities and listed in Table 1 of Appendix A to 40 CFR Part 127 as adopted by reference in 9VAC25-31-1030, except NPDES Data Groups 1, 2, and 3.

"VPDES-regulated entity" means any entity regulated by the VPDES Program in accordance with this chapter or 9VAC25-870 9VAC25-875.

9VAC25-31-970. Types of data to be reported electronically by VPDES permittees, facilities, and entities subject to this part.

A. VPDES-regulated entities must electronically submit the minimum set of NPDES data for these reports if such reporting requirements are applicable. The following reports are the source of the minimum set of data from regulated entities:

1. Discharge Monitoring Report (9VAC25-31-190 and 9VAC25-870-430 9VAC25-875-1000);

2. Concentrated Animal Feeding Operation (CAFO) Annual Program Report (9VAC25-31-200);

3. Pretreatment Program Annual Report (9VAC25-31-840);

4. Sewer Overflow and Bypass Incident Event Report (9VAC25-31-190 and 9VAC25-870-430 9VAC25-875-1000);

5. CWA § 316(b) Annual Reports (9VAC25-31-165); and

6. Municipal Separate Storm Sewer System (MS4) Program Reports (9VAC25-870-400 9VAC25-875-970 and 9VAC25-870-440 9VAC25-875-1010).

B. Facilities or entities seeking coverage under or termination from general permits and facilities or entities submitting stormwater certifications or waivers from VPDES permit requirements must electronically submit the minimum set of NPDES data for the following notices, certifications, and waivers if such reporting requirements are applicable:

1. Notice of intent (NOI) to discharge by facilities seeking coverage under a general VPDES permit rather than an individual VPDES permit, as described in 9VAC25-31-170 B 2 and 9VAC25-870-410 9VAC25-875-980;

2. Notice of termination (NOT), as described in 9VAC25-31-410 and 9VAC25-870-650 9VAC25-875-1250;

3. No exposure certification (NOE), as described in 9VAC25-31-120 E 1 c; and

4. Certification in support of waiver for stormwater discharge associated with small construction activity, as described in 9VAC25-870-10 9VAC25-875-20.

C. Industrial users located in municipalities without approved local pretreatment programs must electronically submit the minimum set of NPDES data for the following self-monitoring reports if such reporting requirements are applicable:

1. Periodic reports on continued compliance, as described in 9VAC25-31-840 E; and

2. Reporting requirements for industrial users not subject to categorical pretreatment standards, as described in 9VAC25-31-840 H.

D. The minimum set of NPDES data for VPDES-regulated facilities is identified in Appendix A to 40 CFR Part 127 as adopted by reference in 9VAC25-31-1030.

9VAC25-31-980. Signature and certification standards for electronic reporting.

The signatory and certification requirements identified in 40 CFR Part 3 (including, in all cases, 40 CFR Part 3 Subpart D), 9VAC25-31-110 or 9VAC25-870-370 9VAC25-875-940 as appropriate, and 9VAC25-31-840 L shall also apply to electronic submissions of information by VPDES permittees, facilities, and entities subject to this part.

9VAC25-31-1010. Waivers from electronic reporting.

A. VPDES permittees, facilities, and entities subject to this part must electronically submit the minimum set of NPDES data in compliance with this part, 40 CFR Part 3 (including, in all cases, 40 CFR Part 3 Subpart D), 9VAC25-31-110 or 9VAC25-870-370 9VAC25-875-940 as appropriate, and 9VAC25-31-840 L unless a waiver is granted in compliance with this section.

B. Temporary waivers from electronic reporting may be granted by the department for programs for which the department has received authorization to implement the NPDES program, in compliance with this section, to VPDES permittees, facilities, and entities subject to this part (see 9VAC25-31-950 A).

1. Each temporary waiver must not extend beyond five years. However, VPDES-regulated entities may reapply for a temporary waiver. It is the duty of the owner, operator, or duly authorized representative of the VPDES permittee, facility, and entity subject to this part to reapply for a new temporary waiver. The department cannot grant a temporary waiver to a VPDES-regulated entity without first receiving a temporary waiver request from the VPDES-regulated entity.

2. To apply for a temporary waiver, the owner, operator, or duly authorized representative of the VPDES permittee, facility, and entity subject to this part must submit the following information to their authorized VPDES program:

a. Facility name;

b. VPDES permit number (if applicable);

c. Facility address;

d. Name, address, and contact information for the owner, operator, or duly authorized facility representative;

e. Brief written statement regarding the basis for claiming such a temporary waiver; and

f. Any other information required by the department.

3. The department will determine whether to grant a temporary waiver. The department shall provide notice to the owner, operator, or duly authorized facility representative submitting a temporary waiver request in compliance with the requirements of subsection E of this section.

4. VPDES permittees, facilities, and entities subject to this part (see 9VAC25-31-950 A) that have received a temporary waiver must continue to provide the minimum set of NPDES data (as well as other required information in compliance with statutes, regulations, the VPDES permit, another control mechanism, or an enforcement order) in hard-copy format to the department. The department shall electronically transfer these data to EPA in accordance with 40 CFR Part 127 Subpart C.

5. An approved temporary waiver is not transferrable.

C. Permanent waivers from electronic reporting may be granted by the department for programs for which the department has received authorization to implement the NPDES program, in compliance with this section, to VPDES permittees, facilities, and entities subject to this part (see 9VAC25-31-950 A).

1. Permanent waivers are only available to facilities and entities owned or operated by members of religious communities that choose not to use certain modern technologies (e.g., computers, electricity). The department cannot grant a permanent waiver to a VPDES-regulated entity without first receiving a permanent waiver request from the VPDES-regulated entity.

2. To apply for a permanent waiver, the owner, operator, or duly authorized representative of the VPDES permittee, facility, and entity subject to this part must submit the information listed in subdivision B 2 of this section to the department.

3. An approved permanent waiver is not transferrable.

4. VPDES permittees, facilities, and entities subject to this part (see 9VAC25-31-950 A) that have received a permanent waiver shall continue to provide the minimum set of NPDES data (as well as other required information in compliance with statutes, regulations, the VPDES permit, another control mechanism, or an enforcement order) in hard-copy format to the department. The department shall electronically transfer these data to EPA in accordance with 40 CFR Part 127 Subpart C.

D. Episodic waivers from electronic reporting may be granted by the department for programs for which the department has received authorization to implement the NPDES program, in compliance with this section, to VPDES permittees, facilities, and entities subject to this part (see 9VAC25-31-950 A). The following conditions apply to episodic waivers.

1. No waiver request from the VPDES permittee, facility, or entity is required to obtain an episodic waiver from electronic reporting.

2. Episodic waivers are not transferrable.

3. Episodic waivers cannot last more than 60 days.

4. The department will decide if the episodic waiver provision allows facilities and entities to delay their electronic submissions or to send hard-copy (paper) submissions. Episodic waivers are only available to facilities and entities in the following circumstances:

a. Large scale emergencies involving catastrophic circumstances beyond the control of the facilities, such as forces of nature (e.g., hurricanes, floods, fires, earthquakes) or other national disasters. The department will make the determination if an episodic waiver is warranted in this case and must receive the hard-copy (paper) submissions.

b. Prolonged electronic reporting system outages (i.e., outages longer than 96 hours). The department, will make the determination if an episodic waiver is warranted in this case and must receive the hard-copy (paper) submissions.

E. Responsibilities regarding review of waiver requests from VPDES permittees, facilities, and entities subject to this part (see 9VAC25-31-950 A).

1. Under this section, a VPDES permittee, facility, or entity subject to this part (see 9VAC25-31-950 A) may seek a waiver from electronic reporting. The department shall review the temporary or permanent waiver requests that it receives and either approve or reject these requests within 120 days.

2. The department shall provide the permittee, facility, or entity with notice of the approval or rejection of their temporary or permanent waiver request from electronic reporting.

3. The department shall electronically transfer to EPA the minimum set of NPDES data as specified in Appendix A of 40 CFR Part 127, as adopted by reference in 9VAC25-31-1030, that they receive from permittees, facilities, or entities with a waiver from electronic reporting in accordance with 40 CFR 127.23.

4. Under subsection D of this section, episodic waivers from electronic reporting may be granted by the department to VPDES permittees, facilities, and entities. The department granting an episodic waiver must provide notice, individually or through means of mass communication, regarding when such an episodic waiver is available, the facilities and entities that may use the episodic waiver, the likely duration of the episodic waiver, and any other directions regarding how facilities and entities should provide the minimum set of NPDES data, as well as other required information in compliance with statutes, regulations, the VPDES permit, another control mechanism, or an enforcement order, to the department. No waiver request from the VPDES permittee, facility, or entity is required to obtain an episodic waiver from electronic reporting. The department granting the episodic waiver will determine whether to allow facilities and entities to delay their electronic submissions for a short time (i.e., no more than 40 days) or to send hard-copy (paper) submissions.

9VAC25-31-1020. Implementation of electronic reporting requirements for VPDES permittees, facilities, and entities subject to this part.

A. VPDES permittees, facilities, and entities subject to this part, with the exception of those covered by waivers under 9VAC25-31-1010, must electronically submit the following VPDES information (reports, notices, waivers, and certifications) after the start dates listed in Table 1 of this subsection. This part is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of this part, the permittee may be required to report electronically if specified by a particular permit or if required to do so by state law.

Table 1—Start Dates for Electronic Submissions of VPDES Information

VPDES information

Start dates for electronic submissions

General Permit Reports

Notices of Intent to discharge (NOIs) (9VAC25-31-170 B 2 and 9VAC25-870-410 9VAC25-875-980)

Start date will be provided in a schedule approved by the department.

Notices of Termination (NOTs) (9VAC25-31-410 and 9VAC25-870-650 9VAC25-875-1250)

Start date will be provided in a schedule approved by the department.

No Exposure Certifications (NOEs) (9VAC25-31-120 E 1 c)

Start date will be provided in a schedule approved by the department.

Certifications in support of waiver for stormwater discharge associated with small construction activity (9VAC25-870-10 9VAC25-875-20)

Start date will be provided in a schedule approved by the department.

Discharge Monitoring Reports (9VAC25-31-190 L 4 and 9VAC25-870-430 L 4 9VAC25-875-1000 L 4, as applicable)

Individual VPDES Permit - Major Facility (9VAC25-31)

January 26, 2018

Individual VPDES Permit - Minor Facility (9VAC25-31)

January 26, 2018

Watershed General VPDES Permit - Nutrient Discharges (9VAC25-820)

March 26, 2018

General VPDES Permit - Industrial Stormwater Discharges (9VAC25-151)

July 26, 2018

All Other General VPDES Permits

Start dates will be provided in a schedule approved by the department.

Concentrated Animal Feeding Operation (CAFO) Annual Program Reports (9VAC25-31-200 E 4)

Start date will be provided in a schedule approved by the department.

Municipal Separate Storm Sewer System (MS4) Program Reports (9VAC25-870-400 D 7 c 9VAC25-875-970 D 7 and 9VAC25-870-440 9VAC25-875-1010)

Start date will be provided in a schedule approved by the department.

POTW Pretreatment Program Annual Reports (9VAC25-31-840 I)

Start date will be provided in a schedule approved by the department.

Significant Industrial User Compliance Reports in Municipalities Without Approved Pretreatment Programs (9VAC25-31-840 E and H)

Start date will be provided in a schedule approved by the department.

Sewer Overflow or Bypass Event Reports (9VAC25-31-190 L and M and 9VAC25-870-430 L and M 9VAC25-875-1000 M and N)

Start date will be provided in a schedule approved by the department.

CWA 316(b) Annual Reports (9VAC25-31-165 B 6 b)

Start date will be provided in a schedule approved by the department.

B. VPDES permittees, facilities, and entities subject to this part shall electronically submit the information listed in Table 1 of this section in compliance with this part and 40 CFR Part 3 (including, in all cases, 40 CFR Part 3 Subpart D), 9VAC25-31-110 or 9VAC25-870-370 9VAC25-875-940 as appropriate, and 9VAC25-31-840 L.

C. The department shall be the initial recipient as defined in 40 CFR 127.2(b) and as identified by EPA in 81 FR 62395 (September 9, 2016). VPDES permittees, facilities, and entities subject to this part shall electronically submit the information listed in Table 1 in this section to the department.

D. VPDES permittees, facilities, and entities subject to this part that have received a waiver from electronic reporting shall continue to provide the minimum set of NPDES data (as well as other required information in compliance with statutes, regulations, the VPDES permit, another control mechanism, or an enforcement order) to the department in accordance with 9VAC25-31-1010.

9VAC25-31-1030. Adoption by reference of Appendix A to 40 CFR Part 127—Minimum Set of NPDES Data.

A. Except as otherwise provided, the regulations of the U.S. Environmental Protection Agency set forth in Appendix A to 40 CFR Part 127 are hereby incorporated as part of this chapter and 9VAC25-870 9VAC25-875.

B. In all locations in this chapter and 9VAC25-870 9VAC25-875 where Appendix A to 40 CFR Part 127 is incorporated by reference, the following additions, modifications, and exceptions shall amend the incorporated text for the purpose of its incorporation into these regulations:

1. The department shall be the initial recipient as defined in 40 CFR 127.2(b) and as identified by EPA in 81 FR 62395 (September 9, 2016). The department will be the initial recipient for all NPDES data groups except for the sewage sludge/biosolids annual program reports (40 CFR Part 503) as Virginia is not authorized for the federal biosolids NPDES program.

2. NPDES-regulated entity shall be the same as VPDES-regulated entity.

3. The authorized NPDES program shall be the department for those NPDES program components for which EPA has granted the state authorization.

9VAC25-115-50. General permit.

Any owner whose registration statement is accepted by the board shall comply with the requirements of the general permit and be subject to all requirements of 9VAC25-31-170 of the VPDES Permit Regulation.

General Permit No.: VAG52
Effective Date: July 24, 2021
Expiration Date: June 30, 2026

GENERAL PERMIT FOR SEAFOOD PROCESSING FACILITIES

AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM AND THE VIRGINIA STATE WATER CONTROL LAW

In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the State Water Control Law and regulations adopted pursuant to it, owners of seafood processing facilities, other than mechanized clam processing facilities, are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in board regulations that prohibit such discharges.

The authorized discharge shall be in accordance with the information submitted with the registration statement, this cover page, Part I-Effluent Limitations and Monitoring Requirements, Special Conditions, Part II-Stormwater Pollution Prevention Plans and Part III-Conditions Applicable to All VPDES Permits, as set forth in this general permit.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

1. SEAFOOD PROCESSING NOT LIMITED ELSEWHERE IN PART I. A.— SIC 2091, 2092, 5142 AND 5146 SOURCES EXCEPT MECHANIZED CLAM FACILITIES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from seafood processing not otherwise classified from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/YEAR

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/YEAR

Grab

TSS

NL

NL

NA

NA

NA

1/YEAR

Composite

Oil and Grease

NL

NL

NA

NA

NA

1/YEAR

Grab

Production

NA

NL

NA

NA

NA

1/YEAR

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by the end of the calendar year and reported by the 10th of January of the following calendar year on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

2. CONVENTIONAL (HANDPICKED) BLUE CRAB PROCESSING—EXISTING SOURCES PROCESSING MORE THAN 3,000 POUNDS OF RAW MATERIAL PER DAY ON ANY DAY

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from conventional blue crab processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

0.74

2.2

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.20

0.60

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

3. CONVENTIONAL (HANDPICKED) BLUE CRAB PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from conventional blue crab processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

0.15

0.30

NA

1/3 Months

Composite

TSS

NL

NL

0.45

0.90

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.065

0.13

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

4. MECHANIZED BLUE CRAB PROCESSING—ALL EXISTING SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from mechanized blue crab processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

12

36

NA

1/3 Months

Composite

Oil and Grease

NL

NL

4.2

13

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

5. MECHANIZED BLUE CRAB PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from mechanized blue crab processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

2.5

5.0

NA

1/3 Months

Composite

TSS

NL

NL

6.3

13

NA

1/3 Months

Composite

Oil and Grease

NL

NL

1.3

2.6

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

6. NON-BREADED SHRIMP PROCESSING—EXISTING SOURCES PROCESSING MORE THAN 2,000 POUNDS OF RAW MATERIAL PER DAY ON ANY DAY

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from non-breaded shrimp processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

38

110

NA

1/3 Months

Composite

Oil and Grease

NL

NL

12

36

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

7. NON-BREADED SHRIMP PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from non-breaded shrimp processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

25

63

NA

1/3 Months

Composite

TSS

NL

NL

10

25

NA

1/3 Months

Composite

Oil and Grease

NL

NL

1.6

4.0

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

8. BREADED SHRIMP PROCESSING—EXISTING SOURCES PROCESSING MORE THAN 2,000 POUNDS OF RAW MATERIAL PER DAY ON ANY DAY

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from breaded shrimp processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

93

280

NA

1/3 Months

Composite

Oil and Grease

NL

NL

12

36

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

9. BREADED SHRIMP PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from breaded shrimp processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

40

100

NA

1/3 Months

Composite

TSS

NL

NL

22

55

NA

1/3 Months

Composite

Oil and Grease

NL

NL

1.5

3.8

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

10. TUNA PROCESSING—ALL EXISTING SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from tuna processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

3.3

8.3

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.84

2.1

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

11. TUNA PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from tuna processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

8.1

20

NA

1/3 Months

Composite

TSS

NL

NL

3.0

7.5

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.76

1.9

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

12. CONVENTIONAL BOTTOM FISH PROCESSING—EXISTING SOURCES PROCESSING MORE THAN 4,000 POUNDS OF RAW MATERIAL PER DAY ON ANY DAY

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from conventional bottom fish processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

2.0

3.6

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.55

1.0

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

13. CONVENTIONAL BOTTOM FISH PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from conventional bottom fish processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

0.71

1.2

NA

1/3 Months

Composite

TSS

NL

NL

0.73

1.5

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.042

0.077

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

14. MECHANIZED BOTTOM FISH PROCESSING—ALL EXISTING SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from mechanized bottom fish processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

12

22

NA

1/3 Months

Composite

Oil and Grease

NL

NL

3.9

9.9

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

15. MECHANIZED BOTTOM FISH PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from mechanized bottom fish processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

7.5

13

NA

1/3 Months

Composite

TSS

NL

NL

2.9

5.3

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.47

1.2

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

16. HAND-SHUCKED CLAM PROCESSING—EXISTING SOURCES PROCESSING MORE THAN 4,000 POUNDS OF RAW MATERIAL PER DAY ON ANY DAY

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from hand-shucked clam processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

18

59

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.23

0.60

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

17. HAND-SHUCKED CLAM PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from hand-shucked clam processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

17

55

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.21

0.56

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

18. HAND-SHUCKED OYSTER PROCESSING—EXISTING SOURCES PROCESSING MORE THAN 1,000 POUNDS OF RAW MATERIAL PER DAY ON ANY DAY

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from hand-shucked oyster processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

16

23

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.77

1.1

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Raw material = The weight of oyster meat after shucking.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

19. HAND-SHUCKED OYSTER PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from hand-shucked oyster processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

16

23

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.77

1.1

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

20. STEAMED AND CANNED OYSTER PROCESSING—ALL EXISTING SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from mechanized oyster processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

190

270

NA

1/3 Months

Composite

Oil and Grease

NL

NL

1.7

2.3

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

21. STEAMED AND CANNED OYSTER PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from mechanized oyster processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

17

67

NA

1/3 Months

Composite

TSS

NL

NL

39

56

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.42

0.84

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

22. SCALLOP PROCESSING—ALL EXISTING SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from scallop processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

1.4

5.7

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.23

7.3

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

23. SCALLOP PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from scallop processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

1.4

5.7

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.23

7.3

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

24. FARM-RAISED CATFISH PROCESSING—EXISTING SOURCES PROCESSING MORE THAN 3,000 POUNDS OF RAW MATERIAL PER DAY ON ANY DAY

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from farm-raised catfish processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

9.2

28

NA

1/3 Months

Composite

Oil and Grease

NL

NL

3.4

10

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

25. FARM-RAISED CATFISH PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from farm-raised catfish processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

2.3

4.6

NA

1/3 Months

Composite

TSS

NL

NL

5.7

11

NA

1/3 Months

Composite

Oil and Grease

NL

NL

0.45

0.90

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

26. HERRING PROCESSING—ALL

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from herring processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

TSS

NL

NL

24

32

NA

1/3 Months

Composite

Oil and Grease

NL

NL

10

27

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

Part I

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

27. HERRING PROCESSING—ALL NEW SOURCES

During the period beginning with the permittee's coverage under this general permit and lasting until the permit's expiration date, the permittee is authorized to discharge wastewater from herring processing, from outfall(s) __________.

Such discharges shall be limited and monitored by the permittee as specified below:

EFFLUENT CHARACTERISTICS

MONITORING REQUIREMENTS kg/day

DISCHARGE LIMITATIONS kg/kkg

Sample Frequency

Sample Type

Monthly Avg

Daily Max

Monthly Avg

Daily Max

Daily Min

Flow (MGD)

NA

NL

NA

NA

NA

1/3 Months

Estimate

pH (S.U.)

NA

NA

NA

9.0

6.0

1/3 Months

Grab

BOD5

NL

NL

15

16

NA

1/3 Months

Composite

TSS

NL

NL

5.2

7.0

NA

1/3 Months

Composite

Oil and Grease

NL

NL

1.1

2.9

NA

1/3 Months

Grab

Production

NA

NL

NA

NA

NA

1/3 Months

Measurement

NL = No limitation, monitoring required.

NA = Not applicable.

Grab = Individual grab sample is to be taken in the middle of a composite sampling period.

Composite = Hourly grab samples taken over the duration of a processing cycle (including cleanup) combined to form one representative sample, not to exceed eight grab samples.

Production = See Special Condition No. 5 (Part I B 5).

Samples shall be collected by March 31, June 30, September 30, and December 31 and reported by the 10th of the following month on the facility's Discharge Monitoring Report (DMR). All calculations shall be submitted with the DMR.

B. SPECIAL CONDITIONS APPLYING TO PART I A 1 THROUGH PART I A 27.

1. No sewage shall be discharged from a point source to surface waters at this facility except under the provisions of another VPDES permit specifically issued for that purpose.

2. There shall be no chemicals added to the water or waste to be discharged, other than those listed on the owner's accepted registration statement.

3. Wastewater should be reused or recycled to the maximum extent practicable.

4. The permittee shall comply with the following solids management plan:

a. There shall be no discharge of floating solids or visible foam in other than trace amounts.

b. All floors, machinery, conveyor belts, dock areas, etc. shall be dry swept or dry brushed prior to washdown.

c. All settling basins shall be cleaned frequently in order to achieve effective settling.

d. All solids resulting from the seafood processes covered under this general permit, other than oyster, clam, or scallop shells, shall be handled, stored, and disposed of so as to prevent a discharge to state waters of such solids or industrial wastes or other wastes from those solids.

e. The permittee shall install and properly maintain wastewater treatment necessary in order to remove organic solids present in the wastewater that may settle and accumulate on the substrate of the receiving waters in other than trace amounts.

f. All employees shall receive training relative to preventive measures to be taken to control the release of solids from the facility into surface waters.

5. Production to be reported and used in calculating effluent discharge levels in terms of kg/kkg shall be the weight in kilograms of raw material processed, in the form in which it is received at the processing plant, on the day of effluent sampling, except for the hand-shucked oyster, steamed and canned oyster, and scallop processing subcategories, for which production shall mean the weight of oyster or scallop meat after processing. The effluent levels in terms of kg/kkg shall be calculated by dividing the measured pollutant load in kg/day by the production level in kkg (thousands of kilograms).

6. The permittee shall notify the department as soon as they know or have reason to believe:

a. That any activity has occurred or will occur that would result in the discharge on a routine or frequent basis of any toxic pollutant that is not limited in the permit, if that discharge will exceed the highest of the following notification levels:

(1) One hundred micrograms per liter (100 μg/l) of the toxic pollutant;

(2) Two hundred micrograms per liter (200 μg/l) for acrolein and acrylonitrile; five hundred micrograms per liter (500 μg/l) for 2,4-dinitrophenol and for 2-methyl-4,6-dinitrophenol; and one milligram per liter (1 mg/l) for antimony;

(3) Five times the maximum concentration value reported for that pollutant in the permit application; or

(4) The level established by the board.

b. That any activity has occurred or will occur that would result in any discharge on a nonroutine or infrequent basis of a toxic pollutant that is not limited in the permit if that discharge will exceed the highest of the following notification levels:

(1) Five hundred micrograms per liter (500 μg/l) of the toxic pollutant;

(2) One milligram per liter (1 mg/l) for antimony;

(3) Ten times the maximum concentration value reported for that pollutant in the permit application; or

(4) The level established by the board.

7. Compliance reporting and recordkeeping under Part I A.

a. The quantification levels (QL) shall be less than or equal to the following concentrations:

Effluent Parameter

Quantification Level

BOD

2 mg/l

TSS

1.0 mg/l

Oil and Grease

5.0 mg/l

The QL is defined as the lowest concentration used to calibrate a measurement system in accordance with the procedures published for the test method.

b. Recording results. Any concentration below the QL used in the analysis shall be recorded as "<QL" if it is less than the QL used in the analysis (the QL must be less than or equal to the QL in subdivision 7 a of this subsection. Otherwise the numerical value shall be recorded.

c. Monitoring results shall be recorded using the same number of significant digits as listed in the permit. Regardless of the rounding conventions used by the permittee (e.g., five always rounding up or to the nearest even number), the permittee shall use the convention consistently, and shall ensure that consulting laboratories employed by the permittee use the same convention.

8. The discharges authorized by this permit shall be controlled as necessary to meet water quality standards in 9VAC25-260.

9. If a new process is added after coverage under the general permit is obtained, an amended registration statement must be submitted at least 60 days prior to commencing operation of the new process or a later submittal approved by the board.

10. Notice of termination.

a. The owner may terminate coverage under this general permit by filing a complete notice of termination. The notice of termination may be filed after one or more of the following conditions have been met:

(1) Operations have ceased at the facility and there are no longer discharges of process wastewater or stormwater associated with the industrial activity;

(2) A new owner has assumed responsibility for the facility. A notice of termination does not have to be submitted if a VPDES Change of Ownership Agreement Form has been submitted;

(3) All discharges associated with this facility have been covered by an individual VPDES permit or an alternative VPDES permit; or

(4) Termination of coverage is being requested for another reason, provided the board agrees that coverage under this general permit is no longer needed.

b. The notice of termination shall contain the following information:

(1) Owner's name, mailing address, telephone number, and email address (if available);

(2) Facility name and location;

(3) VPDES general permit registration number for the facility; and

(4) The basis for submitting the notice of termination, including:

(a) A statement indicating that a new owner has assumed responsibility for the facility;

(b) A statement indicating that operations have ceased at the facility, and there are no longer discharges from the facility;

(c) A statement indicating that all discharges have been covered by an individual VPDES permit or an alternative VPDES permit; or

(d) A statement indicating that termination of coverage is being requested for another reason (state the reason).

(5) The following certification: "I certify under penalty of law that all wastewater and stormwater discharges from the identified facility that are authorized by this VPDES general permit have been eliminated, or covered under a VPDES individual or alternative permit, or that I am no longer the owner of the facility, or permit coverage should be terminated for another reason listed above. I understand that by submitting this notice of termination, that I am no longer authorized to discharge seafood processing wastewater or, for facilities classified as SIC Code 2091 or 2092, stormwater associated with industrial activity in accordance with the general permit, and that discharging pollutants to surface waters is unlawful where the discharge is not authorized by a VPDES permit. I also understand that the submittal of this notice of termination does not release an owner from liability for any violations of this permit or the Clean Water Act."

c. The notice of termination shall be submitted to the department and signed in accordance with Part III K.

Part II
Stormwater Management

The following stormwater management requirements apply only to seafood processors classified as Standard Industrial Classifications (SIC) Codes 2091 and 2092.

A. Monitoring and inspections.

1. Quarterly visual monitoring of stormwater quality. The permittee shall perform and document visual monitoring of stormwater discharges associated with industrial activity from each outfall, except discharges waived in subdivision d of this subsection. The visual monitoring must be made during normal working hours, at least once in each of the following three-month periods: January through March, April through June, July through September, and October through December.

a. Samples will be in clean, colorless glass or plastic containers and examined in a well-lit area;

b. Samples will be collected within the first 30 minutes (or as soon thereafter as practical, but not to exceed three hours, provided that the permittee explains in the stormwater pollution prevention plan (SWPPP) why an examination during the first 30 minutes was impractical) of when the runoff or snowmelt begins discharging. All such samples shall be collected from the discharge resulting from a storm event that results in an actual discharge from the site (defined as a "measurable storm event") providing the interval from the preceding measurable storm event is at least 72 hours. The required 72-hour storm event interval is waived where the preceding measurable storm event did not result in a measurable discharge from the facility. The 72-hour storm event interval may also be waived where the permittee documents that less than a 72-hour interval is representative for local storm events during the season when sampling is being conducted.

c. The examination shall observe color, odor, clarity, floating solids, settled solids, suspended solids, foam, oil sheen, and other obvious indicators of stormwater pollution.

d. If no qualifying storm event resulted in discharge from the facility during a monitoring period, or adverse weather conditions create dangerous conditions for personnel during each measurable storm event during a monitoring period, visual monitoring is exempted provided this is documented in the SWPPP. Acceptable documentation includes dates and times the outfalls were viewed or sampling was attempted, national Climatic Data Center weather station data, local weather station data, facility rainfall logs, and other appropriate supporting data.

e. Representative outfalls – substantially identical stormwater discharges. If the facility has two or more outfalls that discharge substantially identical stormwater effluents, based on similarities of the industrial activities, significant materials, size of drainage areas, frequency of discharges, and stormwater management practices occurring within the drainage areas of the outfalls, the permittee may conduct quarterly visual monitoring on the stormwater discharges of just one representative outfall.

f. Visual monitoring reports shall be maintained on-site with the SWPPP. The report shall include:

(1) Outfall location;

(2) Monitoring date and time;

(3) Duration of storm event;

(4) Rainfall measurement or estimate (in inches) of the storm event that generated the discharge;

(5) Duration between the storm event sampled and the end of the previous measurable storm event;

(6) Monitoring personnel;

(7) Nature of the discharge (i.e., runoff or snow melt);

(8) Visual quality of the stormwater discharge, including observations of color, odor, clarity, floating solids, settled solids, suspended solids, foam, oil sheen, and other obvious indicators of stormwater pollution;

(9) Probable sources of any observed stormwater contamination;

(10) Why it was not possible to take the sample within the first 30 minutes (if applicable); and

(11) Documentation to support substantially identical outfalls (if applicable) required by Part II A 1 e.

g. Corrective action. Whenever the visual monitoring shows evidence of stormwater pollution, the SWPPP and stormwater control measures shall be updated per Part II B.

2. Routine facility inspections. Personnel who possess the knowledge and skills to assess conditions and activities that could impact stormwater quality at the facility and who can also evaluate the effectiveness of control measures shall regularly inspect all areas of the facility where industrial materials or activities are exposed to stormwater.

a. Inspections include loading and unloading areas, storage areas, including associated containment areas, waste management units, vents and stacks emanating from industrial activities, spoiled product and broken product container hold areas, animal holding pens, staging areas, air pollution control equipment, areas where spills or leaks have occurred in the past three years, discharge points, and control measures.

b. At least one member of the pollution prevention team shall participate in the routine facility inspections.

c. The inspection frequency shall be specified in the SWPPP based upon a consideration of the level of industrial activity at the facility but shall be at a minimum of once per calendar quarter unless written approval is received from the department for less frequent intervals. Inspections shall be performed during operating hours. At least once each calendar year, the routine facility inspection shall be conducted during a period when a stormwater discharge is occurring.

d. Any deficiencies in the implementation of the SWPPP that are found shall be corrected as soon as practicable, but not later than within 60 days of the inspection, unless permission for a later date is granted in writing by the director. The results of the inspections shall be documented in the SWPPP and shall include at a minimum:

(1) The inspection date;

(2) The names of the inspectors;

(3) Weather information and a description of any discharges occurring at the time of the inspection;

(4) Any previously unidentified discharges of pollutants from the site;

(5) Any control measures needing maintenance or repairs;

(6) Any failed control measures that need replacement;

(7) Any incidents of noncompliance observed; and

(8) Any additional control measures needed to comply with the permit requirements.

e. Corrective action. Whenever the routine inspection shows evidence of stormwater pollution, the SWPPP and stormwater control measures shall be updated per Part II B.

f. The requirement for routine facility inspections is waived for facilities that have maintained an active VEEP E3/E4 status.

3. Nonstormwater discharges.

a. Allowable nonstormwater discharges. Discharges of certain sources of nonstormwater listed in Part II A 3 c are allowable discharges under this permit. All other nonstormwater discharges are not authorized and shall be either eliminated, covered under this permit, or covered under a separate VPDES permit.

b. Annual outfall inspection for unauthorized discharges. The SWPPP shall include documentation that all stormwater outfalls associated with industrial activity have been evaluated annually for the presence of unauthorized discharges. The documentation shall include:

(1) The date of the evaluation;

(2) A description of the evaluation criteria used;

(3) A list of the outfalls or on-site drainage points that were directly observed during the evaluation;

(4) A description of the results of the evaluation for the presence of unauthorized discharges; and

(5) The actions taken to eliminate unauthorized discharges if any were identified.

c. The following nonstormwater discharges are authorized by this permit:

(1) Discharges from emergency firefighting activities;

(2) Fire hydrant flushing, managed in a manner to avoid an instream impact;

(3) Potable water, including water line flushing, managed in a manner to avoid an instream impact;

(4) Uncontaminated condensate from air conditioners, coolers, and other compressors and from the outside storage of refrigerated gases or liquids;

(5) Irrigation drainage;

(6) Landscape watering provided all pesticides, herbicides, and fertilizers have been applied in accordance with the approved labeling;

(7) Pavement wash waters where no detergents or hazardous cleaning products are used and no spills or leaks of toxic or hazardous materials have occurred, unless all spilled material has been removed. Pavement wash waters shall be managed in a manner to avoid an instream impact;

(8) Routine external building washdown that does not use detergents or hazardous cleaning products;

(9) Uncontaminated groundwater or spring water;

(10) Foundation or footing drains where flows are not contaminated with process materials; and

(11) Incidental windblown mist from cooling towers that collects on rooftops or adjacent portions of the facility, but not intentional discharges from the cooling tower (e.g., "piped" cooling tower blowdown or drains).

B. Corrective actions. The permittee shall take corrective action whenever:

1. Routine facility inspections, visual monitoring, inspections by local, state, or federal officials, or any other process, observation, or event result in a determination that modifications to the stormwater control measures are necessary to meet the permit requirements;

2. The department determines, or the permittee becomes aware, that the stormwater control measures are not stringent enough for the discharge to meet applicable water quality standards.

3. The permittee shall review the SWPPP and modify it as necessary to address any deficiencies. Revisions to the SWPPP shall be completed within 60 days following the discovery of the deficiency. When control measures need to be modified or added, implementation shall be completed before the next anticipated storm event if possible, but no later than 60 days after the deficiency is discovered, or as otherwise provided or approved by the department. In cases where construction is necessary to implement control measures, the permittee shall include a schedule in the SWPPP that provides for the completion of the control measures as expeditiously as practicable, but no later than three years after the deficiency is discovered. Where a construction compliance schedule is included in the SWPPP, the SWPPP shall include appropriate nonstructural and temporary controls to be implemented in the affected portion of the facility prior to completion of the permanent control measure. The amount of time taken to modify a control measure or implement additional control measures shall be documented in the SWPPP.

4. Any corrective actions taken shall be documented and retained with the SWPPP. Reports of corrective actions shall be signed in accordance with Part III K.

C. Stormwater pollution prevention plans (SWPPPs). An SWPPP shall be developed and implemented for the facility covered by this permit, which has stormwater discharges associated with industrial activity and is classified under SIC Code 2091 or 2092. The SWPPP is intended to document the selection, design, and installation of control measures, including BMPs, to minimize the pollutants in all stormwater discharges from the facility and to meet applicable effluent limitations and water quality standards.

The SWPPP requirements of this general permit may be fulfilled, in part, by incorporating by reference other plans or documents such as an erosion and sediment control (ESC) plan, a spill prevention control and countermeasure (SPCC) plan developed for the facility under § 311 of the Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the plan requirements of Part II C 2 (Contents of the SWPPP). If an ESC plan is being incorporated by reference, it shall have been approved by the locality in which the activity is to occur or by another appropriate plan approving authority authorized under the Virginia Erosion and Sediment Control Regulations, 9VAC25-840 Stormwater Management Regulation (9VAC25-875). All plans incorporated by reference into the SWPPP become enforceable under this permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP of Part III C 2, the permittee shall develop the missing SWPPP elements and include them in the required plan.

1. Deadlines for SWPPP preparation and compliance.

a. Owners of facilities that were covered under the 2016 Seafood Processing Facilities General Permit who are continuing coverage under this general permit shall update and implement any revisions to the SWPPP within 60 days of the board granting coverage under this permit.

b. Owners of new facilities, facilities previously covered by an expiring individual permit, and existing facilities not currently covered by a VPDES permit that elect to be covered under this general permit shall prepare and implement the SWPPP within 60 days of the board granting coverage under this permit.

c. Where the owner of an existing facility that is covered by this permit changes, the new owner of the facility must update and implement any revisions to the SWPPP within 60 days of the ownership change.

d. Upon a showing of good cause, the director may establish a later date in writing for preparation of and compliance with the SWPPP.

2. Contents of the SWPPP. The contents of the SWPPP shall include, at a minimum, the following items:

a. Pollution prevention team. The SWPPP shall identify the staff individuals by name or title who comprise the facility's stormwater pollution prevention team. The pollution prevention team is responsible for assisting the facility or plant manager in developing, implementing, maintaining, revising, and ensuring compliance with the facility's SWPPP. Specific responsibilities of each staff individual on the team shall be identified and listed.

b. Site description. The SWPPP shall include the following:

(1) A description of the nature of the industrial activities at the facility.

(2) Site map. A site map identifying the following:

(a) The boundaries of the property and the size of the property in acres;

(b) The location and extent of significant structures and impervious surfaces;

(c) Locations of all stormwater conveyances, including ditches, pipes, swales, and inlets, and the directions of stormwater flow, using arrows to indicate which direction stormwater will flow;

(d) Locations of stormwater control measures, including BMPs;

(e) Locations of all water bodies receiving discharges from the site, including wetlands;

(f) Locations of identified potential pollutant sources identified in Part II C 2 c;

(g) Locations where significant spills or leaks identified under Part II C 2 c (3) have occurred;

(h) Locations of stormwater outfalls, monitoring locations, an approximate outline of the area draining to each outfall, the drainage area of each outfall in acres, the longitude and latitude of each outfall, the location of any municipal separate storm sewer system (MS4) conveyance receiving discharge from the facility, and each outfall identified with a unique numerical identification codes. For example: Outfall Number 001, Outfall Number 002, etc.;

(i) Location and description of all nonstormwater discharges;

(j) Location of any storage piles containing salt;

(k) Location and source of suspected run-on to the site from an adjacent property if the run-on is suspected of containing significant quantities of pollutants; and

(l) Locations of vents and stacks from cooking, drying, and similar operations; dry product vacuum transfer lines; animal holding pens; spoiled product; and broken product container storage area if exposed to precipitation or runoff.

c. Summary of potential pollutant sources. The SWPPP shall identify each separate area at the facility where industrial materials or activities are exposed to stormwater. Industrial materials or activities include material handling equipment or activities, industrial machinery, raw materials, industrial production and processes, intermediate products, byproducts, final products, waste products, and application and storage of pest control chemicals used on facility grounds. Material handling activities include the storage, loading and unloading, transportation, disposal, or conveyance of any raw material, intermediate product, final product or waste product. For each separate area identified, the description shall include:

(1) Activities in area. A list of the industrial activities exposed to stormwater;

(2) Pollutants. A list of the pollutants, pollutant constituents, or industrial chemicals associated with each industrial activity that could potentially be exposed to stormwater. The pollutant list shall include all significant materials handled, treated, stored, or disposed that have been exposed to stormwater in the three years prior to the date the SWPPP was prepared or amended. The list shall include any hazardous substances or oil at the facility.

(3) Spills and leaks. The SWPPP shall clearly identify areas where potential spills and leaks that can contribute pollutants to stormwater discharges can occur and their corresponding outfalls. The SWPPP shall include a list of significant spills and leaks of toxic or hazardous pollutants that actually occurred at exposed areas, or that drained to a stormwater conveyance during the three-year period prior to the date this SWPPP was prepared or amended. The list shall be updated within 60 days of the incident if significant spills or leaks occur in exposed areas of the facility during the term of the permit.

d. Control measure considerations. Control measures shall be implemented for all the areas identified in Part II C 2 c (Summary of potential pollutant sources) to prevent or control pollutants in stormwater discharges from the facility. If applicable, regulated stormwater discharges from the facility include stormwater run-on that commingles with stormwater discharges associated with industrial activity at the facility. The SWPPP shall describe the type, location, and implementation of all control measures for each area where industrial materials or activities are exposed to stormwater. Selection of control measures shall take into consideration:

(1) That preventing stormwater from coming into contact with polluting materials is generally more effective, and less costly, than trying to remove pollutants from stormwater;

(2) Control measures generally must be used in combination with each other for most effective water quality protection;

(3) Assessing the type and quantity of pollutants, including their potential to impact receiving water quality, is critical to designing effective control measures;

(4) That minimizing impervious areas at the facility can reduce runoff and improve groundwater recharge and stream base flows in local streams (however, care must be taken to avoid groundwater contamination);

(5) Flow attenuation by use of open vegetated swales and natural depressions can reduce instream impacts of erosive flows;

(6) Conservation or restoration of riparian buffers will help protect streams from stormwater runoff and improve water quality; and

(7) Treatment interceptors (e.g., swirl separators and sand filters) may be appropriate in some instances to minimize the discharge of pollutants.

e. Control measures. The permittee shall implement the following types of control measures to prevent and control pollutants in the stormwater discharges from the facility, unless it can be demonstrated and documented that such controls are not relevant to the discharges.

(1) Good housekeeping. The permittee shall keep clean all exposed areas of the facility that are potential sources of pollutants to stormwater discharges. The permittee shall perform the following good housekeeping measures to minimize pollutant discharges:

(a) The SWPPP shall include a schedule for regular pickup and disposal of waste materials along with routine inspections for leaks and conditions of drums, tanks, and containers;

(b) Sweep or vacuum as feasible;

(c) Store materials in containers constructed of appropriate materials;

(d) Manage all waste containers to prevent a discharge of pollutants;

(e) Minimize the potential for waste, garbage, and floatable debris to be discharged by keeping areas exposed to stormwater free of such materials or by intercepting such materials prior to discharge; and

(f) Implement BMPs to eliminate stormwater discharges of plastics.

(2) Eliminating and minimizing exposure. To the extent practicable, manufacturing, processing, and material storage areas, including loading and unloading, storage, disposal, cleaning, maintenance, and fueling operations, shall be located inside, or protected by a storm-resistant covering to prevent exposure to rain, snow, snowmelt, and runoff. Unless infeasible, facilities shall implement the following:

(a) Use grading, berming, or curbing to prevent runoff of contaminated flows and divert run-on away from potential sources of pollutants;

(b) Locate materials, equipment, and activities so that potential leaks and spills are contained, or able to be contained, or diverted before discharge;

(c) Clean up spills and leaks immediately, upon discovery of the spills or leaks, using dry methods (e.g., absorbents) to prevent the discharge of pollutants;

(d) Store leaking vehicles and equipment indoors, or if stored outdoors, use drip pans and adsorbents;

(e) Utilize appropriate spill or overflow protections equipment;

(f) Perform all vehicle maintenance or equipment cleaning operations indoors, under cover, or in bermed areas that prevent runoff and run-on and also capture any overspray; and

(g) Drain fluids from equipment and vehicles that will be decommissioned, and for any equipment and vehicles that remain unused for extended periods of time, inspect at least monthly for leaks.

(3) Preventive maintenance. The SWPPP shall include preventive maintenance that includes a description of procedures and a regular schedule for inspection of the following:

(a) All control measures that includes a description of the back-up practices that are in place should a runoff event occur while a control measure is off line; and

(b) Testing, maintenance, and repairing of all industrial equipment and systems to avoid situations that could result in leaks, spills, and other releases of pollutants in stormwater discharged from the facility.

(4) Spill prevention and response procedures. The SWPPP shall describe the procedures that will be followed for preventing and responding to spills and leaks, including:

(a) Preventive measures, such as barriers between material storage and traffic areas, secondary containment provisions, and procedures for material storage and handling;

(b) Response procedures, including notification of appropriate facility personnel, emergency agencies, and regulatory agencies and procedures for stopping, containing, and cleaning up spills. Measures for cleaning up hazardous material spills or leaks shall be consistent with applicable the Resource Conservation and Recovery Act regulations at 40 CFR Part 264 and 40 CFR Part 265. Employees who may cause, detect, or respond to a spill or leak shall be trained in these procedures and have necessary spill response equipment available. If possible, one of these individuals shall be a member of the pollution prevention team;

(c) Procedures for plainly labeling containers (e.g., "used oil," "spent solvents," and "fertilizers and pesticides") that could be susceptible to spillage or leakage to encourage proper handling and facilitate rapid response if spills or leaks occur; and

(d) Contact information for individuals and agencies that must be notified in the event of a spill shall be included in the SWPPP and maintained in other locations where it will be readily available.

(5) Employee training. The permittee shall implement a stormwater employee training program for the facility. The SWPPP shall include a schedule for all training and shall document all training sessions and the employees who received the training. Training shall be provided at least annually for all employees who work in areas where industrial materials or activities are exposed to stormwater, and for employees who are responsible for implementing activities identified in the SWPPP (e.g., inspectors and maintenance personnel). The training shall cover the components and goals of the SWPPP and include such topics as spill response, good housekeeping, material management practices, BMP operation and maintenance and pest control. The SWPPP shall include a summary of any training performed.

(6) Sediment and erosion control. The SWPPP shall identify areas at the facility that, due to topography, land disturbance (e.g., construction, landscaping, site grading), or other factors, have a potential for soil erosion. The permittee shall identify and implement structural, vegetative, or stabilization control measures to prevent or control on-site and off-site erosion and sedimentation. Flow velocity dissipation devices shall be placed at discharge locations and along the length of any outfall channel if the flows would otherwise create erosive conditions.

(7) Management of runoff. The plan shall describe the stormwater runoff management practices (i.e., permanent structural control measures) for the facility. These types of control measures shall be used to divert, infiltrate, reuse, or otherwise reduce pollutants in stormwater discharges from the site.

Structural control measures may require a separate permit under § 404 of the federal Clean Water Act and the Virginia Water Protection Permit Program Regulation (9VAC25-210) before installation begins.

3. Signature and SWPPP review.

a. Signature and location. The SWPPP, including revisions to the SWPPP to document any corrective actions taken as required by Part II B, shall be signed in accordance with Part III K, dated, and retained on-site at the facility covered by this permit. All other changes to the SWPPP, and other permit compliance documentation, must be signed and dated by the person preparing the change or documentation.

b. Availability. The permittee shall retain a copy of the current SWPPP required by this permit at the facility, and it shall be immediately available to the department, EPA, or the operator of an MS4 receiving discharges from the site at the time of an on-site inspection or upon request.

c. Required modifications. The permittee shall modify the SWPPP whenever necessary to address all corrective actions required by Part II B. Changes to the SWPPP shall be made in accordance with the corrective action deadlines in Part II B and shall be signed and dated in accordance with Part III K. The director may notify the permittee at any time that the SWPPP, control measures, or other components of the facility's stormwater program do not meet one or more of the requirements of this permit. The notification shall identify specific provisions of the permit that are not being met and may include required modifications to the stormwater program, additional monitoring requirements, and special reporting requirements. The permittee shall make any required changes to the SWPPP within 60 days of receipt of such notification, unless permission for a later date is granted in writing by the director, and shall submit a written certification to the director that the requested changes have been made.

4. Maintaining an updated SWPPP. The permittee shall review and amend the SWPPP as appropriate whenever:

a. There is construction or a change in design, operation, or maintenance at the facility that has an effect on the discharge, or the potential for the discharge, of pollutants from the facility;

b. Routine inspections or visual monitoring determine that there are deficiencies in the control measures, including BMPs;

c. Inspections by local, state, or federal officials determine that modifications to the SWPPP are necessary;

d. There is a significant spill, leak or other release at the facility; or

e. There is an unauthorized discharge from the facility.

f. SWPPP modifications shall be made within 60 calendar days after the discovery, observation, or event requiring a SWPPP modification. Implementation of new or modified control measures shall be initiated before the next storm event if possible, but no later than 60 days after discovery, or as otherwise provided or approved by the director. The amount of time taken to modify a control measure or implement additional control measures shall be documented in the SWPPP.

g. If the SWPPP modification is based on a significant spill, leak, release, or unauthorized discharge, include a description and date of the incident, the circumstances leading to the incident, actions taken in response to the incident, and measures to prevent the recurrence of such releases. Unauthorized discharges are subject to the reporting requirements of Part III G of this permit.

Part III
Conditions Applicable to All VPDES Permits

A. Monitoring.

1. Samples and measurements taken as required by this permit shall be representative of the monitored activity.

2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this permit.

3. The permittee shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements.

4. Samples taken as required by this permit shall be analyzed in accordance with 1VAC30-45, Certification for Noncommercial Environmental Laboratories, or 1VAC30-46, Accreditation for Commercial Environmental Laboratories.

B. Records.

1. Records of monitoring information shall include:

a. The date, exact place, and time of sampling or measurements;

b. The individuals who performed the sampling or measurements;

c. The dates and times analyses were performed;

d. The individuals who performed the analyses;

e. The analytical techniques or methods used; and

f. The results of such analyses.

2. The permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this permit, and records of all data used to complete the registration statement for this permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the permittee, or as requested by the board.

C. Reporting monitoring results.

1. The permittee shall submit the results of the monitoring required by this permit not later than the 10th day of the month after monitoring takes place, unless another reporting schedule is specified elsewhere in this permit. Monitoring results shall be submitted to the department's regional office.

2. Monitoring results shall be reported on a Discharge Monitoring Report (DMR) or on forms provided, approved or specified by the department. Following notification from the department of the start date for the required electronic submission of monitoring reports, as provided for in 9VAC25-31-1020, such forms and reports submitted after that date shall be electronically submitted to the department in compliance with this section and 9VAC25-31-1020. There shall be at least three months' notice provided between the notification from the department and the date after which such forms and reports must be submitted electronically.

3. If the permittee monitors any pollutant specifically addressed by this permit more frequently than required by this permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department.

4. Calculations for all limitations that require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this permit.

D. Duty to provide information. The permittee shall furnish to the department, within a reasonable time, any information that the board may request to determine whether cause exists for modifying, revoking and reissuing, or terminating coverage under this permit or to determine compliance with this permit. The board may require the permittee to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from the permittee's discharge on the quality of state waters, or such other information as may be necessary to accomplish the purposes of the State Water Control Law. The permittee shall also furnish to the department, upon request, copies of records required to be kept by this permit.

E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this permit shall be submitted no later than 14 days following each schedule date.

F. Unauthorized discharges. Except in compliance with this permit or another permit issued by the board, it shall be unlawful for any person to:

1. Discharge into state waters sewage, industrial wastes, other wastes, or any noxious or deleterious substances; or

2. Otherwise alter the physical, chemical or biological properties of such state waters and make them detrimental to the public health, or to animal or aquatic life, or to the use of such waters for domestic or industrial consumption, or for recreation, or for other uses.

G. Reports of unauthorized discharges. Any permittee who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance into or upon state waters in violation of Part III F (Unauthorized discharges); or who discharges or causes or allows a discharge that may reasonably be expected to enter state waters in violation of Part III F, shall notify (see Part III I 3) the department of the discharge immediately upon discovery of the discharge, but in no case later than 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department within five days of discovery of the discharge. The written report shall contain:

1. A description of the nature and location of the discharge;

2. The cause of the discharge;

3. The date on which the discharge occurred;

4. The length of time that the discharge continued;

5. The volume of the discharge;

6. If the discharge is continuing, how long it is expected to continue;

7. If the discharge is continuing, what the expected total volume of the discharge will be; and

8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this permit.

Discharges reportable to the department under the immediate reporting requirements of other regulations are exempted from this requirement.

H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a bypass or upset, should occur from a treatment works and the discharge enters or could be expected to enter state waters, the permittee shall promptly notify, in no case later than 24 hours, the department by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The permittee shall reduce the report to writing and shall submit it to the department within five days of discovery of the discharge in accordance with Part III I 2. Unusual and extraordinary discharges include any discharge resulting from:

1. Unusual spillage of materials resulting directly or indirectly from processing operations;

2. Breakdown of processing or accessory equipment;

3. Failure or taking out of service some or all of the treatment works; and

4. Flooding or other acts of nature.

I. Reports of noncompliance.

1. The permittee shall report any noncompliance that may adversely affect state waters or may endanger public health.

a. An oral report shall be provided within 24 hours from the time the permittee becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this subdivision:

(1) Any unanticipated bypass; and

(2) Any upset that causes a discharge to surface waters.

b. A written report shall be submitted within five days and shall contain:

(1) A description of the noncompliance and its cause;

(2) The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and

(3) Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.

The board may waive the written report on a case-by-case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on state waters has been reported.

2. The permittee shall report all instances of noncompliance not reported under Part III I 1 or 2, in writing, at the time the next monitoring reports are submitted. The reports shall contain the information listed in Part III I 2.

3. The immediate (within 24 hours) reports required in Part III G, H, and I may be made to the department's regional office. Reports may be made by telephone, or online at https://www.deq.virginia.gov/our-programs/pollution-response.

For reports outside normal working hours, leave a message and this shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-8892.

4. Where the permittee becomes aware that it failed to submit any relevant facts in a permit registration statement or submitted incorrect information in a permit registration statement or in any report to the department, it shall promptly submit such facts or information.

J. Notice of planned changes.

1. The permittee shall give notice to the department as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required only when:

a. The permittee plans alteration or addition to any building, structure, facility, or installation from which there is or may be a discharge of pollutants, the construction of which commenced:

(1) After promulgation of standards of performance under § 306 of the federal Clean Water Act that are applicable to such source; or

(2) After proposal of standards of performance in accordance with § 306 of the federal Clean Water Act that are applicable to such source, but only if the standards are promulgated in accordance with § 306 within 120 days of their proposal;

b. The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are subject neither to effluent limitations nor to notification requirements specified under Part I B 6; or

c. The alteration or addition results in a significant change in the permittee's sludge use or disposal practices and such alteration, addition, or change may justify the application of permit conditions that are different from or absent in the existing permit, including notification of additional use or disposal sites not reported during the permit registration process or not reported pursuant to an approved land application plan.

2. The permittee shall give advance notice to the department of any planned changes in the permitted facility or activity that may result in noncompliance with permit requirements.

K. Signatory requirements.

1. Registration statement. All registration statements shall be signed as follows:

a. For a corporation: by a responsible corporate officer. For the purposes of this section, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities provided the manager is authorized to make management decisions that govern the operation of the regulated facility, including having the explicit or implicit duty of making capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or other actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;

b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or

c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this section, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency.

2. Reports and other information. All reports required by permits, and other information requested by the board, shall be signed by a person described in Part III K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if:

a. The authorization is made in writing by a person described in Part III K 1;

b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. A duly authorized representative may thus be either a named individual or any individual occupying a named position; and

c. The written authorization is submitted to the department.

3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of Part III K 2 shall be submitted to the department prior to or together with any reports or information to be signed by an authorized representative.

4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

L. Duty to comply. The permittee shall comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the State Water Control Law and the federal Clean Water Act, except that noncompliance with certain provisions of this permit may constitute a violation of the State Water Control Law but not the federal Clean Water Act. Permit noncompliance is grounds for enforcement action; for permit coverage termination or denial of a permit renewal.

The permittee shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards, even if this permit has not yet been modified to incorporate the requirement.

M. Duty to reapply. If the permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the permittee shall submit a new registration statement at least 60 days before the expiration date of the existing permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing permit.

N. Effect of a permit. This permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights or any infringement of federal, state or local laws or regulations.

O. State law. Nothing in this permit shall be construed to preclude the institution of any legal action under, or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to, any other state law or regulation or under authority preserved by § 510 of the federal Clean Water Act. Except as provided in permit conditions in Part III U (Bypass) and Part III V (Upset) nothing in this permit shall be construed to relieve the permittee from civil and criminal penalties for noncompliance.

P. Oil and hazardous substance liability. Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law.

Q. Proper operation and maintenance. The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) that are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems that are installed by the permittee only when the operation is necessary to achieve compliance with the conditions of this permit.

R. Disposal of solids or sludges. Solids, sludges, or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering state waters.

S. Duty to mitigate. The permittee shall take all reasonable steps to minimize or prevent any discharge or sludge use or disposal in violation of this permit that has a reasonable likelihood of adversely affecting human health or the environment.

T. Need to halt or reduce activity not a defense. It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.

U. Bypass.

1. "Bypass" means the intentional diversion of waste streams from any portion of a treatment facility. The permittee may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and U 3.

2. Notice.

a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, prior notice shall be submitted if possible at least 10 days before the date of the bypass.

b. Unanticipated bypass. The permittee shall submit notice of an unanticipated bypass as required in Part III I (Reports of noncompliance).

3. Prohibition of bypass.

a. Bypass is prohibited, and the board may take enforcement action against a permittee for bypass, unless:

(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage;

(2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and

(3) The permittee submitted notices as required under Part III U 2.

b. The board may approve an anticipated bypass, after considering its adverse effects, if the board determines that it will meet the three conditions listed in Part III U 3 a.

V. Upset.

1. An upset, defined in 9VAC25-31-10, constitutes an affirmative defense to an action brought for noncompliance with technology-based permit effluent limitations if the requirements of Part III V 2 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review.

2. A permittee that wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that:

a. An upset occurred and that the permittee can identify the causes of the upset;

b. The permitted facility was at the time being properly operated;

c. The permittee submitted notice of the upset as required in Part III I; and

d. The permittee complied with any remedial measures required under Part III S.

3. In any enforcement proceeding, the permittee seeking to establish the occurrence of an upset has the burden of proof.

W. Inspection and entry. The permittee shall allow the director or an authorized representative (including an authorized contractor acting as a representative of the administrator), upon presentation of credentials and other documents as may be required by law, to:

1. Enter upon the permittee's premises where a regulated facility or activity is located or conducted or where records must be kept under the conditions of this permit;

2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit;

3. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this permit; and

4. Sample or monitor at reasonable times, for the purposes of ensuring permit compliance or as otherwise authorized by the federal Clean Water Act and the State Water Control Law, any substances or parameters at any location.

For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours or whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency.

X. Permit actions. Permits may be modified, revoked and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any permit condition.

Y. Transfer of permit coverage.

1. Permit coverage is not transferable to any person except after notice to the department.

2. Coverage under this permit may be automatically transferred to a new permittee if:

a. The current permittee notifies the department within 30 days of the transfer of the title to the facility or property unless permission for a later date has been granted by the board;

b. The notice includes a written agreement between the existing and new permittees containing a specific date for transfer of permit responsibility, coverage, and liability between them; and

c. The board does not notify the existing permittee and the proposed new permittee of its intent to deny the permittee coverage under the permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part III Y 2.

Z. Severability. The provisions of this permit are severable, and if any provision of this permit or the application of any provision of this permit to any circumstance is held invalid, the application of such provision to other circumstances and the remainder of this permit shall not be affected thereby.

9VAC25-151-60. Registration statement and stormwater pollution prevention plan (SWPPP).

A. An owner seeking coverage under this general permit shall submit a complete VPDES general permit registration statement in accordance with this section, which shall serve as a notice of intent for coverage under the VPDES general permit regulation for discharges of stormwater associated with industrial activity.

Any owner that was authorized to discharge under the industrial stormwater general permit that became effective on July 1, 2019, and that intends to continue coverage under this general permit shall review and update the stormwater pollution prevention plan (SWPPP) to meet all provisions of the general permit (9VAC25-151-70 et seq.) within 90 days of the department granting coverage under this permit. Owners of new facilities, facilities previously covered by an expiring individual permit, and existing facilities not currently covered by a VPDES permit that wish to obtain coverage under this general permit shall prepare and implement a written SWPPP for the facility in accordance with the general permit (9VAC25-151-70 et seq.) before submitting the registration statement.

B. Deadlines for submitting registration statements.

1. Existing facilities.

a. Any owner that was authorized to discharge under the industrial stormwater general permit that became effective on July 1, 2019, and that intends to continue coverage under this general permit shall submit a complete registration statement to the department on or before May 1, 2024.

b. Any owner covered by a VPDES individual permit for stormwater discharges associated with industrial activity that is proposing to be covered under this general permit shall submit a complete registration statement at least 240 days before the expiration date of the VPDES individual permit.

c. Any owner of an existing facility with stormwater discharges associated with industrial activity, not currently covered by a VPDES permit, that is proposing to be covered under this general permit shall submit a complete registration statement to the department.

2. New facilities. Any owner proposing a new discharge of stormwater associated with industrial activity shall submit a complete registration statement at least 60 days before the date planned for the beginning of the industrial activity at the facility.

3. New owners of existing facilities. Where the owner of an existing facility that is covered by this permit changes, the new owner of the facility shall submit a complete registration statement within 30 days of the ownership change.

4. Late registration statements. Registration statements for existing facilities covered under subdivision 1 a of this subsection will be accepted after June 30, 2024, but authorization to discharge will not be retroactive.

C. The required registration statement shall contain the following information:

1. Facility name and mailing address, owner name and mailing address, telephone number, and email address;

2. Facility street address (if different from mailing address) or location (if the facility location does not have a mailing address);

3. Facility operator (local contact) name, address, telephone number, and email address (if available) if different than owner;

4. The nature of the business conducted at the facility to be covered under this general permit, including a description of the primary industrial activity and all other industrial activities that take place;

5. The receiving waters of the industrial activity discharges;

6. A determination of whether the facility will discharge to an MS4. If the facility discharges to an MS4, the facility owner must notify the owner of the MS4 of the existence of the discharge information and include that notification with the registration statement. The notice shall include the following information: the name of the facility, a contact person and telephone number, the location of the discharge, the nature of the discharge, and the facility's VPDES general permit number (if assigned by DEQ);

7. The permit number for any existing VPDES permit assigned to the facility;

8. An indication that an SWPPP has been prepared before submitting this registration statement by the owner of a new facility, a facility previously covered by an expiring individual permit, or an existing facility not currently covered by a VPDES permit;

9. For each outfall, identification of up to four four-digit Standard Industrial Classification (SIC) Codes or two-letter Industrial Activity Codes that best represent the principal products or services rendered by the facility and major colocated industrial activities (two-letter Industrial Activity Codes are: HZ – hazardous waste treatment, storage, or disposal facilities; LF – landfills and disposal facilities that receive or have received any industrial wastes; SE – steam electric power generating facilities; or TW – treatment works treating domestic sewage);

10. Identification of all applicable industrial sectors in this permit (as designated in Table 50-2) that cover the industrial activities at the facility, and major colocated industrial activities to be covered under this permit, and the stormwater outfalls associated with each industrial sector.

a. If the facility is a landfill (sector L), state the type of landfill (i.e., MSWLF (municipal solid waste landfill), CDD (construction debris and demolition), or other), and which outfalls (if any) receive contaminated stormwater runoff;

b. If the facility is a timber products operation (sector A), state which outfalls (if any) receive discharges from wet decking areas, and which outfalls (if any) collect runoff from areas where mulch dyeing operations (including loading, transporting, and storage) occur;

c. For all facilities, state any outfalls receiving discharges from coal storage piles;

d. If the facility manufactures asphalt paving and roofing materials (sector D), state which outfalls (if any) receive discharges from areas where production of asphalt paving emulsions or roofing emulsions occurs;

e. If the facility manufactures cement (sector E), state which outfalls (if any) receive discharges from material storage piles;

f. If a scrap recycling and waste recycling facility (sector N - SIC 5093) only receives source-separated recyclable materials, state which outfalls (if any) receive discharges from this activity. List the metals (if any) that are received; or

g. For primary airports subject to 40 CFR 449 (1,000 or more annual departures of nonpropeller aircraft), list the average deicing season and state which outfalls (if any) receive discharges from deicing or anti-icing operations;

11. List the following facility area information:

a. The total area of the facility in acres;

b. The total area of industrial activity of the facility in acres;

c. The total impervious surface area of the industrial activity of the facility in acres;

d. The impervious and total areas in acres draining to each industrial activity outfall at the facility. Outfalls shall be numbered using a unique numerical identification code for each outfall. For example: Outfall Number 001 or Outfall Number 002; and

e. The latitude and longitude of each outfall location;

12. A site map depicting the following shall be included with the registration statement:

a. The property boundaries;

b. All industrial activity outfalls labeled with unique numerical identification for each outfall. Outfall numbering shall be the same as that used for the facility area information in subdivision 11 of this subsection; and

c. All water bodies or MS4 conveyances, labeled with names if applicable, receiving stormwater discharges from the site;

13. Virginia's Phase I Chesapeake Bay TMDL Watershed Implementation Plan (November 29, 2010) states that wasteloads for future growth for new facilities in the Chesapeake Bay watershed with industrial stormwater discharges cannot exceed the nutrient and sediment loadings that were discharged before the land was developed for the industrial activity. For purposes of this permit regulation, facilities that begin construction after June 30, 2024, must be consistent with this requirement to be eligible for coverage under this general permit.

If this is a new facility that began construction after June 30, 2024, in the Chesapeake Bay watershed and is applying for first time general permit coverage, attach documentation to the registration statement to demonstrate:

a. That the total phosphorus load does not exceed the greater of (i) the total phosphorus load that was discharged from the industrial area of the property before the land was developed for the new industrial activity or (ii) 0.41 pounds per acre per year (VSMP water quality design criteria, 9VAC25-875-580). The documentation must include the measures and controls that were employed to meet this requirement, along with the supporting calculations. The owner may include additional nonindustrial land on the site as part of any plan to comply with the no net increase requirement. Consistent with the definition of "site," this includes adjacent land used in connection with the facility. Compliance with the water quality design criteria may be determined utilizing the Virginia Runoff Reduction Method or another equivalent methodology approved by the department. Design specifications and pollutant removal efficiencies for specific BMPs can be found on the Virginia Stormwater BMP Clearinghouse website; or

b. The owner may consider utilization of any pollutant trading or offset program in accordance with §§ 62.1-44.19:20 through 62.1-44.19:23 of the Code of Virginia, governing trading and offsetting, to meet the no net increase requirement;

14. State Corporation Commission entity identification number if the facility is required to obtain an entity identification number by law; and

15. The following certification: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

D. The registration statement shall be signed in accordance with 9VAC25-31-110 A.

E. Where to submit. The registration statement may be delivered to the department by either postal or electronic mail and shall be submitted to the DEQ regional office serving the area where the industrial facility is located. Following notification from the department of the start date for the required electronic submission of Notices of Intent to Discharge forms (i.e., registration statements) as provided for in 9VAC25-31-1020, such forms submitted after that date shall be electronically submitted to the department in compliance with this section and 9VAC25-31-1020. There shall be at least a three-month notice provided between the notification from the department and the date after which such forms must be submitted electronically.

9VAC25-151-70. General permit.

Any owner whose registration statement is accepted by the director will receive the following general permit and shall comply with the requirements therein and be subject to the VPDES Permit Regulation, 9VAC25-31. Facilities with colocated industrial activities shall comply with all applicable monitoring and SWPPP requirements of each industrial activity sector of this chapter in which a colocated industrial activity is described. All pages of 9VAC25-151-70 and 9VAC25-151-80 apply to all stormwater discharges associated with industrial activity covered under this general permit. Not all pages of 9VAC25-151-90 et seq. will apply to every permittee. The determination of which pages apply will be based on an evaluation of the regulated activities located at the facility.

General Permit No.: VAR05

Effective Date: July 1, 2024

Expiration Date: June 30, 2029

VPDES GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY

AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM AND THE VIRGINIA STATE WATER CONTROL LAW

In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the State Water Control Law and regulations adopted pursuant thereto, owners of facilities with stormwater discharges associated with industrial activity are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those waters specifically named in board regulation that prohibit such discharges.

The authorized discharge shall be in accordance with this cover page, the registration statement, Part I-Effluent Limitations, Monitoring Requirements and Special Conditions, Part II-Conditions Applicable to All VPDES Permits, Part III-Stormwater Pollution Prevention Plan, Part IV-Sector-Specific Permit Requirements, and Part V-Chesapeake Bay Total Maximum Daily Load Compliance as set forth in this general permit.

Part I

Effluent Limitations, Monitoring Requirements and Special Conditions

A. Effluent limitations and monitoring requirements.

There are four individual and separate categories of monitoring requirements that a facility may be subject to under this permit: (i) quarterly visual monitoring; (ii) benchmark monitoring of discharges associated with specific industrial activities; (iii) compliance monitoring for discharges subject to numerical effluent limitations; and (iv) monitoring of discharges to impaired waters, both those with an approved TMDL and those without an approved TMDL. The monitoring requirements and numeric effluent limitations applicable to a facility depend on the types of industrial activities generating stormwater runoff from the facility, and for TMDL monitoring, the location of the facility's discharge. Part IV of the permit identifies monitoring requirements applicable to specific sectors of industrial activity. The permittee shall review Part I A 1 and Part IV of the permit to determine which monitoring requirements and numeric limitations apply to the permittee's facility. Unless otherwise specified, limitations and monitoring requirements under Part I A 1 and Part IV are additive.

Sector-specific monitoring requirements and limitations are applied discharge by discharge at facilities with colocated activities. Where stormwater from the colocated activities is commingled, the monitoring requirements and limitations are additive. Where more than one numeric limitation for a specific parameter applies to a discharge, compliance with the more restrictive limitation is required. Where benchmark, numerical effluent limitations, or TMDL monitoring requirements for a monitoring period overlap, the permittee may use a single sample to satisfy monitoring requirements.

1. Types of monitoring requirements and limitations.

a. Quarterly visual monitoring. The requirements and procedures for quarterly visual monitoring are applicable to all facilities covered under this permit, regardless of the facility's sector of industrial activity.

(1) The permittee shall perform and document a quarterly visual examination of a stormwater discharge associated with industrial activity from each outfall, except discharges exempted in Part I A 3 or A 4. The visual examinations shall be made at least once in each of the following three-month periods: January through March, April through June, July through September, and October through December. The visual examination shall be made during normal working hours, where practicable, and when considerations for safety and feasibility allow. If no storm event resulted in runoff from the facility during a monitoring quarter, the permittee is excused from visual monitoring for that quarter provided that documentation is included with the monitoring records indicating that no runoff occurred.

(2) Samples shall be collected in accordance with Part I A 2. Sample examination shall document observations of color, odor, clarity, floating solids, settled solids, suspended solids, foam, oil sheen, and other obvious indicators of stormwater pollution. The visual examination of the sample shall be conducted in a well-lit area. No analytical tests are required to be performed on the samples.

(3) The visual examination documentation shall be maintained on-site with the SWPPP. The documentation shall include the outfall location, the examination date and time, examination staff, the nature of the discharge (i.e., runoff or snow melt), visual quality of the stormwater discharge (including observations of color, odor, clarity, floating solids, settled solids, suspended solids, foam, oil sheen, and other obvious indicators of stormwater pollution), and probable sources of any observed stormwater contamination.

b. Benchmark monitoring of discharges associated with specific industrial activities.

Table 70-1 identifies the specific industrial sectors subject to the benchmark monitoring requirements of this permit and the industry-specific pollutants of concern. The permittee shall refer to the tables found in the individual sectors in Part IV for benchmark monitoring concentration values. Colocated industrial activities at the facility that are described in more than one sector in Part IV shall comply with all applicable benchmark monitoring requirements from each sector.

The results of benchmark monitoring are primarily for the permittee to use to determine the overall effectiveness of the SWPPP in controlling the discharge of pollutants to receiving waters. Benchmark concentration values, included in Part IV of this permit, are not effluent limitations. Exceedance of a benchmark concentration does not constitute a violation of this permit and does not show that violation of a water quality standard has occurred; however, it does signal that modifications to the SWPPP are necessary, unless justification is provided in a routine facility inspection. In addition, exceedance of benchmark concentrations may identify facilities that would be more appropriately covered under an individual, or alternative general permit where more specific pollution prevention controls could be required.

TABLE 70-1
INDUSTRIAL SECTORS SUBJECT TO BENCHMARK MONITORING

Industry Sector1

SIC Code or Activity Code

Benchmark Monitoring Parameters

A

2421

TSS.

2491

Arsenic, Chromium, Copper.

2411

TSS.

2426

TSS.

2499 (24991303)

COD, TSS.

2499 (Mulch Dyeing)

BOD, TSS, COD, Aluminum, Arsenic, Cadmium, Chromium, Copper, Selenium, Silver, Zinc, Total N, Total P.

B

2631

BOD.

C

2812-2819

Aluminum, Iron, Total N.

2821-2824

Zinc.

2841-2844

Total N, Zinc.

2873-2879

Total N, Zinc, Total P.

2875 (Composting Facilities)

TSS, BOD, COD, Ammonia, Total N, Total P.

D

2951, 2952

TSS.

E

3251-3259, 3261-3269

Aluminum.

3274, 3275

TSS, pH.

F

3312-3317

Aluminum, Zinc.

3321-3325

Aluminum, TSS, Copper, Zinc.

3351-3357

Copper, Zinc.

3363-3369

Copper, Zinc.

G2

1021

TSS.

H

1221-1241

TSS, Aluminum.

K

HZ (Hazardous Waste Treatment, Storage, or Disposal)

TKN, TSS, TOC, Arsenic, Cadmium, Cyanide, Lead, Mercury, Selenium, Silver.

L

LF (Landfills, Land Application Sites, and Open Dumps)

TSS.

M

5015

TSS, Aluminum, Lead.

N

5093

Copper, Aluminum, Lead, Zinc, TSS, Cadmium, Chromium.

4499

Aluminum, Cadmium, Chromium, Copper, Lead, Zinc, TSS.

O

SE (Steam Electric Generating Facilities)

Facilities in Sector O are not subject to benchmark requirements.

Q

4412-4499 (except 4499 facilities as specified in Sector N)

TSS, Copper, Zinc.

3731, 3732

TSS, Copper, Zinc.

U

2021-2026

BOD, TSS.

2041-2048

TSS, TKN.

2074-2079

BOD, Total N, TSS.

Y

3011-3069

Zinc.

AA

3411-3471, 3482-3499, 3911-3915

Aluminum, Copper, Zinc.

3479

Zinc.

AB

3511-3599 (except 3571-3579)

TSS, TPH, Copper, Zinc.

AD

Nonclassified Facilities/Stormwater Discharges Designated by the department as Requiring Permits

As determined by the director.

AE

2611, 2621, 2652-2657, 2671-2679, 2833-2836, 2851, 2861-2869, 2891-2899, 3952, 3211, 3221, 3229, 3231, 3241, 3281, 3291-3299, 3331-3339, 3398, 3399, 3341, 1311, 1321, 1381-1389, 2911, 4512-4581, (TW) Treatment Works, 2011-2015, 2032-2038, 2051-2053, 2061-2068, 2082-2087, 2091-2099, 2111-2141, 2211-2299, 2311-2399, 3131-3199, 2434, 2511-2599, 2711-2796, 3081-3089, 3931, 3942-3949, 3951-3955 (except 3952), 3961, 3965, 3991-3999, 3111, 3711-3799 (except 3731, 3732 see Sector Q), 3571-3579, 3612-3699, 3812-3873

Facilities in Sector AE are not subject to benchmark monitoring requirements.

AF

4011, 4013, 4111-4173, 4212-4231, 4311, 5171

TSS.

1Table does not include parameters for compliance monitoring under effluent limitations guidelines.

2See Sector G (Part IV G) for additional monitoring discharges from waste rock and overburden piles from active ore mining or dressing facilities, inactive ore mining or dressing facilities, and sites undergoing reclamation.

(1) Benchmark monitoring shall be performed for all benchmark parameters specified for the industrial sector applicable to a facility's discharge. Monitoring shall be performed at least once during each of the first four, and potentially all, monitoring periods after coverage under the permit begins. Monitoring begins with the first full monitoring period after the owner is granted coverage under the permit. Monitoring periods are specified in Part I A 2.

(2) Benchmark monitoring waivers for facilities testing below benchmark concentration values. Waivers from benchmark monitoring are available to facilities whose discharges are below benchmark concentration values on an outfall by outfall basis. Sector-specific benchmark monitoring is not required to be conducted in subsequent monitoring periods during the term of this permit provided:

(a) Samples were collected in four consecutive monitoring periods, and the average of the four samples for all parameters at the outfall is below the applicable benchmark concentration value in Part IV. Facilities that were covered under the 2019 industrial stormwater general permit may use sampling data from the last two monitoring periods of that permit and the first two monitoring periods of this permit to satisfy the four consecutive monitoring periods requirement;

(b) The facility is not subject to a numeric effluent limitation established in Part I A 1 c (1) (stormwater effluent limitations), Part I A 1 c (2) (coal pile runoff), or Part IV (Sector Specific Permit Requirements) for any of the parameters at that outfall; and

(c) A waiver request is submitted to and approved by the department. The waiver request shall be sent to the appropriate DEQ regional office, along with the supporting monitoring data for four consecutive monitoring periods, and a certification that, based on current potential pollutant sources and control measures used, discharges from the facility are reasonably expected to be substantially similar or cleaner compared to when the benchmark monitoring for the four consecutive monitoring periods was done.

Waiver requests will be evaluated by the department based on (i) benchmark monitoring results below the benchmark concentration values; (ii) a favorable compliance history (including inspection results); and (iii) no outstanding enforcement actions.

The monitoring waiver may be revoked by the department for cause. The permittee will be notified in writing that the monitoring waiver is revoked, and that the benchmark monitoring requirements are again in force and will remain in effect until the permit's expiration date.

(3) Samples shall be collected and analyzed in accordance with Part I A 2. Monitoring results shall be reported in accordance with Part I A 5 and Part II C and retained in accordance with Part II B.

c. Compliance monitoring for discharges subject to numerical effluent limitations or discharges to impaired waters.

(1) Facilities subject to stormwater effluent limitation guidelines.

(a) Facilities subject to stormwater effluent limitation guidelines (see Table 70-2) are required to monitor the discharges to evaluate compliance with numerical effluent limitations. Industry-specific numerical limitations and compliance monitoring requirements are described in Part IV of the permit. Permittees with colocated industrial activities at the facility that are described in more than one sector in Part IV shall comply on a discharge-by-discharge basis with all applicable effluent limitations from each sector.

(b) Permittees shall monitor the discharges for the presence of the pollutant subject to the effluent limitation at least once during each of the monitoring periods after coverage under the permit begins. Monitoring begins with the first full monitoring period after the owner is granted coverage under the permit. Monitoring periods are specified in Part I A 2. The substantially identical outfall monitoring provisions (Part I A 2 f) are not available for numeric effluent limits monitoring.

(c) Samples shall be collected and analyzed in accordance with Part I A 2. Monitoring results shall be reported in accordance with Part I A 5 and Part II C, and retained in accordance with Part II B.

TABLE 70-2
STORMWATER-SPECIFIC EFFLUENT LIMITATION GUIDELINES

Effluent Limitation Guideline

Sectors with Affected Facilities

Runoff from material storage piles at cement manufacturing facilities (40 CFR Part 411 Subpart C (established February 20, 1974))

E

Contaminated runoff from phosphate fertilizer manufacturing facilities (40 CFR Part 418 Subpart A (established April 8, 1974))

C

Coal pile runoff at steam electric generating facilities (40 CFR Part 423 (established November 19, 1982))

O

Discharges resulting from spray down or intentional wetting of logs at wet deck storage areas (40 CFR Part 429, Subpart I (established January 26, 1981))

A

Runoff from asphalt emulsion facilities (40 CFR Part 443 Subpart A (established July 24, 1975))

D

Runoff from landfills (40 CFR Part 445, Subpart A and B (established January 19, 2000))

K and L

Discharges from airport deicing operations (40 CFR Part 449 (established May 16, 2012))

Facilities subject to the effluent limitation guidelines in 40 CFR Part 449 may be covered under Sector AD.

(2) Facilities subject to coal pile runoff monitoring.

(a) Facilities with discharges of stormwater from coal storage piles shall comply with the limitations and monitoring requirements of Table 70-3 for all discharges containing the coal pile runoff, regardless of the facility's sector of industrial activity.

(b) Permittees shall monitor the stormwater discharges at least once during each of the monitoring periods after coverage under the permit begins. Monitoring begins with the first full monitoring period after the owner is granted coverage under the permit. Monitoring periods are specified in Part I A 2. The substantially identical outfall monitoring provisions (Part I A 2 f) are not available for coal pile numeric effluent limits monitoring.

(c) The coal pile runoff shall not be diluted with other stormwater or other flows to meet this limitation.

(d) If a facility is designed, constructed, and operated to treat the volume of coal pile runoff that is associated with a 10-year, 24-hour rainfall event, any untreated overflow of coal pile runoff from the treatment unit is not subject to the 50 mg/L limitation for total suspended solids.

(e) Samples shall be collected and analyzed in accordance with Part I A 2. Monitoring results shall be reported in accordance with Part I A 5 and Part II C, and retained in accordance with Part II B.

TABLE 70-3
NUMERIC LIMITATIONS FOR COAL PILE RUNOFF

Parameter

Limit

Monitoring Frequency

Sample Type

Total Suspended Solids (TSS)

50 mg/l, max.

1/6 months

Grab

pH

6.0 min. - 9.0 max.

1/6 months

Grab

(3) Facilities discharging to an impaired water with an approved TMDL wasteload allocation. Owners of facilities that are a source of the specified pollutant of concern to waters for which a TMDL wasteload allocation has been approved by the U.S. Environmental Protection Agency (EPA) before the term of this permit will be notified by the department when they are approved for coverage under the general permit.

(a) Upon written notification from the department, permittees shall monitor the discharges for the pollutant subject to TMDL wasteload allocation once every six months after coverage under the permit begins, unless another sampling frequency is determined by the department for polychlorinated biphenyls (PCBs). Monitoring begins with the first full monitoring period after the owner is granted coverage under the permit. Monitoring periods are specified in Part I A 2.

(b) Samples shall be collected and analyzed in accordance with Part I A 2. Monitoring results shall be reported in accordance with Part I A 5 and Part II C, and retained in accordance with Part II B.

(c) If the pollutant subject to the TMDL wasteload allocation is below the quantitation level in all of the samples from the first four monitoring periods, the permittee may request to the department in writing that further sampling be discontinued, unless the TMDL has specific instructions to the contrary (in which case those instructions shall be followed). The laboratory certificate of analysis shall be submitted with the request. If approved, documentation of this shall be kept with the SWPPP.

If the pollutant subject to the TMDL wasteload allocation is above the quantitation level in any of the samples from the first four monitoring periods, the permittee shall continue the scheduled TMDL monitoring throughout the term of the permit. Applicable sampling data collected during the 2019 industrial stormwater general permit term may be used to satisfy all or part of the four monitoring periods requirement.

(d) Upon written notification from the department, facilities exceeding the TMDL wasteload allocation shall prepare and submit a pollutant minimization plan (PMP) designed to investigate the location and potential reduction of sources in the facility's stormwater discharges. The PMP shall be developed and submitted to the department for approval within 180 days of the receipt of notification from the department. The PMP shall include the following items, as appropriate:

(i) Facility contact for the contents of the PMP and any activities associated with the PMP;

(ii) A proposed implementation schedule for minimization activities and prospective milestones;

(iii) Proposed actions for known or probable sources;

(iv) Proposed action to find and control unknown sources;

(v) A summary of any previous minimization activities; and

(vi) Information on continuing assessment of progress, which may include establishment of criteria to evaluate whether the location and potential reduction of sources have been addressed.

(4) Facilities discharging to an impaired water without an approved TMDL wasteload allocation. Owners of facilities that discharge to waters listed as impaired in the 2022 Final 305(b)/303(d) Water Quality Assessment Integrated Report, and for which a TMDL wasteload allocation has not been approved before the term of this permit, will be notified by the department when they are approved for coverage under the general permit.

(a) Upon written notification from the department,

permittees shall monitor the discharges for all pollutants for which the waterbody is impaired, and for which a standard analytical method exists, at least once every six months after coverage under the permit begins, unless otherwise determined by the department for polychlorinated biphenyls (PCBs). Monitoring begins with the first full monitoring period after the owner is granted coverage under the permit. Monitoring periods are specified in Part I A 2.

(b) If the pollutant for which the waterbody is impaired is suspended solids, turbidity, or sediment, or sedimentation, monitor for total suspended solids (TSS). If the pollutant for which the waterbody is impaired is expressed in the form of an indicator or surrogate pollutant, monitor for that indicator or surrogate pollutant. No monitoring is required when a waterbody's biological communities are impaired but no pollutant, including indicator or surrogate pollutants, is specified as causing the impairment, or when a waterbody's impairment is related to hydrologic modifications, impaired hydrology, or temperature. Samples shall be collected and analyzed in accordance with Part I A 2. Monitoring results shall be reported in accordance with Part I A 5 and Part II C, and retained in accordance with Part II B.

(c) If the pollutant for which the water is impaired is below the quantitation level in the discharges from the facility, or it is above the quantitation level but its presence is caused solely by natural background sources, the permittee may request to the department in writing that further impaired water monitoring be discontinued. The laboratory certificate of analysis shall be submitted with the request. If approved, documentation of this shall be kept with the SWPPP.

To support a determination that the pollutant's presence is caused solely by natural background sources, the following documentation shall be submitted with the request and kept with the SWPPP: (i) an explanation of why it is believed that the presence of the impairment pollutant in the facility's discharge is not related to the activities at the facility; and (ii) data or studies that tie the presence of the impairment pollutant in the facility's discharge to natural background sources in the watershed. Natural background pollutants include those substances that are naturally occurring in soils or groundwater. Natural background pollutants do not include legacy pollutants from earlier activity at the facility's site or pollutants in run-on from neighboring sources that are not naturally occurring.

2. Monitoring instructions.

a. Collection and analysis of samples. Sampling requirements shall be assessed on an outfall by outfall basis. Samples shall be collected and analyzed in accordance with the requirements of Part II A.

b. When and how to sample. A minimum of one grab sample shall be taken from the discharge associated with industrial activity resulting from a storm event that results in a discharge from the site, providing the interval from the preceding storm event discharge is at least 72 hours. The 72-hour storm interval is waived if the permittee is able to document that less than a 72-hour interval is representative for local storm events during the sampling period. In the case of snowmelt, the monitoring shall be performed at a time when a measurable discharge occurs at the site. For discharges from a stormwater management structure, the monitoring shall be performed at a time when a measurable discharge occurs from the structure.

The grab sample shall be taken during the first 30 minutes of the discharge. If it is not practicable to take the sample during the first 30 minutes, the sample may be taken during the first three hours of the discharge, provided that the permittee explains why a grab sample during the first 30 minutes was impracticable. This information shall be submitted in the department's electronic discharge monitoring report (e-DMR) system, and maintained with the SWPPP. If the sampled discharge commingles with process or nonprocess water, the permittee shall attempt to sample the stormwater discharge before it mixes with the nonstormwater.

c. Storm event data. For each monitoring event (except snowmelt monitoring), along with the monitoring results, the permittee shall identify the date of the storm event sampled; rainfall total (in inches) of the storm event that generated the sampled runoff; and the interval between the storm event sampled and the end of the previous storm event discharge. For snowmelt monitoring, the permittee shall identify the date of the sampling event.

d. Monitoring periods.

(1) Quarterly visual monitoring. The quarterly visual examinations shall be made at least once in each of the following three-month periods each year of permit coverage: January through March, April through June, July through September, and October through December.

(2) Benchmark monitoring, effluent limitation monitoring, and impaired waters monitoring (for waters both with and without an approved TMDL). Monitoring shall be conducted at least once in each of the following semiannual periods each year of permit coverage: January through June, and July through December.

e. Documentation explaining a facility's inability to obtain a sample (including dates and times the outfalls were viewed or sampling was attempted), of no rain event, or of deviation from the 72-hour storm interval shall be submitted with the e-DMR and maintained with the SWPPP. Acceptable documentation includes National Climatic Data Center (NCDC) weather station data, local weather station data, facility rainfall logs, and other appropriate supporting data.

f. Representative outfalls - substantially identical discharges. If the facility has two or more outfalls that discharge substantially identical effluents, based on similarities of the industrial activities, significant materials, size of drainage areas, and stormwater management practices occurring within the drainage areas of the outfalls, frequency of discharges, and stormwater management practices occurring within the drainage areas of the outfalls, the permittee may conduct monitoring on the effluent of just one of the outfalls and report that the observations also apply to the substantially identical outfall. The substantially identical outfall monitoring provisions apply to quarterly visual monitoring, benchmark monitoring, and impaired waters monitoring (both those with and without an approved TMDL). The substantially identical outfall monitoring provisions are not available for numeric effluent limits monitoring. The permittee shall include the following information in the SWPPP:

(1) The locations of the outfalls;

(2) An evaluation, including available monitoring data, indicating the outfalls are expected to discharge substantially identical effluents, including evaluation of monitoring data where available; and

(3) An estimate of the size of each outfall's drainage area in acres.

3. Adverse climatic conditions waiver. When adverse weather conditions prevent the collection of samples, a substitute sample may be taken during a qualifying storm event in the next monitoring period. Adverse weather conditions are those that are dangerous or create inaccessibility for staff and may include local flooding, high winds, electrical storms, or situations that otherwise make sampling impracticable (e.g., drought or extended frozen conditions). Unless specifically stated otherwise, this waiver may be applied to any monitoring required under this permit. Narrative documentation of conditions necessitating the use of the waiver shall be kept with the SWPPP.

4. Inactive and unstaffed sites (including temporarily inactive sites).

a. A waiver of the quarterly visual monitoring, routine facility inspections, and monitoring requirements (including benchmark, effluent limitation, and impaired waters monitoring) may be granted by the department at a facility that is both inactive and unstaffed, as long as the facility remains inactive and unstaffed and there are no industrial materials or activities exposed to stormwater. The owner of the facility is only required to conduct an annual routine site inspection in accordance with the requirements in Part III B 5.

b. An inactive and unstaffed sites waiver request shall be submitted to the department for approval and shall include the name of the facility; the facility's VPDES general permit registration number; a contact person, telephone number, and email address; the reason for the request; and the date the facility became or will become inactive and unstaffed. The waiver request shall be signed and certified in accordance with Part II K. If this waiver is granted, a copy of the request and the department's written approval of the waiver shall be maintained with the SWPPP.

c. If circumstances change and industrial materials or activities become exposed to stormwater or the facility becomes either active or staffed, the permittee shall notify the department within 30 days, and all quarterly visual monitoring, routine facility inspections, and monitoring requirements shall be resumed immediately.

d. The department retains the right to revoke this waiver when it is determined that the discharge is causing, has a reasonable potential to cause, or contributes to a water quality standards violation.

e. Inactive and unstaffed facilities covered under Sector G (Metal Mining) and Sector H (Coal Mines and Coal Mining-Related Facilities) are not required to meet the "no industrial materials or activities exposed to stormwater" standard to be eligible for this waiver, consistent with the conditional exemption requirements established in Part IV Sector G and Part IV Sector H.

5. Reporting monitoring results.

a. Reporting to the department. The permittee shall follow the reporting requirements and deadlines in Table 70-4 for the types of monitoring that apply to the facility:

TABLE 70-4
MONITORING REPORTING REQUIREMENTS

Semiannual Monitoring

Submit the results by January 10 and by July 10.

Quarterly Visual Monitoring

Retain results with SWPPP - do not submit unless requested to do so by the department.

Permittees shall submit results for each outfall associated with industrial activity according to the requirements of Part II C.

b. Significant digits. The permittee shall report at least the same number of significant digits as a numeric effluent limitation or TMDL wasteload allocation for a given parameter; otherwise, at least two significant digits shall be reported for a given parameter. Regardless of the rounding convention used by the permittee (i.e., five always rounding up or to the nearest even number), the permittee shall use the convention consistently and shall ensure that consulting laboratories employed by the permittee use the same convention.

6. Corrective actions.

a. The permittee shall take corrective action whenever:

(1) Routine facility inspections, inspections by local, state or federal officials, or any other process, observation or event result in a determination that modifications to the stormwater control measures are necessary to meet the permit requirements;

(2) There is any exceedance of an effluent limitation (including coal pile runoff), TMDL wasteload allocation, or a reduction required by a local ordinance established by a municipality to meet Chesapeake Bay TMDL requirements;

(3) The department determines, or the permittee becomes aware, that the stormwater control measures are not stringent enough for the discharge to meet applicable water quality standards; or

(4) Benchmark monitoring results exceed the benchmark concentration value for a parameter.

The permittee shall review the SWPPP and modify it as necessary to address any deficiencies. Revisions to the SWPPP shall be completed within 60 days following the discovery of the deficiency. When control measures need to be modified or added (distinct from regular preventive maintenance of existing control measures described in Part III C), implementation shall be completed before the next anticipated storm event if possible, but no later than 60 days after the deficiency is discovered, or as otherwise provided or approved by the department. In cases where construction is necessary to implement control measures, the permittee shall include a schedule in the SWPPP that provides for the completion of the control measures as expeditiously as practicable, but no later than three years after the deficiency is discovered. Where a construction compliance schedule is included in the SWPPP, the SWPPP shall include appropriate nonstructural and temporary controls to be implemented in the affected portion of the facility before completion of the permanent control measure. Any corrective actions taken shall be documented and retained with the SWPPP. Any control measure modifications shall be dated and document the amount of time taken to modify the applicable control measures or implement additional control measures.

b. Natural background pollutant levels. If the concentration of a pollutant exceeds a benchmark concentration value and the permittee determines that exceedance of the benchmark is attributable solely to the presence of that pollutant in the natural background, corrective action is not required provided that:

(1) The concentration of the benchmark monitoring result is less than or equal to the concentration of that pollutant in the natural background;

(2) The permittee documents and maintains with the SWPPP the supporting rationale for concluding that benchmark exceedances are in fact attributable solely to natural background pollutant levels. The supporting rationale shall include any data previously collected by the facility or others (including literature studies) that describe the levels of natural background pollutants in the facility's stormwater discharges; and

(3) The permittee notifies the department on the benchmark monitoring DMR that the benchmark exceedances are attributable solely to natural background pollutant levels. Natural background pollutants include those substances that are naturally occurring in soils or groundwater. Natural background pollutants do not include legacy pollutants from earlier activity on the facility's site, or pollutants in run-on from neighboring sources that are not naturally occurring.

c. Follow-up reporting. If at any time monitoring results show that discharges from the facility exceed an effluent limitation or a TMDL wasteload allocation, or the department determines that discharges from the facility are causing or contributing to an exceedance of a water quality standard, immediate steps shall be taken to eliminate the exceedances in accordance with Part I A 6. Within 30 calendar days of implementing the relevant corrective action, an exceedance report shall be submitted to the department and shall be signed in accordance with Part II K. The following information shall be included in the report:

(1) General permit registration number;

(2) Facility name and address;

(3) Receiving water for each outfall exceeding an effluent limitation of TMDL wasteload allocation;

(4) Monitoring data from the event being reported;

(5) A narrative description of the situation;

(6) A description of actions taken since the event was discovered and steps taken to minimize to the extent feasible pollutants in the discharge; and

(7) A local facility contact name, email address, and phone number.

B. Special conditions.

1. Authorized nonstormwater discharges. Except as provided in this section or in Part IV, all discharges covered by this permit shall be composed entirely of stormwater. The following nonstormwater discharges are authorized by this permit:

a. Discharges from emergency firefighting activities or firefighting training activities managed in a manner to avoid an instream impact in accordance with § 9.1-207.1 of the Code of Virginia;

b. Fire hydrant flushings, managed in a manner to avoid an instream impact;

c. Potable water, including water line flushings, managed in a manner to avoid an instream impact;

d. Uncontaminated condensate from air conditioners, coolers, and other compressors and from the outside storage of refrigerated gases or liquids;

e. Irrigation drainage;

f. Landscape watering provided all pesticides, herbicides, and fertilizer have been applied in accordance with the approved labeling;

g. Routine external building washdown, provided no soaps, solvents, or detergents are used, external building surfaces do not contain hazardous substances, and the washwater is filtered, settled, or similarly treated prior to discharge;

h. Pavement washwaters, provided no soaps, solvents, detergents, or hazardous cleaning products are used, and no spills or leaks of toxic or hazardous materials have occurred (unless all spilled or leaked material is removed prior to washing), and the washwater is filtered, settled, or similarly treated prior to discharge;

i. Uncontaminated groundwater or spring water;

j. Foundation or footing drains where flows are not contaminated with process materials; and

k. Incidental windblown mist from cooling towers that collects on rooftops or adjacent portions of the facility, but not intentional discharges from the cooling tower (e.g., "piped" cooling tower blowdown or drains).

All other nonstormwater discharges are not authorized and shall either be eliminated or covered under a separate VPDES permit.

2. Releases of hazardous substances or oil in excess of reportable quantities. The discharge of hazardous substances or oil in the stormwater discharges from the facility shall be prevented or minimized in accordance with the SWPPP for the facility. This permit does not authorize the discharge of hazardous substances or oil resulting from an on-site spill. This permit does not relieve the permittee of the reporting requirements of 40 CFR Part 110, 40 CFR Part 117, and 40 CFR Part 302 or § 62.1-44.34:19 of the Code of Virginia.

Where a release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, or 40 CFR Part 302 occurs during a 24-hour period:

a. The permittee is required to notify the department in accordance with the requirements of Part II G as soon as he has knowledge of the discharge;

b. Where a release enters an MS4, the permittee shall also notify the owner of the MS4; and

c. The SWPPP required under Part III shall be reviewed to identify measures to prevent the reoccurrence of the releases and to respond to the releases, and the SWPPP shall be modified where appropriate.

3. Colocated industrial activity. If the facility has industrial activities occurring on-site that are described by any of the activities in Part IV of the permit, those industrial activities are considered to be colocated industrial activities. Stormwater discharges from colocated industrial activities are authorized by this permit, provided that the permittee complies with any and all additional SWPPP and monitoring requirements from Part IV applicable to that particular colocated industrial activity. The permittee shall be responsible for additional SWPPP and monitoring requirements applicable to the colocated industrial activity by examining the narrative descriptions of all discharges covered under this section.

4. The stormwater discharges authorized by this permit may be combined with other sources of stormwater that are not required to be covered under a VPDES permit, so long as the combined discharge is in compliance with this permit.

5. There shall be no discharge of waste, garbage, or floating debris in other than trace amounts.

6. Approval for coverage under this general permit does not relieve the permittee of the responsibility to comply with any other applicable federal, state, or local statute, ordinance, or regulation.

7. Discharges to waters subject to TMDL wasteload allocations. Owners of facilities that are a source of the specified pollutant of concern to waters for which a TMDL wasteload allocation has been approved by EPA before the term of this permit shall incorporate measures and controls into the SWPPP required by Part III that are consistent with the assumptions and requirements of the TMDL. The department will provide written notification to the owner that a facility is subject to the TMDL requirements. The facility's SWPPP shall specifically address any conditions or requirements included in the TMDL that are applicable to discharges from the facility. If the TMDL establishes a specific numeric wasteload allocation that applies to discharges from the facility, the owner shall perform any required monitoring in accordance with Part I A 1 c (3), and implement control measures designed to meet that allocation.

8. Discharges through a regulated MS4 to waters subject to the Chesapeake Bay TMDL. In addition to the requirements of this permit, any facility with industrial activity stormwater discharges through a regulated MS4 that is notified by the MS4 operator that the locality has adopted ordinances to meet the Chesapeake Bay TMDL shall incorporate measures and controls into its SWPPP to comply with applicable local TMDL ordinance requirements.

9. Expansion of facilities that discharge to waters subject to the Chesapeake Bay TMDL. Virginia's Phase I Chesapeake Bay TMDL Watershed Implementation Plan (November 29, 2010), states that the wasteloads from any expansion of an existing permitted facility discharging stormwater in the Chesapeake Bay watershed cannot exceed the nutrient and sediment loadings that were discharged from the expanded portion of the land prior to the land being developed for the expanded industrial activity.

a. For any industrial activity area expansions (i.e., construction activities, including clearing, grading, and excavation activities) that begin on or after July 1, 2024, the permittee shall document in the SWPPP the information and calculations used to determine the nutrient and sediment loadings discharged from the expanded land area before the land was developed, and the measures and controls that were employed to meet the no net increase of stormwater nutrient and sediment load as a result of the expansion of the industrial activity. Any land disturbance that is exempt from permitting under the VPDES construction stormwater general permit regulation (9VAC25-880) is exempt from this requirement.

b. The permittee may use the VSMP water quality design criteria, 9VAC25-875-580, to meet the requirements of Part I B 10 a. Under this criteria, the total phosphorus load shall not exceed the greater of (i) the total phosphorus load that was discharged from the expanded portion of the land before the land being developed for the industrial activity or (ii) 0.41 pounds per acre per year. Compliance with the water quality design criteria may be determined utilizing the Virginia Runoff Reduction Method or another equivalent methodology approved by the department. Design specifications and pollutant removal efficiencies for specific BMPs can be found on the Virginia Stormwater BMP Clearinghouse website.

c. The permittee may consider utilization of any pollutant trading or offset program in accordance with §§ 62.1-44.19:20 through 62.1-44.19:23 of the Code of Virginia, governing trading and offsetting, to meet the no net increase requirement.

10. Water quality protection. The discharges authorized by this permit shall be controlled as necessary to meet applicable water quality standards. The department expects that compliance with the conditions in this permit will control discharges as necessary to meet applicable water quality standards.

11. Adding or deleting stormwater outfalls. The permittee may add new or delete existing stormwater outfalls at the facility as necessary and appropriate. The permittee shall update the SWPPP and notify the department of all outfall changes within 30 days of the change. The permittee shall submit a copy of the updated SWPPP site map with this notification.

12. Antidegradation requirements for new or increased discharges to high quality waters. Facilities that add new outfalls, or increase their discharges from existing outfalls that discharge directly to high quality waters designated under Virginia's water quality standards antidegradation policy under 9VAC25-260-30 A 2 may be notified by the department that additional control measures, or other permit conditions are necessary to comply with the applicable antidegradation requirements, or may be notified that an individual permit is required in accordance with 9VAC25-31-170 B 3.

13. Termination of permit coverage.

a. The owner may terminate coverage under this general permit by filing a notice of termination with the department. The notice of termination may be filed after one or more of the following conditions have been met:

(1) Operations have ceased at the facility and there are no longer discharges of stormwater associated with industrial activity from the facility;

(2) A new owner has assumed responsibility for the facility. A notice of termination does not have to be submitted if a VPDES Change of Ownership Agreement Form has been submitted;

(3) All stormwater discharges associated with industrial activity have been covered by an individual VPDES permit; or

(4) Termination of coverage is being requested for another reason, provided the department agrees that coverage under this general permit is no longer needed.

b. The notice of termination shall contain the following information:

(1) Owner's name, mailing address, telephone number, and email address (if available);

(2) Facility name and location;

(3) VPDES industrial stormwater general permit registration number;

(4) The basis for submitting the notice of termination, including:

(a) A statement indicating that a new owner has assumed responsibility for the facility;

(b) A statement indicating that operations have ceased at the facility, and there are no longer discharges of stormwater associated with industrial activity from the facility;

(c) A statement indicating that all stormwater discharges associated with industrial activity have been covered by an individual VPDES permit; or

(d) A statement indicating that termination of coverage is being requested for another reason and a description of the reason; and

(5) The following certification: "I certify under penalty of law that all stormwater discharges associated with industrial activity from the identified facility that are authorized by this VPDES general permit have been eliminated, or covered under a VPDES individual permit, or that I am no longer the owner of the industrial activity, or permit coverage should be terminated for another reason listed above. I understand that by submitting this notice of termination, that I am no longer authorized to discharge stormwater associated with industrial activity in accordance with the general permit, and that discharging pollutants in stormwater associated with industrial activity to surface waters is unlawful where the discharge is not authorized by a VPDES permit. I also understand that the submittal of this notice of termination does not release an owner from liability for any violations of this permit or the Clean Water Act."

c. The notice of termination shall be signed in accordance with Part II K.

d. The notice of termination shall be submitted to the DEQ regional office serving the area where the industrial facility is located.

Part II

Conditions Applicable to All VPDES Permits

A. Monitoring.

1. Samples and measurements taken as required by this permit shall be representative of the monitored activity.

2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this permit.

3. The permittee shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements.

4. Samples taken as required by this permit shall be analyzed in accordance with 1VAC30-45 (Certification for Noncommercial Environmental Laboratories) or 1VAC30-46 (Accreditation for Commercial Environmental Laboratories).

B. Records.

1. Records of monitoring information shall include:

a. The date, exact place, and time of sampling or measurements;

b. The individuals who performed the sampling or measurements;

c. The dates and times analyses were performed;

d. The individuals who performed the analyses;

e. The analytical techniques or methods used; and

f. The results of the analyses.

2. The permittee shall retain copies of the SWPPP, including any modifications made during the term of this permit, records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this permit, and records of all data used to complete the registration statement for this permit, for a period of at least three years from the date that coverage under this permit expires or is terminated. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the permittee, or as requested by the department.

C. Reporting monitoring results.

1. The permittee shall submit the results of the monitoring required by this permit not later than the 10th day of the month after monitoring takes place, unless another reporting schedule is specified elsewhere in this permit. Monitoring results shall be submitted to the department's regional office.

2. Monitoring results shall be reported in the department's electronic discharge monitoring report (e-DMR) system. All reports and forms submitted in compliance with this permit shall be submitted electronically by the permittee in accordance with 9VAC25-31-1020.

3. If the permittee monitors any pollutant specifically addressed by this permit more frequently than required by this permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in e-DMR or reporting form specified by the department.

4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this permit.

D. Duty to provide information. The permittee shall furnish to the department, within a reasonable time, any information that the department may request to determine whether cause exists for modifying, revoking and reissuing, or terminating coverage under this permit or to determine compliance with this permit. The department may require the permittee to furnish on request plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from the discharge on the quality of state waters, or other information as may be necessary to accomplish the purposes of the State Water Control Law. The permittee shall also furnish to the department on request copies of records required to be kept by this permit.

E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this permit shall be submitted no later than 14 days following each schedule date.

F. Unauthorized discharges. Except in compliance with this permit, or another permit issued by the department, it shall be unlawful for any person to:

1. Discharge into state waters sewage, industrial wastes, other wastes, or any noxious or deleterious substances; or

2. Otherwise alter the physical, chemical, or biological properties of state waters and make them detrimental to the public health, or to animal or aquatic life, or to the use of state waters for domestic or industrial consumption, for recreation, or for other uses.

G. Reports of unauthorized discharges. Any permittee who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance into or upon state waters in violation of Part II F; or who discharges or causes or allows a discharge that may reasonably be expected to enter state waters in violation of Part II F, shall notify the department of the discharge immediately upon discovery of the discharge, but in no case later than 24 hours after the discovery. A written report of the unauthorized discharge shall be submitted to the department within five days of discovery of the discharge. The written report shall contain:

1. A description of the nature and location of the discharge;

2. The cause of the discharge;

3. The date on which the discharge occurred;

4. The length of time that the discharge continued;

5. The volume of the discharge;

6. If the discharge is continuing, how long it is expected to continue;

7. If the discharge is continuing, what the expected total volume of the discharge will be; and

8. Any steps planned or taken to reduce, eliminate, and prevent a recurrence of the present discharge or any future discharges not authorized by this permit.

Discharges reportable to the department under the immediate reporting requirements of other regulations are exempted from this requirement.

H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a bypass or upset should occur from a treatment works and the discharge enters or could be expected to enter state waters, the permittee shall promptly notify, in no case later than 24 hours, the department after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The permittee shall reduce the report to writing and shall submit it to the department within five days of discovery of the discharge in accordance with Part II I 1 b. Unusual and extraordinary discharges include any discharge resulting from:

1. Unusual spillage of materials resulting directly or indirectly from processing operations;

2. Breakdown of processing or accessory equipment;

3. Failure or taking out of service some or all of the treatment works; and

4. Flooding or other acts of nature.

I. Reports of noncompliance.

1. The permittee shall report any noncompliance that may adversely affect state waters or may endanger public health.

a. A report shall be provided within 24 hours from the time the permittee becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under Part II I:

(1) Any unanticipated bypass; and

(2) Any upset that causes a discharge to surface waters.

b. A written report shall be submitted within five days and shall contain:

(1) A description of the noncompliance and its cause;

(2) The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and

(3) Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.

The department may waive the written report on a case-by-case basis for reports of noncompliance under Part II I if the oral report has been received within 24 hours and no adverse impact on state waters has been reported.

2. The permittee shall report all instances of noncompliance not reported under Part II I 1 in writing at the time the next monitoring reports are submitted. The reports shall contain the information listed in Part II I 1.

3. The immediate (within 24 hours) reports required in Part II G, H and I shall be made to the department's regional office. Reports may be made by telephone or online at https://www.deq.virginia.gov/our-programs/pollution-response. For reports outside normal working hours, the online portal shall be used. For emergencies, call the Virginia Department of Emergency Management's Emergency Operations Center (24-hours) at 1-800-468-8892.

J. Notice of planned changes.

1. The permittee shall give notice to the department as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required only when:

a. The permittee plans alteration or addition to any building, structure, facility, or installation from which there is or may be a discharge of pollutants, the construction of which began:

(1) After promulgation of standards of performance under § 306 of the Clean Water Act which are applicable to the source; or

(2) After proposal of standards of performance in accordance with § 306 of the Clean Water Act that are applicable to the source, but only if the standards are promulgated in accordance with § 306 within 120 days of their proposal;

b. The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are subject neither to effluent limitations nor to notification requirements specified elsewhere in this permit; or

c. The alteration or addition results in a significant change in the permittee's sludge use or disposal practices, and the alteration, addition, or change may justify the application of permit conditions that are different from or absent in the existing permit, including notification of additional use or disposal sites not reported during the permit application process or not reported pursuant to an approved land application plan.

2. The permittee shall give advance notice to the department of any planned changes in the permitted facility or activity that may result in noncompliance with permit requirements.

K. Signatory requirements.

1. Registration statement. All registration statements shall be signed as follows:

a. For a corporation: by a responsible corporate officer. For the purpose of this section, a responsible corporate officer means (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to ensure long-term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit registration requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;

b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or

c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this section, a principal executive officer of a public agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency.

2. Reports. All reports required by permits, and other information requested by the department shall be signed by a person described in Part II K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if:

a. The authorization is made in writing by a person described in Part II K 1;

b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity (e.g., the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company). A duly authorized representative may be a named individual or any individual occupying a named position; and

c. The written authorization is submitted to the department.

3. Changes to authorization. If an authorization under Part II K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of Part II K 2 shall be submitted to the department before or together with any reports, or information to be signed by an authorized representative.

4. Certification. Any person signing a document under Part II K 1 or 2 shall make the following certification:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

L. Duty to comply. The permittee shall comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the State Water Control Law and the Clean Water Act, except that noncompliance with certain provisions of this permit may constitute a violation of the State Water Control Law but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for permit coverage termination or denial of a permit coverage renewal.

The permittee shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards even if this permit has not yet been modified to incorporate the requirement.

M. Duty to reapply. If the permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the permittee shall submit a new registration statement at least 60 days before the expiration date of the existing permit, unless permission for a later date has been granted by the department. The department shall not grant permission for registration statements to be submitted later than the expiration date of the existing permit.

N. Effect of a permit. This permit neither conveys any property rights in either real or personal property or any exclusive privileges nor authorizes any injury to private property or invasion of personal rights, or any infringement of federal, state, or local law or regulations.

O. State law. Nothing in this permit shall be construed to preclude the institution of any legal action under, or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except as provided in permit conditions on bypassing as described in Part II U and upset as described in Part II V, nothing in this permit shall be construed to relieve the permittee from civil and criminal penalties for noncompliance.

P. Oil and hazardous substance liability. Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law.

Q. Proper operation and maintenance. The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) that are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems that are installed by the permittee only when the operation is necessary to achieve compliance with the conditions of this permit.

R. Disposal of solids or sludges. Solids, sludges, or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from the materials from entering state waters.

S. Duty to mitigate. The permittee shall take all reasonable steps to minimize or prevent any discharge or sludge use or disposal in violation of this permit which has a reasonable likelihood of adversely affecting human health or the environment.

T. Need to halt or reduce activity not a defense. It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.

U. Bypass.

1. "Bypass" means the intentional diversion of waste streams from any portion of a treatment facility. The permittee may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of Part II U 2 and 3.

2. Notice.

a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, prior notice shall be submitted, if possible at least 10 days before the date of the bypass.

b. Unanticipated bypass. The permittee shall submit notice of an unanticipated bypass as required in Part II I.

3. Prohibition of bypass.

a. Bypass is prohibited, and the department may take enforcement action against a permittee for bypass, unless:

(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage;

(2) There were no feasible alternatives to the bypass (e.g., the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime). This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and

(3) The permittee submitted notices as required under Part II U 2.

b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part II U 3 a.

V. Upset.

1. An upset constitutes an affirmative defense to an action brought for noncompliance with technology based permit effluent limitations if the requirements of Part II V 2 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review.

2. A permittee who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that:

a. An upset occurred and that the permittee can identify the causes of the upset;

b. The permitted facility was at the time being properly operated;

c. The permittee submitted notice of the upset as required in Part II I; and

d. The permittee complied with any remedial measures required under Part II S.

3. In any enforcement proceeding the permittee seeking to establish the occurrence of an upset has the burden of proof.

W. Inspection and entry. The permittee shall allow the director, or an authorized representative, including an authorized contractor acting as a representative of the administrator, upon presentation of credentials and other documents as may be required by law, to:

1. Enter on the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this permit;

2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit;

3. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this permit; and

4. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the Clean Water Act and the State Water Control Law, any substances or parameters at any location.

For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained in this general permit shall make an inspection unreasonable during an emergency.

X. Permit actions. Permit coverages may be terminated for cause. The filing of a request by the permittee for a permit termination or a notification of planned changes or anticipated noncompliance does not stay any permit condition.

Y. Transfer of permits.

1. Permits are not transferable to any person except after notice to the department.

2. Coverage under this permit may be automatically transferred to a new permittee if:

a. The current permittee notifies the department within 30 days of the transfer of the title to the facility or property, unless permission for a later date has been granted by the department;

b. The notice includes a written agreement between the existing and new permittees containing a specific date for transfer of permit responsibility, coverage, and liability between them; and

c. The department does not notify the existing permittee and the proposed new permittee of its intent to deny the new permittee coverage under the permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part II Y 2 b.

Z. Severability. The provisions of this permit are severable, and if any provision of this permit or the application of any provision of this permit to any circumstance, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.

9VAC25-151-400. Chesapeake Bay total maximum daily load compliance.

A. Chesapeake Bay TMDL Compliance. EPA's Chesapeake Bay TMDL (December 29, 2010) includes wasteload allocations for VPDES permitted industrial stormwater facilities as part of the regulated stormwater aggregate load. EPA used data submitted by Virginia with the Phase I Chesapeake Bay TMDL Watershed Implementation Plan, including the number of industrial stormwater permits per county and the number of urban acres regulated by industrial stormwater permits, as part of their development of the aggregate load. Aggregate loads for industrial stormwater facilities were appropriate because actual facility loading data were not available to develop individual facility wasteload allocations.

Virginia estimated the loadings from industrial stormwater facilities using actual and estimated facility acreage information and total phosphorus (TP) and total nitrogen (TN) loading rates from the Northern Virginia Planning District Commission (NVPDC) Guidebook for Screening Urban Nonpoint Pollution Management Strategies (Annandale, VA November 1979), prepared for the Metropolitan Washington Council of Governments. The loading rates used were as follows:

TP - High (80%) imperviousness industrial; 1.5 lb/ac/yr

TN - High (80%) imperviousness industrial; 12.3 lb/ac/yr

Actual facility area information and TP and TN data collected for facilities subject to Part V of this permit will be used by the department to quantify the nutrient and sediment loads from those VPDES permitted industrial stormwater facilities.

1. Facilities that obtained coverage under the 2019 industrial stormwater general permit that demonstrated compliance with the Chesapeake Bay TMDL loading rates.

Owners shall maintain documentation of their demonstration of compliance with the Chesapeake Bay TMDL loading rates with the SWPPP and shall continue implementing any BMPs that may have been developed as part of that demonstration.

Documentation may include:

a. Calculations submitted to the department indicating that reductions were not necessary;

b. A completed TMDL Action Plan, including a description of the means and methods, such as management practices and retrofit programs that were utilized to meet the required reductions;

c. Other means accepted by the department indicating compliance with the Chesapeake Bay TMDL loading rates.

2. Facilities that obtained coverage under the 2019 industrial stormwater general permit that did not demonstrate compliance with the Chesapeake Bay TMDL loading rates shall submit a demonstration to the department.

a. Owners of facilities that submitted a Chesapeake Bay TMDL action plan during the 2019 industrial stormwater general permit term that did not achieve reductions by the end of the 2019 permit term shall update and resubmit their action plan to the department for approval no later than 60 days following coverage under this general permit. Permittees shall achieve 10% of the remaining reductions by December 31, 2024, and all remaining reductions by December 31, 2025. An annual report shall be submitted to the department by June 30 of each year describing the progress in meeting the interim and final reductions. A final report to demonstrate compliance shall be submitted to the department no later than January 10, 2026. Documentation of compliance with the Chesapeake Bay TMDL loading rates shall be maintained with the SWPPP.

b. Owners of facilities that completed four samples for each outfall for TN and TP during the 2019 industrial stormwater general permit term that did not submit calculations by the end of the 2019 permit term shall utilize the procedures in Part V D to calculate their facility stormwater loads. The permittee shall submit a copy of the calculations, and a Chesapeake Bay TMDL action plan if required under Part V E, no later than 60 days following coverage under this general permit to the DEQ regional office serving the area where the industrial facility is located on a form provided by the department. Reductions, if applicable, shall be achieved by December 31, 2025, and an annual report shall be submitted to the department by June 30 of each year describing the progress in meeting the required reductions until such time that the demonstration is completed. The demonstration shall be submitted to the department no later than January 10, 2026. Documentation of compliance with the Chesapeake Bay TMDL loading rates shall be maintained with the SWPPP.

c. Owners of facilities registered prior to July 1, 2022, that did not complete four samples for each outfall for TN and TP by the end of the 2019 industrial stormwater general permit term shall monitor their discharges for TN and TP to characterize the contributions from their facility's specific industrial sector for these parameters. Total nitrogen is the sum of total Kjeldahl nitrogen (TKN) and nitrite + nitrate and shall be derived from the results of those tests. After the facility is granted coverage under the permit, samples shall be collected during each of the first four quarters of permit coverage. Samples shall be collected and analyzed in accordance with Part V B. Monitoring results shall be reported in accordance with Part V C and Part II C, and retained in accordance with Part II B. Calculations utilizing the procedures in Part V D, and a Chesapeake Bay TMDL action plan if required under Part V E, shall be submitted no later than 60 days following the completion of the fourth quarterly monitoring period to the DEQ regional office serving the area where the industrial facility is located on a form provided by the department. Reductions, if applicable, shall be achieved by December 31, 2025, and an annual report shall be submitted to the department by June 30 of each year describing the progress in meeting the required reductions until such time that the demonstration is completed. The demonstration shall be submitted to the department no later than January 10, 2026. Documentation of compliance with the Chesapeake Bay TMDL loading rates shall be maintained with the SWPPP.

Facilities may use the applicable sampling data collected during the 2019 industrial stormwater general permit term to satisfy all or part of the four monitoring periods requirement in accordance with Part V A 2 c.

d. Owners of facilities registered after June 30, 2022, that did not complete four samples for each outfall for TN and TP by the end of the 2019 industrial stormwater general permit term shall monitor their discharges in accordance with Part V A 3.

Facilities may use the applicable sampling data collected during the 2019 industrial stormwater general permit term to satisfy all or part of the four monitoring periods requirements in accordance with Part V A 3.

3. Facilities that obtain initial coverage under the 2024 industrial stormwater general permit, but are not newly constructed facilities as identified in 9VAC25-151-60 C 13.

Owners of facilities in the Chesapeake Bay watershed that obtain initial coverage under the 2024 industrial stormwater general permit shall monitor their discharges for TN and TP to characterize the contributions from their facility's specific industrial sector for these parameters. Total nitrogen is the sum of total Kjeldahl nitrogen (TKN) and nitrite + nitrate and shall be derived from the results of those tests. After the facility is granted coverage under the permit, samples shall be collected during each of the first four quarters of permit coverage. Samples shall be collected and analyzed in accordance with Part V B. Monitoring results shall be reported in accordance with Part V C and Part II C, and retained in accordance with Part II B. Calculations utilizing the procedures in Part V D and a Chesapeake Bay TMDL action plan if required under Part V E shall be submitted no later than 60 days following the completion of the fourth quarterly monitoring period to the DEQ regional office serving the area where the industrial facility is located on a form provided by the department. Reductions, if applicable, shall be achieved by two years following the end of the fourth quarterly monitoring period, and an annual report shall be submitted to the department by June 30 of each year describing the progress in meeting the required reductions until such time that the demonstration is completed. The demonstration shall be submitted to the department no later than the 10th of the month directly following the two year period. Documentation of compliance with the Chesapeake Bay TMDL loading rates shall be maintained with the SWPPP.

B. Monitoring instructions.

1. Collection and analysis of samples. Sampling requirements shall be assessed on an outfall by outfall basis. Samples shall be collected and analyzed in accordance with the requirements of Part II A.

2. When and how to sample. A minimum of one grab sample shall be taken from the discharge associated with industrial activity resulting from a storm event that results in a discharge from the site providing the interval from the preceding storm event discharge is at least 72 hours. The 72-hour storm interval is waived if the permittee is able to document that less than a 72-hour interval is representative for local storm events during the sampling period. In the case of snowmelt, the monitoring shall be performed at a time when a measurable discharge occurs at the site. For discharges from a stormwater management structure, the monitoring shall be performed at a time when a measurable discharge occurs from the structure.

The grab sample shall be taken during the first 30 minutes of the discharge. If it is not practicable to take the sample during the first 30 minutes, the sample may be taken during the first three hours of the discharge, provided that the permittee explains why a grab sample during the first 30 minutes was impracticable. This information shall be submitted in the department's electronic discharge monitoring report (e-DMR) system and maintained with the SWPPP. If the sampled discharge commingles with process or nonprocess water, the permittee shall attempt to sample the stormwater discharge before it mixes with the nonstormwater.

3. Storm event data. For each monitoring event, except snowmelt monitoring, along with the monitoring results, the permittee shall identify the date of the storm event sampled; rainfall total (in inches) of the storm event that generated the sampled runoff; and the interval between the storm event sampled and the end of the previous storm event discharge. For snowmelt monitoring, the permittee shall identify the date of the sampling event.

4. Monitoring periods. Quarterly monitoring shall be conducted in each of the following three-month periods: January through March, April through June, July through September, and October through December.

5. Documentation explaining a facility's inability to obtain a sample (including dates and times the outfalls were viewed or sampling was attempted), of no rain event, or of deviation from the 72-hour storm interval shall be submitted with the e-DMR and maintained with the SWPPP. Acceptable documentation includes National Climatic Data Center (NCDC) weather station data, local weather station data, facility rainfall logs, and other appropriate supporting data.

6. Representative outfalls may be used in accordance with Part I A 2 f.

C. Reporting monitoring results.

1. Reporting to the department. The permittee shall follow the reporting requirements and deadlines in Table 400-1 if required by Part V A 2 or A 3:

Table 400-1

Monitoring Reporting Requirements

Quarterly Chesapeake Bay TMDL Monitoring Submit the results by January 10, April 10, July 10, and October 10

2. Permittees shall submit results for each outfall associated with industrial activity according to the requirements of Part II C.

3. Significant digits. The permittee shall report at least the same number of significant digits as a numeric effluent limitation or TMDL wasteload allocation for a given parameter; otherwise, at least two significant digits shall be reported for a given parameter. Regardless of the rounding convention used by the permittee (i.e., five always rounding up or to the nearest even number), the permittee shall use the convention consistently and shall ensure that consulting laboratories employed by the permittee use the same convention.

D. Calculation of facility loads.

Permittees required to collect nutrient and sediment data in accordance with Part V A 2 or A 3 shall analyze the data collected to determine if pollution reductions are required. The permittee shall average the data collected at the facility for each of the pollutants of concern (POC) (e.g., TP and TN) and compare the results to the loading rates for TP and TN presented in Part V A.

The following formula may be used to determine the loading rate:

L = 0.226 x P x Pj x (0.05 + (0.9 x Ia)) x C

where:

L = the POC loading rate (lb/acre/year)

P = the annual rainfall (inches/year) - The permittee may use either actual annual average rainfall data for the facility location (in inches/year), the Virginia annual average rainfall of 44.3 inches/year, or another method approved by the department.

Pj = the fraction of annual events that produce runoff - The permittee shall use 0.9 unless the department approves another rate.

Ia = the impervious fraction of the facility impervious area of industrial activity to the facility industrial activity area.

C = the POC average concentration of all facility samples (mg/L) - Facilities with multiple outfalls shall calculate a weighted average concentration for each outfall using the drainage area of each outfall.

For total phosphorus, all daily concentration data below the quantitation level (QL) for the analytical method used shall be treated as half the QL. All daily concentration data equal to or above the QL for the analytical method used shall be treated as it is reported.

For total nitrogen, if none of the daily concentration data for the respective species (i.e., TKN, nitrate, or nitrite) are equal to or above the QL for the respective analytical methods used, the daily TN concentration value reported shall equal one half of the largest QL used for the respective species. If one of the data is equal to or above the QL, the daily TN concentration value shall be treated as that data point is reported. If more than one of the data is above the QL, the daily TN concentration value shall equal the sum of the data points as reported.

Calculations shall be submitted to the department within 60 days from the end of the last monitoring period that satisfies the monitoring requirements in Part V A 2 or A 3. Calculations shall be submitted to the DEQ regional office serving the area where the industrial facility is located, on a form provided by the department, and maintained with the facility's SWPPP.

Alternative calculations may be accepted on a case by case basis by the department to accommodate facilities with outfalls that rarely discharge.

E. Chesapeake Bay TMDL action plan requirements. For permittees required to submit calculations in accordance with Part V D, if the calculated facility loading rate for TP or TN is above the loading rates for TP or TN presented in Part V A, then the permittee shall develop and submit a Chesapeake Bay TMDL action plan to the department.

The Chesapeake Bay TMDL action plan shall be submitted on a form provided by the department to the regional office serving the area where the industrial facility is located within 60 days following the completion of the fourth quarterly monitoring period. A copy of the current Chesapeake Bay TMDL action plan and all facility loading rate calculations shall be maintained with the facility's SWPPP. The Chesapeake Bay TMDL action plan shall include:

1. A determination of the total pollutant load reductions for TP and TN (as appropriate) necessary to reduce the annual loads from industrial activities. This shall be determined by multiplying the industrial average times the difference between the TMDL loading rates listed in Part V A and the actual facility loading rates calculated in accordance with Part V D. The reduction applies to the total difference calculated for each pollutant of concern; and

2. The means and methods, such as management practices and retrofit programs that will be utilized to meet the required reductions determined in Part V E 1 and a schedule to achieve those reductions by the applicable deadline set in Part V A 2 or A 3. Pollutant reductions may be achieved using a combination of the following alternatives:

a. Reductions provided by one or more of the BMPs from the Virginia Stormwater BMP Clearinghouse listed in 9VAC25-870-65 9VAC25-875-590, approved BMPs found on the Virginia Stormwater Clearinghouse website, or BMPs approved by the Chesapeake Bay Program. Any BMPs implemented to provide the required pollutant reductions shall be incorporated in the SWPPP and be permanently maintained by the permittee;

b. Implementation of site-specific BMPs followed by a minimum of four stormwater samples collected in accordance with sampling requirements in Part V B that demonstrate pollutant loadings have been reduced below those calculated under Part V D. Any BMPs implemented to provide the required pollutant reductions shall be incorporated in the SWPPP and be permanently maintained by the permittee; or

c. Acquisition of nonpoint source credits certified by the board as perpetual in accordance with § 62.1-44.19:20 of the Code of Virginia.

9VAC25-210-60. Exclusions.

The activities in this section do not require a VWP permit but may require other permits under state and federal law. Upon request by the department, any person claiming one of these exclusions shall demonstrate to the satisfaction of the department that he qualifies for the exclusion. Exclusions pertaining to surface water withdrawals are established in 9VAC25-210-310.

1. Discharges of dredged or fill material into state waters, except wetlands, which are addressed under a USACE Regional, General, or Nationwide Permit, and for which no § 401 Water Quality Certificate is required.

2. Any discharge of stormwater from municipal separate storm sewer systems or land disturbing land-disturbing activities authorized by 9VAC25-870 9VAC25-875, or the discharge of sewage, industrial wastes, or other wastes or any noxious or deleterious substances into surface waters that is authorized by a Virginia Pollutant Discharge Elimination System (VPDES) permit in accordance with 9VAC25-31 or a Virginia Pollution Abatement (VPA) permit in accordance with 9VAC25-32.

3. Any activity governed under Chapter 13 (§ 28.2-1300 et seq.) of Title 28.2 of the Code of Virginia, unless state certification is required by § 401 of the Clean Water Act. State certification is waived if the activity meets the provisions of subdivision 10 a of this section. The activity does not require a VWP permit pursuant to § 62.1-44.15:21 G of the Code of Virginia.

4. Normal residential gardening and lawn and landscape maintenance in a wetland, or other similar activity, that is incidental to an occupant's ongoing residential use of property and is of minimal ecological impact. The criteria governing this exclusion are set forth in the definition of "normal residential gardening and lawn and landscape maintenance" in 9VAC25-210-10.

5. Maintenance of currently serviceable structures, such as purpose-built stormwater and utility structures, transportation structures, dikes, groins, levees, dams, riprap breakwaters, causeways, or bridge abutments or approaches. Maintenance includes the emergency reconstruction of recently damaged parts but does not include modifications that change the character, scope, or size of the original design. If the original design is not available, the permittee shall submit the best available information on the design for consideration and approval by the department. In order to quality for this exclusion, emergency reconstruction shall occur as soon as practicable after damage occurs.

6. Impacts to open waters that do not have a detrimental effect on public health, animal life, or aquatic life or to the uses of such waters for domestic or industrial consumption, recreation, or other uses.

7. Flooding or back-flooding impacts to surface waters resulting from the construction of temporary sedimentation basins on a construction site when such structures are necessary for erosion and sediment control or stormwater management purposes.

8. Normal agriculture and silviculture activities in a wetland such as plowing; seeding; cultivating; minor drainage and harvesting for the production of food, fiber, and forest products; or upland soil and water conservation practices.

a. To fall under this exclusion, the activities specified in this subdivision 8 must be part of an established (i.e., ongoing) agriculture or silviculture operation, and must be in accordance with applicable best management practices set forth in either Forestry Best Management Practices for Water Quality in Virginia Technical Guide (Fourth Edition, July 2002) or Virginia Agricultural BMP Manual (2000), which facilitate compliance with the § 404(b)(1) Guidelines (40 CFR Part 230). Activities on areas lying fallow as part of a conventional, rotational cycle are part of an established operation.

b. Activities which bring a new area into agricultural or silvicultural use are not part of an established operation. An operation ceases to be established when the area in which it was conducted has been converted to another use or has lain idle so long that modifications to the hydrological regime are necessary to resume operation. If the activity takes place outside surface waters, it does not need a VWP permit, whether or not it is part of an established agriculture or silviculture operation.

c. For the purposes of this subdivision 8, cultivating, harvesting, minor drainage, plowing, and seeding are defined as follows:

(1) "Cultivating" means physical methods of soil treatment employed within established agriculture and silviculture lands on farm or forest crops to aid and improve their growth, quality, or yield.

(2) "Harvesting" means physical measures employed directly upon farm, forest, or crops within established agricultural and silviculture lands to bring about their removal from farm or forest land, but does not include the construction of farm or forest roads.

(3) "Minor drainage" means:

(a) The discharge of dredged or fill material incidental to connecting upland drainage facilities to surface waters, adequate to effect the removal of excess soil moisture from upland croplands. Construction and maintenance of upland (dryland) facilities, such as ditching and tiling, incidental to the planting, cultivating, protecting, or harvesting of crops;

(b) The discharge of dredged or fill material for the purpose of installing ditching or other water control facilities incidental to planting, cultivating, protecting, or harvesting of rice, or other wetland crop species, where these activities and the discharge occur in surface waters which are in established use for such agricultural and silviculture wetland crop production;

(c) The discharge of dredged or fill material for the purpose of manipulating the water levels of, or regulating the flow or distribution of water within, existing impoundments that have been constructed in accordance with applicable requirements of the Clean Water Act, and that are in established use for the production of rice, or other wetland crop species;

(d) The discharge of dredged or fill material incidental to the emergency removal of sandbars, gravel bars, or other similar blockages which are formed during flood flows or other events, where such blockages close or constrict previously existing drainageways and, if not promptly removed, would result in damage to or loss of existing crops or would impair or prevent the plowing, seeding, harvesting, or cultivating of crops on land in established use for crop production. Such removal does not include enlarging or extending the dimensions of, or changing the bottom elevations of, the affected drainageway as it existed prior to the formation of the blockage. Removal must be accomplished within one year after such blockages are discovered in order to be eligible for exclusion; and

(e) Minor drainage in surface waters is limited to drainage within areas that are part of an established agriculture or silviculture operation. It does not include drainage associated with the immediate or gradual conversion of a wetland to a nonwetland (for example, wetland species to upland species not typically adapted to life in saturated soil conditions), or conversion from one wetland use to another (for example, silviculture to agriculture). In addition, minor drainage does not include the construction of any canal, ditch, dike, or other waterway or structure which drains or otherwise significantly modifies a stream, lake, swamp, bog, or any other wetland or aquatic area constituting surface water. Any discharge of dredged or fill material into surface water incidental to the construction of any such structure or waterway requires a VWP permit, unless otherwise excluded or exempted by this chapter.

(4) "Plowing" means all forms of primary tillage, including moldboard, chisel, or wide-blade plowing, discing, harrowing, and similar physical means used on farm or forest land for the breaking up, cutting, turning over, or stirring of soil to prepare it for the planting of crops. Plowing does not include the redistribution of soil, rock, sand, or other surficial materials in a manner which changes any area of surface water to dry land. For example, the redistribution of surface materials by blading, grading, or other means to fill in wetland areas is not plowing. Rock crushing activities which result in the loss of natural drainage characteristics, the reduction of water storage and recharge capabilities, or the overburden of natural water filtration capacities does not constitute plowing. Plowing as described above will never involve a discharge of dredged or fill material.

(5) "Seeding" means the sowing of seed and placement of seedlings to produce farm or forest crops and includes the placement of soil beds for seeds or seedlings on established farm and forest lands.

9. Discharges of dredged or fill material into wetlands when addressed under a U.S. Army Corps of Engineers Regional, General, or Nationwide Permit and that meet the provisions of subdivision 10 a of this section.

10. Construction or maintenance of farm ponds or impoundments, stock ponds or impoundments, or irrigation ditches, or the maintenance (but not construction) of drainage ditches.

a. The exclusion for the construction and maintenance of farm or stock ponds and farm or stock impoundments applies to those structures that are operated for normal agricultural or silvicultural purposes, and are less than 25 feet in height or create a maximum impoundment capacity smaller than 100 acre-feet.

b. The exclusion for the construction and maintenance of farm or stock ponds and farm or stock impoundments does not include the impacts associated with the withdrawal of surface water from, within, or behind such structures. A VWP permit may be required for the surface water withdrawal.

c. Discharge associated with siphons, pumps, headgates, wingwalls, weirs, diversion structures, and such other facilities as are appurtenant and functionally related to irrigation ditches are included in this exclusion.

d. The maintenance dredging of existing ditches is included in this exclusion provided that the final dimensions of the maintained ditch do not exceed the average dimensions of the original ditch. This exclusion does not apply to the construction of new ditches or to the channelization of streams.

11. Construction or maintenance of farm roads, forest roads, or temporary roads for moving mining equipment, where such roads are constructed and maintained in accordance with applicable best management practices (BMPs) set forth in either Forestry Best Management Practices for Water Quality in Virginia, Technical Guide, Fourth Edition, July 2002, or Virginia Agricultural BMP Manual, 2000, to ensure that flow and circulation patterns and chemical and biological characteristics of surface waters are not impaired, that the reach of such waters is not reduced, and that any adverse effect on the aquatic environment will otherwise be minimized. The BMPs which must be applied to satisfy this provision include the following baseline provisions:

a. Permanent roads (for agriculture or forestry activities), temporary access roads (for mining, forestry, or farm purposes), and skid trails (for logging) in surface waters shall be held to the minimum feasible number, width, and total length consistent with the purpose of specific agriculture, silviculture or mining operations, and local topographic and climatic conditions;

b. All roads, temporary or permanent, shall be located sufficiently far from streams or other water bodies (except for portions of such roads which must cross water bodies) to minimize discharges of dredged or fill material into surface waters;

c. The road fill shall be bridged, piped, culverted, or otherwise designed to prevent the restriction of expected flood flows;

d. The fill shall be properly stabilized and maintained to prevent erosion during and following construction;

e. Discharges of dredged or fill material into surface waters to construct road fill shall be made in a manner which minimizes the encroachment of trucks, tractors, bulldozers, or other heavy equipment within state waters (including adjacent wetlands) that lie outside the lateral boundaries of the fill itself;

f. In designing, constructing, and maintaining roads, vegetative disturbance in surface waters shall be kept to a minimum;

g. The design, construction, and maintenance of the road crossing shall not disrupt the migration or other movement of those species of aquatic life inhabiting the water body;

h. Borrow material shall be taken from upland sources whenever feasible;

i. The discharge shall not take, or jeopardize the continued existence of a state-listed or federally-listed threatened or endangered species as defined under the Endangered Species Act (16 USC § 1531 et seq.), in § 29.1-566 of the Code of Virginia and in 4VAC15-20-130 B and C, except as provided in § 29.1-568 of the Code of Virginia, or adversely modify or destroy the critical habitat of such species;

j. Discharges into the nesting and breeding areas for migratory waterfowl, spawning areas, and wetlands shall be avoided if practical on-site or off-site alternatives exist;

k. The discharge shall not be located in proximity of a public water supply or intake;

l. The discharge shall not occur in areas of concentrated shellfish production;

m. The discharge shall not occur in a component to the National Wild and Scenic River System;

n. The discharge material shall consist of suitable material free from toxic pollutants in toxic amounts; and

o. All temporary fills shall be removed in their entirety and the area restored to its original elevation.

12. Wetland and open water impacts to a stormwater management facility that was created on dry land for the purpose of conveying, treating, or storing stormwater.

9VAC25-830-40. Definitions.

The following words and terms used in this chapter have the following meanings, unless the context clearly indicates otherwise. In addition, some terms not defined herein are defined in § 62.1-44.15:68 of the Act.

"Act" means the Chesapeake Bay Preservation Act, Article 2.5 (§ 62.1-44.15:67 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

"Adaptation measure" means a project, practice, or approach to mitigate or address an impact of climate change including sea-level rise, storm surge, and flooding including increased or recurrent flooding.

"Best management practice" means a practice, or combination of practices, that is determined by a state or designated area-wide planning agency to be the most effective, practicable means of preventing or reducing the amount of pollution generated by nonpoint sources to a level compatible with water quality goals.

"Board" means the State Water Control Board. When used outside the context of the promulgation of regulations, including regulations to establish general permits, "board" means the Department of Environmental Quality.

"Buffer area" means an area of natural or established vegetation managed to protect other components of a Resource Protection Area and state waters from significant degradation due to land disturbances.

"Canopy tree" means a tree that typically reaches 35 feet in height or taller when mature.

"Chesapeake Bay Preservation Area" means any land designated by a local government pursuant to Part III (9VAC25-830-70 et seq.) of this chapter and § 62.1-44.15:74 of the Act. A Chesapeake Bay Preservation Area shall consist of a Resource Protection Area and a Resource Management Area.

"Daylighted stream" means a stream that had been previously diverted into an underground drainage system and has been redirected into an aboveground channel using natural channel design concepts as defined in § 62.1-44.15:51 of the Code of Virginia, and where the adjacent lands would meet the criteria for being designated as a Resource Protection Area (RPA) as defined by the department under this chapter.

"Department" or "DEQ" means the Department of Environmental Quality.

"Development" means the construction or substantial alteration of residential, commercial, industrial, institutional, recreation, transportation, or utility facilities or structures.

"Director" means the Director of the Department of Environmental Quality.

"Erosion and Sediment Control Law for Localities Not Administering a Virginia Erosion and Stormwater Management Program" means Article 2.4 (§ 62.1-44.15:51 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

"Floodplain" means all lands that would be inundated by flood water as a result of a storm event of a 100-year return interval.

"Highly erodible soils" means soils (excluding vegetation) with an erodibility index (EI) from sheet and rill erosion equal to or greater than eight. The erodibility index for any soil is defined as the product of the formula RKLS/T, where K is the soil susceptibility to water erosion in the surface layer; R is the rainfall and runoff; LS is the combined effects of slope length and steepness; and T is the soil loss tolerance.

"Highly permeable soils" means soils with a given potential to transmit water through the soil profile. Highly permeable soils are identified as any soil having a permeability equal to or greater than six inches of water movement per hour in any part of the soil profile to a depth of 72 inches (permeability groups "rapid" and "very rapid") as found in the "National Soil Survey Handbook" of November 1996 in the "Field Office Technical Guide" of the U.S. Department of Agriculture Natural Resources Conservation Service.

"Impervious cover" means a surface composed of any material that significantly impedes or prevents natural infiltration of water into the soil. Impervious surfaces include roofs, buildings, streets, parking areas, and any concrete, asphalt or compacted gravel surface.

"Infill" means utilization of vacant land in previously developed areas.

"Intensely Developed Areas" means those areas designated by the local government pursuant to 9VAC25-830-100.

"Local governments" means counties, cities, and towns. This chapter applies to local governments in Tidewater Virginia, as defined in § 62.1-44.15:68 of the Act, but the provisions of this chapter may be used by other local governments.

"Local program" means the measures by which a local government complies with the Act and this chapter.

"Local program adoption date" means the date a local government meets the requirements of subdivisions 1 and 2 of 9VAC25-830-60.

"Mature tree" means a canopy tree with a diameter at breast height (DBH) of 12 inches or greater or an understory tree with a DBH of four inches or greater.

"Nature-based solution" means an approach that reduces the impacts of sea-level rise, flooding and storm events through the use of environmental processes and natural systems.

"Nontidal wetlands" means those wetlands other than tidal wetlands that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions, as defined by the U.S. Environmental Protection Agency pursuant to § 404 of the federal Clean Water Act in 33 CFR 328.3b.

"Plan of development" means any process for site plan review in local zoning and land development regulations designed to ensure compliance with § 62.1-44.15:74 of the Act and this chapter, prior to issuance of a building permit.

"Public road" means a publicly owned road designed and constructed in accordance with water quality protection criteria at least as stringent as requirements applicable to the Virginia Department of Transportation, including regulations promulgated pursuant to (i) the Erosion and Sediment Control Law for Localities Not Administering a Virginia Erosion and Stormwater Management Program and (ii) the Virginia Erosion and Stormwater Management Act. This definition includes those roads where the Virginia Department of Transportation exercises direct supervision over the design or construction activities, or both, and cases where secondary roads are constructed or maintained, or both, by a local government in accordance with the standards of that local government.

"Redevelopment" means the process of developing land that is or has been previously developed.

"Resource Management Area" means that component of the Chesapeake Bay Preservation Area that is not classified as the Resource Protection Area.

"Resource Protection Area" means that component of the Chesapeake Bay Preservation Area comprised of lands adjacent to water bodies with perennial flow that have an intrinsic water quality value due to the ecological and biological processes they perform or are sensitive to impacts that may result in significant degradation to the quality of state waters.

"Silvicultural activities" means forest management activities, including the harvesting of timber, the construction of roads and trails for forest management purposes, and the preparation of property for reforestation that are conducted in accordance with the silvicultural best management practices developed and enforced by the State Forester pursuant to § 10.1-1105 of the Code of Virginia and are located on property defined as real estate devoted to forest use under § 58.1-3230 of the Code of Virginia.

"Substantial alteration" means expansion or modification of a building or development that would result in a disturbance of land exceeding an area of 2,500 square feet in the Resource Management Area only.

"Tidal shore" or "shore" means land contiguous to a tidal body of water between the mean low water level and the mean high water level.

"Tidal wetlands" means vegetated and nonvegetated wetlands as defined in § 28.2-1300 of the Code of Virginia.

"Tidewater Virginia" means those jurisdictions named in § 62.1-44.15:68 of the Act.

"Understory tree" means a tree that typically reaches 12 feet to 35 feet in height when mature.

"Use" means an activity on the land other than development including agriculture, horticulture and silviculture.

"Virginia Erosion and Stormwater Management Act" means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

"Water-dependent facility" means a development of land that cannot exist outside of the Resource Protection Area and must be located on the shoreline by reason of the intrinsic nature of its operation. These facilities include (i) ports; (ii) the intake and outfall structures of power plants, water treatment plants, sewage treatment plants, and storm sewers; (iii) marinas and other boat docking structures; (iv) beaches and other public water-oriented recreation areas; and (v) fisheries or other marine resources facilities.

9VAC25-830-130. General performance criteria.

Through their applicable land use ordinances, regulations, and enforcement mechanisms, local governments shall require that any use, development, or redevelopment of land in Chesapeake Bay Preservation Areas meets the following performance criteria:

1. No more land shall be disturbed than is necessary to provide for the proposed use or development.

2. Indigenous vegetation shall be preserved to the maximum extent practicable, consistent with the use or development proposed. Mature trees shall be protected during development and only removed where necessary, including to provide for the proposed use or development.

A locality which has an ordinance providing for the conservation, planting, and replacement of trees during the land development process pursuant to § 15.2-961 or 15.2-961.1 of the Code of Virginia may rely on such ordinance for demonstrating compliance with this requirement related to mature trees in Resource Management Areas.

3. All development exceeding 2,500 square feet of land disturbance shall be accomplished through a plan of development review process consistent with § 15.2-2286 A 8 of the Code of Virginia and subdivision 1 e of 9VAC25-830-240.

4. Land development shall minimize impervious cover consistent with the proposed use or development.

5. Any land disturbing land-disturbing activity that exceeds an area of 2,500 square feet (including construction of all single family houses, septic tanks, and drainfields, but otherwise as defined in § 62.1-44.15:24 or 62.1-44.15:51 of the Code of Virginia) shall comply with the requirements of the local erosion and sediment control program ordinance or erosion and stormwater management program ordinance. Enforcement for noncompliance with the erosion and sediment control requirements referenced in this criterion shall be conducted under the provisions of the Erosion and Sediment State Water Control Law (§ 62.1-44.2 et seq. of the Code of Virginia) and attendant regulations.

6. Any Land-disturbing activities in a Chesapeake Bay Preservation Act land-disturbing activity as defined in § 62.1-44.15:24 of the Code of Virginia Area that are equal to or greater than 2,500 square feet but less than one acre shall comply with the requirements of 9VAC25-870-51 9VAC25-875-740 and 9VAC25-870-103 9VAC25-875-750.

7. Onsite sewage treatment systems not requiring a Virginia Pollutant Discharge Elimination System (VPDES) permit shall:

a. Have pump-out accomplished for all such systems at least once every five years.

(1) If deemed appropriate by the local health department and subject to conditions the local health department may set, local governments may offer to the owners of such systems, as an alternative to the mandatory pump-out, the option of having a plastic filter installed and maintained in the outflow pipe from the septic tank to filter solid material from the effluent while sustaining adequate flow to the drainfield to permit normal use of the septic system. Such a filter should satisfy standards established in the Sewage Handling and Disposal Regulations (12VAC5-610) administered by the Virginia Department of Health.

(2) Furthermore, in lieu of requiring proof of septic tank pump-out every five years, local governments may allow owners of onsite sewage treatment systems to submit documentation every five years, certified by an operator or onsite soil evaluator licensed or certified under Chapter 23 (§ 54.1-2300 et seq.) of Title 54.1 of the Code of Virginia as being qualified to operate, maintain, or design onsite sewage systems, that the septic system has been inspected, is functioning properly, and the tank does not need to have the effluent pumped out of it.

(3) Effective July 1, 2023, requirements of this section directly related to compliance with onsite sewage system pump-outs shall be managed and enforced by the Virginia Department of Health in Accomack, Essex, Gloucester, King and Queen, King William, Lancaster, Mathews, Middlesex, Northampton, Northumberland, Richmond, and Westmoreland Counties, and the incorporated towns within those counties.

b. For new construction, provide a reserve sewage disposal site with a capacity at least equal to that of the primary sewage disposal site. This reserve sewage disposal site requirement shall not apply to any lot or parcel recorded prior to October 1, 1989, if the lot or parcel is not sufficient in capacity to accommodate a reserve sewage disposal site, as determined by the local health department. Building shall be prohibited on the area of all sewage disposal sites until the structure is served by public sewer or an onsite sewage treatment system that operates under a permit issued by the department. All sewage disposal site records shall be administered to provide adequate notice and enforcement. As an alternative to the 100% reserve sewage disposal site, local governments may offer the owners of such systems the option of installing an alternating drainfield system meeting the following conditions:

(1) Each of the two alternating drainfields in the system shall have, at a minimum, an area not less than 50% of the area that would otherwise be required if a single primary drainfield were constructed.

(2) An area equaling 50% of the area that would otherwise be required for the primary drainfield site must be reserved for subsurface absorption systems that utilize a flow diversion device, in order to provide for future replacement or repair to meet the requirements for a sewage disposal system. Expansion of the primary system will require an expansion of this reserve area.

(3) The two alternating drainfields shall be connected by a diversion valve, approved by the local health department, located in the pipe between the septic (aerobic) tank and the distribution boxes. The diversion valve shall be used to alternate the direction of effluent flow to one drainfield or the other at a time. However, diversion valves shall not be used for the following types of treatment systems:

(a) Sand mounds;

(b) Low-pressure distribution systems;

(c) Repair situations when installation of a valve is not feasible; and

(d) Any other approved system for which the use of a valve would adversely affect the design of the system, as determined by the local health department.

(4) The diversion valve shall be a three-port, two-way valve of approved materials (i.e., resistant to sewage and leakproof and designed so that the effluent from the tank can be directed to flow into either one of the two distribution boxes).

(5) There shall be a conduit from the top of the valve to the ground surface with an appropriate cover to be level with or above the ground surface.

(6) The valve shall not be located in driveways, recreational courts, parking lots, or beneath sheds or other structures.

(7) In lieu of the aforementioned diversion valve, any device that can be designed and constructed to conveniently direct the flow of effluent from the tank into either one of the two distribution boxes may be approved if plans are submitted to the local health department and found to be satisfactory.

(8) The local government shall require that the owner alternate the drainfields every 12 months to permit the yearly resting of half of the absorption system.

(9) The local government shall ensure that the owner are notified annually of the requirement to switch the valve to the opposite drainfield.

8. Land upon which agricultural activities are being conducted, including crop production, pasture, and dairy and feedlot operations, or lands otherwise defined as agricultural land by the local government, shall have a soil and water quality conservation assessment conducted that evaluates the effectiveness of existing practices pertaining to soil erosion and sediment control, nutrient management, and management of pesticides, and, where necessary, results in a plan that outlines additional practices needed to ensure that water quality protection is being accomplished consistent with the Act and this chapter.

a. Recommendations for additional conservation practices need address only those conservation issues applicable to the tract or field being assessed. Any soil and water quality conservation practices that are recommended as a result of such an assessment and are subsequently implemented with financial assistance from federal or state cost-share programs must be designed, consistent with cost-share practice standards effective in January 1999 in the "Field Office Technical Guide" of the U.S. Department of Agriculture Natural Resource Conservation Service or the June 2000 edition of the "Virginia Agricultural BMP Manual" of the Virginia Department of Conservation and Recreation, respectively. Unless otherwise specified in this section, general standards pertaining to the various agricultural conservation practices being assessed shall be as follows:

(1) For erosion and sediment control recommendations, the goal shall be, where feasible, to prevent erosion from exceeding the soil loss tolerance level, referred to as "T," as defined in the "National Soil Survey Handbook" of November 1996 in the "Field Office Technical Guide" of the U.S. Department of Agriculture Natural Resource Conservation Service. However, in no case shall erosion exceed the soil loss consistent with an Alternative Conservation System, referred to as an "ACS", as defined in the "Field Office Technical Guide" of the U.S. Department of Agriculture Natural Resource Conservation Service.

(2) For nutrient management, whenever nutrient management plans are developed, the operator or landowner must provide soil test information, consistent with the Virginia Nutrient Management Training and Certification Regulations (4VAC50-85).

(3) For pest chemical control, referrals shall be made to the local cooperative extension agent or an Integrated Pest Management Specialist of the Virginia Cooperative Extension Service. Recommendations shall include copies of applicable information from the "Virginia Pest Management Guide" or other Extension materials related to pest control.

b. A higher priority shall be placed on conducting assessments of agricultural fields and tracts adjacent to Resource Protection Areas. However, if the landowner or operator of such a tract also has Resource Management Area fields or tracts in his operation, the assessment for that landowner or operator may be conducted for all fields or tracts in the operation. When such an expanded assessment is completed, priority must return to Resource Protection Area fields and tracts.

c. The findings and recommendations of such assessments and any resulting soil and water quality conservation plans will be submitted to the local Soil and Water Conservation District Board, which will be the plan-approving authority.

9. Silvicultural activities in Chesapeake Bay Preservation Areas are exempt from this chapter provided that silvicultural operations adhere to water quality protection procedures prescribed by the Virginia Department of Forestry in the Fifth Edition (March 2011) of "Virginia's Forestry Best Management Practices for Water Quality Technical Manual." The Virginia Department of Forestry will oversee and document installation of best management practices and will monitor in-stream impacts of forestry operations in Chesapeake Bay Preservation Areas.

10. Local governments shall require evidence of all wetlands permits required by law prior to authorizing grading or other onsite activities to begin.

9VAC25-830-140. Development criteria for Resource Protection Areas.

In addition to the general performance criteria set forth in 9VAC25-830-130, the criteria in this section are applicable in Resource Protection Areas.

1. Land development may be allowed in the Resource Protection Area, subject to approval by the local government, only if it (i) is water dependent; (ii) constitutes redevelopment; (iii) constitutes development or redevelopment within a designated Intensely Developed Area; (iv) is a new use established pursuant to subdivision 4 a of this section; (v) is a road or driveway crossing satisfying the conditions set forth in subdivision 1 d of this section; or (vi) is a flood control or stormwater management facility satisfying the conditions set forth in subdivision 1 e of this section.

a. A water quality impact assessment in accordance with subdivision 6 of this section shall be required for any proposed land disturbance.

b. A new or expanded water-dependent facility may be allowed provided that the following criteria are met:

(1) It does not conflict with the comprehensive plan;

(2) It complies with the performance criteria set forth in 9VAC25-830-130;

(3) Any nonwater-dependent component is located outside of Resource Protection Areas; and

(4) Access to the water-dependent facility will be provided with the minimum disturbance necessary. Where practicable, a single point of access will be provided.

c. Redevelopment outside locally designated Intensely Developed Areas shall be permitted in the Resource Protection Area only if there is no increase in the amount of impervious cover and no further encroachment within the Resource Protection Area, and it shall conform to applicable erosion and sediment control and stormwater management criteria set forth in the Erosion and Sediment Control Law for Localities Not Administering a Virginia Erosion and Stormwater Management Program and the Virginia Erosion and Stormwater Management Act and their attendant regulations, as well as all applicable stormwater management requirements of other state and federal agencies.

d. Roads and driveways not exempt under subdivision B 1 of 9VAC25-830-150 and which, therefore, must comply with the provisions of this chapter, may be constructed in or across Resource Protection Areas if each of the following conditions is met:

(1) The local government makes a finding that there are no reasonable alternatives to aligning the road or driveway in or across the Resource Protection Area;

(2) The alignment and design of the road or driveway are optimized, consistent with other applicable requirements, to minimize (i) encroachment in the Resource Protection Area and (ii) adverse effects on water quality;

(3) The design and construction of the road or driveway satisfy all applicable criteria of this chapter, including submission of a water quality impact assessment; and

(4) The local government reviews the plan for the road or driveway proposed in or across the Resource Protection Area in coordination with local government site plan, subdivision and plan of development approvals.

e. Flood control and stormwater management facilities that drain or treat water from multiple development projects or from a significant portion of a watershed may be allowed in Resource Protection Areas provided such facilities are allowed and constructed in accordance with the Virginia Erosion and Stormwater Management Act and its attendant regulations, and provided that (i) the local government has conclusively established that location of the facility within the Resource Protection Area is the optimum location; (ii) the size of the facility is the minimum necessary to provide necessary flood control or stormwater treatment, or both; (iii) the facility must be consistent with a comprehensive stormwater management plan developed and approved in accordance with 9VAC25-870-92 9VAC25-875-660 of the Virginia Stormwater Management Program (VSMP) regulations; (iv) all applicable permits for construction in state or federal waters must be obtained from the appropriate state and federal agencies, such as the U.S. Army Corps of Engineers, the department, and the Virginia Marine Resources Commission; (v) approval must be received from the local government prior to construction; and (vi) routine maintenance is allowed to be performed on such facilities to assure that they continue to function as designed. It is not the intent of this subdivision to allow a best management practice that collects and treats runoff from only an individual lot or some portion of the lot to be located within a Resource Protection Area.

2. Exemptions in Resource Protection Areas. The following land disturbances in Resource Protection Areas may be exempt from the criteria of this part provided that they comply with subdivisions a and b of this subdivision 2: (i) water wells; (ii) passive recreation facilities such as boardwalks, trails, and pathways; and (iii) historic preservation and archaeological activities:

a. Local governments shall establish administrative procedures to review such exemptions.

b. Any land disturbance exceeding an area of 2,500 square feet shall comply with the erosion and sediment control criteria in subdivision 5 of 9VAC25-830-130.

3. Buffer area requirements. The 100-foot wide buffer area shall be the landward component of the Resource Protection Area as set forth in subdivision B 5 of 9VAC25-830-80. Notwithstanding permitted uses, encroachments, and vegetation clearing, as set forth in this section, the 100-foot wide buffer area is not reduced in width. To minimize the adverse effects of human activities on the other components of the Resource Protection Area, state waters, and aquatic life, a 100-foot wide buffer area of vegetation that is effective in retarding runoff, preventing erosion, and filtering nonpoint source pollution from runoff shall be retained if present and established where it does not exist. Where such buffer must be established, the planting of trees shall be incorporated as appropriate to site conditions and in such a manner to maximize the buffer function. Inclusion of native species in tree planting is preferred.

a. The 100-foot wide buffer area shall be deemed to achieve a 75% reduction of sediments and a 40% reduction of nutrients.

b. Where land uses such as agriculture or silviculture within the area of the buffer cease and the lands are proposed to be converted to other uses, the full 100-foot wide buffer shall be reestablished. In reestablishing the buffer, management measures shall be undertaken to provide woody vegetation that assures the buffer functions set forth in this chapter. Where such buffer must be reestablished, the planting of trees shall be incorporated as appropriate to site conditions and in such a manner to maximize the buffer function. Inclusion of native species in tree planting is preferred.

4. Permitted encroachments into the buffer area.

a. When the application of the buffer area would result in the loss of a buildable area on a lot or parcel recorded prior to October 1, 1989, encroachments into the buffer area may be allowed through an administrative process in accordance with the following criteria:

(1) Encroachments into the buffer area shall be the minimum necessary to achieve a reasonable buildable area for a principal structure and necessary utilities.

(2) Where practicable, a vegetated area that will maximize water quality protection, mitigate the effects of the buffer encroachment, and is equal to the area of encroachment into the buffer area shall be established elsewhere on the lot or parcel. Such vegetated area where established shall include the planting of trees as appropriate to site conditions. Inclusion of native species in tree planting is preferred.

(3) The encroachment may not extend into the seaward 50 feet of the buffer area.

b. When the application of the buffer area would result in the loss of a buildable area on a lot or parcel recorded between October 1, 1989, and March 1, 2002, encroachments into the buffer area may be allowed through an administrative process in accordance with the following criteria:

(1) The lot or parcel was created as a result of a legal process conducted in conformity with the local government's subdivision regulations;

(2) Conditions or mitigation measures imposed through a previously approved exception shall be met;

(3) If the use of a best management practice (BMP) was previously required, the BMP shall be evaluated to determine if it continues to function effectively and, if necessary, the BMP shall be reestablished or repaired and maintained as required; and

(4) The criteria in subdivision 4 a of this section shall be met.

5. Permitted modifications of the buffer area.

a. In order to maintain the functional value of the buffer area, existing vegetation may be removed, subject to approval by the local government, only to provide for reasonable sight lines, access paths, general woodlot management, and best management practices, including those that prevent upland erosion and concentrated flows of stormwater, as follows:

(1) Trees may be pruned or removed as necessary to provide for sight lines and vistas, provided that where removed, they shall be replaced with other vegetation that is equally effective in retarding runoff, preventing erosion, and filtering nonpoint source pollution from runoff. Mature trees shall be preserved and trimmed or pruned in lieu of removal as site conditions permit and any removal should be limited to the fewest number of trees feasible. When trees are removed to provide for sight lines and vista, they shall be replaced with trees as appropriate to site conditions and in such a manner as to maximize the buffer function and to protect the quality of state waters. Inclusion of native species in tree replanting is preferred.

(2) Any path shall be constructed and surfaced so as to effectively control erosion.

(3) Dead, diseased, or dying trees or shrubbery and noxious weeds (such as Johnson grass, kudzu, and multiflora rose) may be removed and thinning of trees may be allowed pursuant to sound horticultural practice incorporated into locally-adopted standards.

(4) For shoreline erosion control projects, trees and woody vegetation may be removed, necessary control techniques employed, and appropriate vegetation established to protect or stabilize the shoreline in accordance with the best available technical advice and applicable permit conditions or requirements. Mature trees shall be removed only as necessary for the installation and maintenance of the projects consistent with the best available technical advice project plans, and applicable permit conditions or requirements. Trees shall be utilized in the project when vegetation is being established as appropriate to the site conditions and the project specifications. Inclusion of native species in tree planting is preferred.

b. On agricultural lands the agricultural buffer area shall be managed to prevent concentrated flows of surface water from breaching the buffer area and appropriate measures may be taken to prevent noxious weeds (such as Johnson grass, kudzu, and multiflora rose) from invading the buffer area. Agricultural activities may encroach into the buffer area as follows:

(1) Agricultural activities may encroach into the landward 50 feet of the 100-foot wide buffer area when at least one agricultural best management practice which, in the opinion of the local soil and water conservation district board, addresses the more predominant water quality issue on the adjacent land—erosion control or nutrient management—is being implemented on the adjacent land, provided that the combination of the undisturbed buffer area and the best management practice achieves water quality protection, pollutant removal, and water resource conservation at least the equivalent of the 100-foot wide buffer area. If nutrient management is identified as the predominant water quality issue, a nutrient management plan, including soil tests, must be developed consistent with the Nutrient Management Training and Certification Regulations (4VAC50-85) administered by the Virginia Soil and Water Conservation Board.

(2) Agricultural activities may encroach within the landward 75 feet of the 100-foot wide buffer area when agricultural best management practices which address erosion control, nutrient management, and pest chemical control, are being implemented on the adjacent land. The erosion control practices must prevent erosion from exceeding the soil loss tolerance level, referred to as "T," as defined in the "National Soil Survey Handbook" of November 1996 in the "Field Office Technical Guide" of the U.S. Department of Agriculture Natural Resource Conservation Service. A nutrient management plan, including soil tests, must be developed, consistent with the Nutrient Management Training and Certification Regulations (4VAC50-85) administered by the Virginia Soil and Water Conservation Board. In conjunction with the remaining buffer area, this collection of best management practices shall be presumed to achieve water quality protection at least the equivalent of that provided by the 100-foot wide buffer area.

(3) The buffer area is not required to be designated adjacent to agricultural drainage ditches if at least one best management practice which, in the opinion of the local soil and water conservation district board, addresses the more predominant water quality issue on the adjacent land—either erosion control or nutrient management—is being implemented on the adjacent land.

(4) If specific problems are identified pertaining to agricultural activities that are causing pollution of the nearby water body with perennial flow or violate performance standards pertaining to the vegetated buffer area, the local government, in cooperation with soil and water conservation district, shall recommend a compliance schedule to the landowner and require the problems to be corrected consistent with that schedule. This schedule shall expedite environmental protection while taking into account the seasons and other temporal considerations so that the probability for successfully implementing the corrective measures is greatest.

(5) In cases where the landowner or the landowner's agent or operator has refused assistance from the local soil and water conservation district in complying with or documenting compliance with the agricultural requirements of this chapter, the district shall report the noncompliance to the local government. The local government shall require the landowner to correct the problems within a specified period of time not to exceed 18 months from their initial notification of the deficiencies to the landowner. The local government, in cooperation with the district, shall recommend a compliance schedule to the landowner. This schedule shall expedite environmental protection while taking into account the seasons and other temporal considerations so that the probability for successfully implementing the corrective measures is greatest.

6. Water quality impact assessment. A water quality impact assessment shall be required for any proposed development within the Resource Protection Area consistent with this part and for any other development in Chesapeake Bay Preservation Areas that may warrant such assessment because of the unique characteristics of the site or intensity of the proposed use or development.

a. The purpose of the water quality impact assessment is to identify the impacts of proposed development on water quality and lands in the Resource Protection Areas consistent with the goals and objectives of the Act, this chapter, and local programs, and to determine specific measures for mitigation of those impacts. The specific content and procedures for the water quality impact assessment shall be established by each local government. Local governments should notify the department of all development requiring such an assessment.

b. The water quality impact assessment shall be of sufficient specificity to demonstrate compliance with the criteria of the local program.

7. Buffer area requirements for Intensely Developed Areas. In Intensely Developed Areas the local government may exercise discretion regarding whether to require establishment of vegetation in the 100-foot wide buffer area. However, while the immediate establishment of vegetation in the buffer area may be impractical, local governments shall give consideration to implementing measures that would establish vegetation in the buffer in these areas over time in order to maximize water quality protection, pollutant removal, and water resource conservation. In considering such measures, local governments shall consider the planting of trees as a component of any such measure. Inclusion of native species in tree planting is preferred.

9VAC25-830-150. Nonconformities, exemptions, and exceptions.

A. Nonconforming uses and noncomplying structures.

1. Local governments may permit the continued use, but not necessarily the expansion, of any structure in existence on the date of local program adoption. Local governments may establish an administrative review procedure to waive or modify the criteria of this part for structures on legal nonconforming lots or parcels provided that:

a. There will be no net increase in nonpoint source pollutant load; and

b. Any development or land disturbance exceeding an area of 2,500 square feet complies with all erosion and sediment control requirements of this part.

2. This chapter shall not be construed to prevent the reconstruction of pre-existing structures within Chesapeake Bay Preservation Areas from occurring as a result of casualty loss unless otherwise restricted by local government ordinances.

B. Public utilities, railroads, public roads, and facilities exemptions.

1. Construction, installation, operation, and maintenance of electric, natural gas, fiber-optic, and telephone transmission lines, railroads, and public roads and their appurtenant structures in accordance with (i) regulations promulgated pursuant to the Erosion and Sediment Control Law and the Virginia Erosion and Stormwater Management Act, (ii) an erosion and sediment control plan and a stormwater management plan approved by the department, or (iii) local water quality protection criteria at least as stringent as the above state requirements will be deemed to constitute compliance with this chapter. The exemption of public roads is further conditioned on the following:

a. Optimization of the road alignment and design, consistent with other applicable requirements, to prevent or otherwise minimize (i) encroachment in the Resource Protection Area and (ii) adverse effects on water quality; and

b. Local governments may choose to exempt (i) all public roads as defined in 9VAC25-830-40, or (ii) only those public roads constructed by the Virginia Department of Transportation.

2. Construction, installation and maintenance of water, sewer, natural gas, and underground telecommunications and cable television lines owned, permitted, or both, by a local government or regional service authority shall be exempt from the criteria in this part provided that:

a. To the degree possible, the location of such utilities and facilities should be outside Resource Protection Areas;

b. No more land shall be disturbed than is necessary to provide for the proposed utility installation;

c. All such construction, installation and maintenance of such utilities and facilities shall be in compliance with all applicable state and federal permits and designed and conducted in a manner that protects water quality; and

d. Any land disturbance exceeding an area of 2,500 square feet complies with all erosion and sediment control requirements of this part.

C. Exceptions.

1. Exceptions to the requirements of 9VAC25-830-130 and 9VAC25-830-140 may be granted, provided that a finding is made that:

a. The requested exception to the criteria is the minimum necessary to afford relief;

b. Granting the exception will not confer upon the applicant any special privileges that are denied by this part to other property owners who are subject to its provisions and who are similarly situated;

c. The exception is in harmony with the purpose and intent of this part and is not of substantial detriment to water quality;

d. The exception request is not based upon conditions or circumstances that are self-created or self-imposed;

e. Reasonable and appropriate conditions are imposed, as warranted, that will prevent the allowed activity from causing a degradation of water quality; and

f. Other findings, as appropriate and required by the local government, are met.

2. Each local government shall design and implement an appropriate process or processes for the administration of exceptions. The process to be used for exceptions to 9VAC25-830-140 shall include, but not be limited to, the following provisions:

a. An exception may be considered and acted upon only by the local legislative body; the local planning commission; or a special committee, board or commission established or designated by the local government to implement the provisions of the Act and this chapter.

b. Local governments implementing this chapter through the local zoning code may provide for specific provisions that allow for consideration of exceptions that comply with subdivision 2 of this subsection.

c. The provision of subdivision 2 b of this subsection notwithstanding, no exception shall be authorized except after notice and a hearing, as required by § 15.2-2204 of the Code of Virginia, except that only one hearing shall be required. However, when giving any required notice to the owners, their agents or the occupants of abutting property and property immediately across the street or road from the property affected, the notice may be given by first-class mail rather than by registered or certified mail.

3. Exceptions to other provisions of this part may be granted, provided that:

a. Exceptions to the criteria shall be the minimum necessary to afford relief; and

b. Reasonable and appropriate conditions upon any exception granted shall be imposed, as necessary, so that the purpose and intent of the Act is preserved.

4. Notwithstanding the provisions of subdivisions 2 a through 2 c of this subsection, additions and modifications to existing legal principal structures may be processed through an administrative review process, as allowed by subsection A of this section, subject to the findings required by subdivision 1 of this subsection but without a requirement for a public hearing. This provision shall not apply to accessory structures.

9VAC25-890-1. Definitions.

The words and terms used in this chapter shall have the meanings defined in the Virginia Erosion and Stormwater Management Act (Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia) and the Virginia Erosion and Stormwater Management Program (VSMP) Regulation (9VAC25-870 9VAC25-875) unless the context clearly indicates otherwise, except that for the purposes of this chapter:

"Annual practice" means a nonstructural best management practice such as street or storm drain cleaning that reduces pollution for one compliance year upon implementation.

"Board" means the State Water Control Board. When used outside the context of the promulgation of regulations, including regulations to establish general permits, "board" means the Department of Environmental Quality.

"Date brought online" means the date when the permittee determines that a new stormwater management facility is properly functioning.

"Department" or "DEQ" means the Department of Environmental Quality.

"Ecosystem restoration projects" means practices implemented to reestablish and maintain natural systems that prevent, reduce, or remediate pollutant loadings. Examples of ecosystem restoration projects include stream restoration, shoreline restoration, land-use conversion, and reforestation.

"High-priority facilities" means facilities owned or operated by the permittee with drainage to any permitted MS4 that actively engage in one or more of the following activities: (i) composting; (ii) equipment storage, cleaning, and maintenance; (iii) long-term bulk materials storage; (iv) pesticide, herbicide, and fertilizer storage; (v) recycling; (vi) anti-icing and deicing agent storage, handling, and transfer; (vii) solid waste handling and transfer, and (viii) permittee owned or operated vehicle washing, maintenance, and salvage.

"MS4 regulated service area" or "service area" means for Phase II permittees, the drainage area served by the permittee's MS4 that is located within the 2020 census urban areas with a population of at least 50,000 or the 2000 and 2010 decennial censuses urbanized area as determined by the Bureau of the Census. MS4 regulated service area may also be referred to as "served by the MS4" as it pertains to the tables in Part II A of this permit.

"Nontraditional MS4 permittee" or "nontraditional permittee" means a government entity that operates a regulated MS4 that is not under the authority of a county board of supervisors, a city council, or a town council.

"Physically interconnected" means that one MS4 is connected to a second MS4 in such a manner that it allows for direct discharges to the second system.

"Pollutants of concern" or "POC" means pollutants specifically identified in a U.S. Environmental Protection Agency approved total maximum daily load (TMDL) report as causing a water quality impairment.

"Traditional MS4 permittee" or "traditional permittee" means a local government that operates a regulated MS4 under the authority of a county board of supervisors, a city council, or a town council.

9VAC25-890-20. Authorization to discharge.

A. Any operator covered by this general permit is authorized to discharge stormwater from the MS4 to surface waters of the Commonwealth of Virginia provided that:

1. The operator submits a complete and accurate registration statement in accordance with 9VAC25-890-30 and that registration statement is accepted by the department;

2. The operator submits any permit fees required by Part XIII VIII (9VAC25-870-700 9VAC25-875-1290 et seq.) of the Virginia Erosion and Stormwater Management Regulation;

3. The operator complies with the requirements of 9VAC25-890-40; and

4. The department has not notified the operator that the discharge is ineligible for coverage in accordance with subsection C of this section.

B. The operator is not authorized by this general permit to discharge to surface waters specifically named in other board regulations that prohibit such discharges.

C. The department will notify an operator that the discharge is not eligible for coverage under this general permit in the event of any of the following:

1. The operator is required to obtain an individual permit in accordance with 9VAC25-870-410 B 9VAC25-875-980 B;

2. The operator is proposing discharges to surface waters specifically named in other board regulations that prohibit such discharges; or

3. The operator fails to implement BMPs to reduce pollutants to the maximum extent practicable (MEP) standard to demonstrate progress toward meeting the water quality requirements as listed in 9VAC25-31-220 D 1 a in accordance with 9VAC25-31-220 K 2.

D. Nonstormwater discharges or flows into the MS4 are authorized by this state permit and do not need to be addressed in the MS4 program required under 9VAC25-890-40 Part I E 3 if:

1. The nonstormwater discharges or flows are covered by a separate individual or general VPDES or state permit for nonstormwater discharges;

2. The individual nonstormwater discharges or flows have been identified by the department as de minimis discharges that are not significant sources of pollutants to surface waters and do not require a separate VPDES permit;

3. The nonstormwater discharges or flows are identified in this subdivision and have not been identified by the operator or by the department as significant contributors of pollutants to the MS4:

a. Water line flushing, managed in a manner to avoid an instream impact;

b. Landscape irrigation;

c. Diverted stream flows;

d. Rising groundwaters;

e. Uncontaminated groundwater infiltration, as defined at 40 CFR 35.2005(20);

f. Uncontaminated pumped groundwater;

g. Discharges from potable water sources managed in a manner to avoid instream impact;

h. Foundation drains;

i. Air conditioning condensation;

j. Irrigation water;

k. Springs;

l. Water from crawl space pumps;

m. Footing drains;

n. Lawn watering;

o. Individual residential car washing;

p. Flows from riparian habitats and wetlands;

q. Dechlorinated freshwater swimming pool discharges managed in a manner to avoid instream impact;

r. Street and pavement wash waters that do not contain cleaning additives or are otherwise managed in a manner to avoid instream impact;

s. Routine external building washdown provided no soaps, solvents, or detergents are used, external building surfaces do not contain hazardous substances, and the wash water is filtered, settled, or similarly treated prior to discharge;

t. Discharges or flows from emergency firefighting activities;

u. Discharges or flows of water for fire prevention or firefighting training activities managed in a manner to avoid instream impact in accordance with § 9.1-207.1 of the Code of Virginia;

v. Discharges from noncommercial fundraising car washes if the washing uses only biodegradable, phosphate-free, water-based cleaners in accordance with § 15.2-2114.1 of the Code of Virginia; or

w. Other activities generating discharges identified by the department as not requiring VPDES authorization; or

4. The immediate discharge of materials is necessary to protect life or property as determined by fire department personnel or emergency management officials or any discharge in accordance with 9VAC25-31-40. The operator shall take or ensure that the responsible party takes all reasonable steps to minimize or prevent any adverse effect on human health or the environment. This state permit does not transfer liability for a spill itself from the party responsible for the spill to the operator nor relieve the party responsible for a spill from the reporting requirements of 40 CFR Part 117 and 40 CFR Part 302.

E. In the event the operator is unable to meet certain conditions of this permit due to circumstances beyond the operator's control, the operator shall submit a written explanation of the circumstances that prevented state permit compliance to the department in the annual report. Circumstances beyond the control of the operator include abnormal climatic conditions; weather conditions that make certain requirements unsafe or impracticable; or unavoidable equipment failures caused by weather conditions or other conditions beyond the reasonable control of the operator (operator error is not a condition beyond the control of the operator). The failure to provide adequate program funding, staffing, or equipment maintenance shall not be an acceptable explanation for failure to meet state permit conditions. The department will determine, at its sole discretion, whether the reported information will result in an enforcement action.

F. Discharges that are excluded from permitting requirements pursuant to 9VAC25-870-300 9VAC25-875-860 are exempted from the regulatory requirements of this state permit.

G. For those portions of the MS4 engaging in activities that are covered under a separate VPDES permit for discharges associated with industrial activities, the permittee shall follow the conditions established by the separate VPDES permit.

H. Upon termination of permit coverage for those activities addressed in subsection G of this section, the discharges from the outfalls previously authorized under the VPDES permit for stormwater discharges associated with industrial activities shall meet the conditions of this state permit provided it has been determined by the department that an individual MS4 permit is not required.

I. Stormwater discharges from specific MS4 permittee activities that have been granted conditional exclusion for "no exposure" of industrial activities and materials to stormwater under the separate VPDES permitting program shall comply with this state permit unless a separate VPDES permit is obtained. The department is responsible for determining compliance with the conditional exclusion under the State Water Control Law (Chapter 3.1 (§ 62.1-44.2 et seq.) of Title 62.1 of the Code of Virginia) and attendant regulations.

J. Receipt of this general permit does not relieve any permittee of the responsibility to comply with any other applicable federal, state, or local statute, ordinance, or regulation.

K. Continuation of permit coverage.

1. Any permittee that was authorized to discharge under the state permit effective November 1, 2018, and that submits a complete registration statement on or before October 1, 2023, is authorized to continue to discharge under the terms of the November 1, 2018, state permit until such time as the department either:

a. Issues coverage to the permittee under this state permit; or

b. Notifies the permittee that the discharge is not eligible for coverage under this state permit.

2. When the permittee is not in compliance with the conditions of the expiring or expired general permit, the department may choose to do any or all of the following:

a. Initiate enforcement action based upon the 2018 general permit;

b. Issue a notice of intent to deny coverage under the new general permit. If coverage under the general permit is denied, the permittee would then be required to cease the activities authorized by the continued general permit or be subject to enforcement action for operating without a state permit;

c. Issue a new state permit with appropriate conditions; or

d. Take other actions authorized by the State Water Control Law, VPDES (9VAC25-31), and VSMP (9VAC25-870) regulations the Virginia Erosion and Stormwater Management Regulation (9VAC25-875).

9VAC25-890-30. Registration statement.

A. Deadline for submitting a registration statement.

1. Operators of MS4s described under 9VAC25-870-400 9VAC25-875-970 B that are applying for initial coverage under this general permit must submit a complete registration statement to the department within 180 days of notice of designation, unless the department grants a later date.

2. In order to continue uninterrupted coverage under the general permit, operators of MS4s shall submit a new registration statement no later than October 1, 2023, unless permission for a later date has been granted by the department. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing state permit.

B. The registration statement shall include the following information:

1. The name and location of the MS4;

2. The name of the owner or operator of the MS4;

3. The mailing address of the owner or operator of the MS4;

4. The type of MS4 (e.g., city, county, incorporated town, unincorporated town, college or university, local school board, military installation, transportation system, federal or state facility, or other);

5. If the MS4 is operated under the authority of a city council or a county board of supervisors, indicate if public school facilities are included in the application.

6. The name, title, mailing address, telephone number, and email address for the following individuals:

a. The responsible official who meets the criteria established in 9VAC25-870-370 9VAC25-875-940 A 3;

b. The MS4 permit contact; and

c. The annual permit maintenance fee contact;

7. The following receiving waters information:

a. The names of the receiving surface waters to which the MS4 system discharges; and

b. Whether or not the receiving waters are listed as impaired in the Virginia 2022 305(b)/303(d) Water Quality Assessment Integrated Report;

8. The names of any physically interconnected MS4s to which the MS4 discharges;

9. A list of all existing signed agreements between the operator and any applicable third parties where the operator has entered into an agreement in order to implement minimum control measures or portions of minimum control measures;

10. For permittees previously covered under the General VPDES Permit for Discharges of Stormwater from MS4 effective November 1, 2018, whose regulated MS4 is located partially or entirely in the Chesapeake Bay watershed, a draft third phase Chesapeake Bay TMDL action plan; and

11. The following certification: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

C. The registration statement shall be signed in accordance with 9VAC25-890-40 Part IV K 4.

D. An operator may file its own registration statement, or the operator and other operators of MS4s may jointly submit a registration statement. If responsibilities for meeting the stormwater minimum control measures will be shared with other municipalities or governmental entities, the registration statement must describe which stormwater minimum control measures the operator will implement and identify the entities that will implement the other stormwater minimum control measures within the area served by the MS4.

E. The registration statement may be delivered to the DEQ Central Office, Office of VPDES Permits or by electronic mail to an electronic mailbox specified by the department. Following notification from the department of the start date for the required electronic submission of Notices of Intent to discharge forms (i.e., registration statements) as provided for in 9VAC25-31-1020, such forms submitted after that date shall be electronically submitted to the department in compliance with this section and 9VAC25-31-1020. There shall be at least three months of notice provided between the notification from the department and the date after which such forms must be submitted electronically.

9VAC25-890-40. General permit.

Any MS4 operator whose registration statement is accepted by the department will receive coverage under the following general permit and shall comply with the requirements in this general permit and be subject to all applicable requirements of the Virginia Erosion and Stormwater Management Program (VSMP) Regulations (9VAC25-870) Regulation (9VAC25-875) and the Virginia Pollutant Discharge Elimination System (VPDES) Permit Regulations (9VAC25-31).

General Permit No.: VAR04

Effective Date: November 1, 2023

Expiration Date: October 31, 2028

GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS

AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM REGULATIONS, VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM REGULATIONS, AND THE VIRGINIA STATE WATER CONTROL LAW

In compliance with the provisions of the Clean Water Act, as amended and pursuant to the State Water Control Law and regulations adopted pursuant thereto, permittees of small municipal separate storm sewer systems are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those waters specifically named in State Water Control Board regulations that prohibit such discharges.

The authorized discharge shall be in accordance with the registration statement filed with the department, this cover page, Part I - Discharge Authorization and Special Conditions, Part II - TMDL Special Conditions, Part III - DEQ BMP Warehouse Reporting, and Part IV - Conditions Applicable to All State and VPDES Permits, as set forth in this general permit.

Part I

Discharge Authorization and Special Conditions

A. Coverage under this state permit. During the period beginning with the date of coverage under this general permit and lasting until the expiration and reissuance of this state permit, the permittee is authorized to discharge stormwater and those authorized nonstormwater discharges described in 9VAC25-890-20 D in accordance with this state permit from the small municipal separate storm sewer system identified in the registration statement into surface waters within the boundaries of the Commonwealth of Virginia and consistent with 9VAC25-890-30.

B. The permittee shall develop, implement, and enforce an MS4 program designed to reduce the discharge of pollutants from the MS4 to the MEP in accordance with this permit, to protect water quality, and to satisfy the appropriate water quality requirements of the State Water Control Law and its attendant regulations. The permittee shall utilize the legal authority provided by the laws and regulations of the Commonwealth of Virginia to control discharges to and from the MS4. This legal authority may be a combination of statute, ordinance, permit, policy, specific contract language, order, or interjurisdictional agreements. The MS4 program shall include the minimum control measures (MCM) described in Part I E. For the purposes of this permit term, implementation of MCMs in Part I E and the Chesapeake Bay and local TMDL requirements in Part II (as applicable) consistent with the provisions of an iterative MS4 program required pursuant to this general permit constitutes compliance with the standard of reducing pollutants to the MEP, provides adequate progress in meeting water quality standards, and satisfies the appropriate water quality requirements of the State Water Control Law and its attendant regulations.

C. The MS4 program plan.

1. The MS4 program plan shall include, at a minimum, the following written items:

a. The roles and responsibilities of each of the permittee's divisions and departments in the implementation of the requirements of the permit tasked with ensuring that the permit requirements are met;

b. If the permittee utilizes another entity to implement portions of the MS4 program, a copy of the written agreement. The description of each party's roles and responsibilities, including any written agreements with third parties, shall be updated as necessary;

c. For each MCM in Part I E, the following information shall be included:

(1) Each specific requirement as listed in Part I E for each MCM;

(2) A description of the BMPs or strategies that the permittee anticipates will be implemented to demonstrate compliance with the permit conditions in Part I E;

(3) All standard operating procedures or policies necessary to implement the BMPs;

(4) The measurable goal by which each BMP or strategy will be evaluated; and

(5) The persons, positions, or departments responsible for implementing each BMP or strategy; and

d. A list of documents incorporated by reference, including the version and date of the document being incorporated.

2. If the permittee is receiving initial coverage under this general VPDES permit for the discharge of stormwater, the permittee shall:

a. No later than six months following the date of permit coverage, submit to the department a schedule for the development of each component of the MS4 program plan in accordance with Part I C 1 that does not exceed October 31, 2028, unless the department grants a later date; and

b. Provide to the department a copy of the MS4 program plan upon completion of development.

3. If the permittee was previously covered under the General VPDES Permit for Discharges of Stormwater from MS4 effective November 1, 2018, the permittee shall update the MS4 program plan to meet the requirements of this permit no later than six months after the effective date of this permit unless otherwise specified in another permit condition and shall post the most up-to-date version of MS4 program plan on the permittee's website or location where the MS4 program plan can be obtained as required by Part I E 2 within 30 days of updating the MS4 program plan. Until such time that the MS4 program plan is updated in accordance with Part I E, the permittee shall continue to implement the MS4 program plan in effect at the time that coverage is issued under this general permit.

4. Revisions to the MS4 program plan are expected throughout the life of this permit as part of the iterative process to reduce pollutant loading and protect water quality to the MEP. As such, revisions made in accordance with this permit as a result of the iterative process do not require modification of this permit. The permittee shall summarize revisions to the MS4 program plan as part of the annual report as described in Part I D 3.

5. The permittee may demonstrate compliance with one or more MCM in Part I E through implementation of separate statutory or regulatory programs provided that the permittee's MS4 program plan identifies and fully describes any program that will be used to satisfy one or more of the minimum control measures of Part I E. If the program that the permittee is using requires the approval of a third party, the program shall be fully approved by the third party, or the permittee shall be working toward getting full approval. Documentation of the program's approval status or the progress toward achieving full approval shall be included in the annual report required by Part I D. The permittee shall remain responsible for compliance with the permit requirements if the other entity fails to implement one or more components of the control measures.

6. The permittee may rely on another entity to satisfy the permit requirements to implement a minimum control measure if:

a. The other entity, in fact, implements the control measure;

b. The particular control measure, or component thereof, is at least as stringent as the corresponding permit requirement;

c. The other entity agrees to implement the control measure on behalf of the permittee; and

d. The agreement between the parties is documented in writing and retained by the permittee with the MS4 program plan for as long as the agreement is active.

The permittee shall remain responsible for compliance with requirements of the permit and shall document in the annual reports required in accordance with Part I D that another entity is being relied on to satisfy all or part of the state permit requirements. The permittee shall provide the information required in Part I D.

7. If the permittee relies on another governmental entity regulated under 9VAC25-870-380 9VAC25-875-950 to satisfy all of the state permit obligations, including the obligation to file periodic reports required by Part I D, the permittee must note that fact in the registration statement, but is not required to file the periodic reports. The permittee remains responsible for compliance with the state permit requirements if the other entity fails to implement the control measures or components thereof.

D. Annual reporting requirements.

1. The permittee shall submit an annual report to the department no later than October 1 of each year in a method, (i.e., how the permittee must submit) and format (i.e., how the report shall be laid out) as specified by the department; the required content of the annual report is specified in Part I E and Part II B. The report shall cover the previous year from July 1 to June 30.

2. Following notification from the department of the start date for the required electronic submission of annual reports, as provided for in 9VAC25-31-1020, such forms and reports submitted after that date shall be electronically submitted to the department in compliance with this section and 9VAC25-31-1020. There shall be at least a three-month notice provided between the notification from the department and the date after which such forms and reports must be submitted electronically.

3. The annual report shall include the following general information:

a. The permittee, system name, and permit number;

b. The reporting period for which the annual report is being submitted;

c. A signed certification as per Part IV K;

d. Each annual reporting item as specified in an MCM in Part I E; and

e. An evaluation of the MS4 program implementation, including a review of each MCM, to determine the MS4 program's effectiveness and whether or not changes to the MS4 program plan are necessary.

4. For permittees receiving initial coverage under this general VPDES permit for the discharge of stormwater, the annual report shall include a status update on each component of the MS4 program plan being developed. Once the MS4 program plan has been updated to include implementation of a specific MCM in Part I E, the permittee shall follow the reporting requirements established in Part I D 3.

5. For those permittees with requirements established under Part II B, the annual report shall include a status report on the implementation of the local TMDL action plans in accordance with Part II B including any revisions to the plan.

6. For the purposes of this permit, the MS4 program plan, annual reports, the Chesapeake Bay TMDL action plan, and Chesapeake Bay TMDL implementation annual status reports shall be maintained as separate documents and submitted to the department as required by this permit as separate documents.

E. Minimum control measures.

1. Public education and outreach.

a. The permittee shall implement a public education and outreach program designed to:

(1) Increase the public's knowledge of how to reduce stormwater pollution, placing priority on reducing impacts to impaired waters and other local water pollution concerns;

(2) Increase the public's knowledge of hazards associated with illegal discharges and improper disposal of waste, including pertinent legal implications; and

(3) Implement a diverse program with strategies that are targeted toward individuals or groups most likely to have significant stormwater impacts.

b. The permittee shall identify no fewer than three high-priority stormwater issues to meet the goal of educating the public in accordance with Part I E 1 a. High-priority issues may include the following examples: Chesapeake Bay nutrients, pet wastes, local receiving water impairments, TMDLs, high-quality receiving waters, litter control, BMP maintenance, anti-icing and deicing agent application, planned green infrastructure redevelopment, planned ecosystem restoration projects, and illicit discharges from commercial sites.

c. The high-priority public education and outreach program, as a whole, shall:

(1) Clearly identify the high-priority stormwater issues;

(2) Explain the importance of the high-priority stormwater issues;

(3) Include measures or actions the public can take to minimize the impact of the high-priority stormwater issues; and

(4) Provide a contact and telephone number, website, or location where the public can find out more information.

d. The permittee shall use two or more of the strategies listed in Table 1 per year to communicate to the target audience the high-priority stormwater issues identified in accordance with Part I E 1 b, including how to reduce stormwater pollution.

Table 1

Strategies for Public Education and Outreach

Strategies

Examples (provided as examples and are not meant to be all inclusive or limiting)

Traditional written materials

Informational brochures, newsletters, fact sheets, utility bill inserts, or recreational guides for targeted groups of citizens

Alternative materials

Bumper stickers, refrigerator magnets, t-shirts, or drink koozies

Signage

Temporary or permanent signage in public places or facilities, vehicle signage, bill boards billboards, or storm drain stenciling

Media materials

Information disseminated through electronic media, radio, televisions, movie theater, newspaper, or GIS story maps

Speaking engagements

Presentations to school, church, industry, trade, special interest, or community groups

Curriculum materials

Materials developed for school-aged children, students at local colleges or universities, or extension classes offered to local citizens

Training materials

Materials developed to disseminate during workshops offered to local citizens, trade organization, or industrial officials

Public education activities

Booth at community fair, demonstration of stormwater control projects, presentation of stormwater materials to schools to meet applicable education Standards of Learning or curriculum requirements, or watershed walks

Public meetings

Public meetings on proposed community stormwater management retrofits, green infrastructure redevelopment, ecosystem restoration projects, TMDL development, climate change's effects on stormwater management, voluntary residential low impact development, or other stormwater issues

e. The permittee may coordinate its public education and outreach efforts with other MS4 permittees; however, each permittee shall be individually responsible for meeting all of its state permit requirements.

f. The MS4 program plan shall include:

(1) A list of the high-priority stormwater issues the permittee will communicate to the public as part of the public education and outreach program;

(2) The rationale for selection of each high-priority stormwater issue and an explanation of how each education or outreach strategy is intended to have a positive impact on stormwater discharges;

(3) Identification of the target audience to receive each high-priority stormwater message;

(4) Nontraditional permittees may identify staff, students, members of the general public, and other users of facilities operated by the permittee as the target audience for education and outreach strategies;

(5) Traditional permittees may identify staff and students as part of the target audience for education and outreach strategies; however, staff shall not be the majority of the target audience;

(6) Staff training required in accordance with Part I E 6 d does not qualify as a strategy for public education and outreach;

(7) The strategies from Table 1 of Part I E 1 d to be used to communicate each high-priority stormwater message; and

(8) The anticipated time periods the messages will be communicated or made available to the public.

g. The annual report shall include the following information:

(1) A list of the high-priority stormwater issues the permittee addressed in the public education and outreach program;

(2) A summary of the public education and outreach activities conducted for the report year, including the strategies used to communicate the identified high-priority issues;

(3) A description of any changes in high-priority stormwater issues, including, strategies used to communicate high-priority stormwater issues or target audiences for the public education and outreach plan. The permittee shall provide a rationale for any of these changes; and

(4) A description of public education and outreach activities conducted that included education regarding climate change.

2. Public involvement and participation.

a. The permittee shall develop and implement procedures for the following:

(1) The public to report potential illicit discharges, improper disposal, or spills to the MS4, complaints regarding land disturbing land-disturbing activities, or other potential stormwater pollution concerns;

(2) The public to provide comments on the permittee's MS4 program plan;

(3) Responding to public comments received on the MS4 program plan; and

(4) Maintaining documentation of public comments received on the MS4 program and associated MS4 program plan and the permittee's response.

b. No later than three months after this permit's effective date, the existing permittee shall update and maintain the webpage dedicated to the MS4 program and stormwater pollution prevention. The following information shall be posted on this webpage:

(1) The effective MS4 permit and coverage letter;

(2) The most current MS4 program plan or location where the MS4 program plan can be obtained;

(3) The annual report for each year of the term covered by this permit no later than 30 days after submittal to the department;

(4) For permittees whose regulated MS4 is located partially or entirely in the Chesapeake Bay watershed, the most current Chesapeake Bay TMDL action plan or location where the Chesapeake Bay TMDL action plan can be obtained;

(5) For permittees whose regulated MS4 is located partially or entirely in the Chesapeake Bay watershed, the Chesapeake Bay TMDL implementation annual status reports for each year of the term covered by this permit no later than 30 days after submittal to the department;

(6) A mechanism for the public to report potential illicit discharges, improper disposal, or spills to the MS4, complaints regarding land disturbing land-disturbing activities, or other potential stormwater pollution concerns in accordance with Part I E 2 a (1);

(7) Methods for how the public can provide comments on the permittee's MS4 program plan in accordance with Part I E 2 a (2) and if applicable, the Chesapeake Bay TMDL action plan in accordance with Part II A 13; and

(8) Federal and state nontraditional permittees with security policies preventing a MS4 program and stormwater pollution prevention webpage from being publicly accessible may utilize an internal staff accessible webpage such as an intranet webpage to meet the requirements of Part 1 E 2 b.

c. Traditional permittees shall implement no fewer than four activities per year from two or more of the categories listed in Table 2 to provide an opportunity for public involvement to improve water quality and support local restoration and clean-up projects.

d. Nontraditional permittees shall implement, promote, participate in, or coordinate on no fewer than four activities per year from two or more of the categories listed in Table 2 to provide an opportunity for public involvement to improve water quality and support local restoration and clean-up projects.

Table 2

Public Involvement Opportunities

Public involvement opportunities

Examples (provided as example and are not meant to be all inclusive or limiting)

Monitoring

Establish or support citizen monitoring group

Restoration

Stream, watershed, shoreline, beach, or park clean-up day, adopt-a-waterway program, tree plantings, and riparian buffer plantings

Public education activities

Booth at community fair, demonstration of stormwater control projects, climate change's effects on stormwater management, presentation of stormwater materials to schools to meet applicable education Standards of Learning or curriculum requirements, or watershed walks

Public meetings

Public meetings on proposed community stormwater management retrofits, green infrastructure redevelopment, ecosystem restoration projects, TMDL development, voluntary residential low impact development, climate change's effects on stormwater management, or other stormwater issues

Disposal or collection events

Household hazardous chemicals collection, vehicle fluids collection

Pollution prevention

Adopt-a-storm drain program, implement a storm drain marking program, promote use of residential stormwater BMPs, implement pet waste stations in public areas, adopt-a-street program.

e. The permittee may coordinate the public involvement opportunities listed in Table 2 with other MS4 permittees; however, each permittee shall be individually responsible for meeting all of the permit requirements.

f. The permittee may include staff and students in public participation events; however, the activity cannot solely include or be limited to staff participants with stormwater, groundskeeping, and maintenance duties in order for an event to qualify as a public participation event.

g. Staff training required in accordance with Part I E 6 d does not qualify as a public participation event unless the training activity solicits participation from target audiences beyond staff or contractors with stormwater, groundskeeping, and maintenance duties.

h. The MS4 program plan shall include:

(1) The webpage address where mechanisms for the public to report (i) potential illicit discharges, improper disposal, or spills to the MS4, (ii) complaints regarding land disturbing land-disturbing activities, or (iii) other potential stormwater pollution concerns;

(2) The webpage address that contains the methods for how the public can provide input on the permittee's MS4 program; and

(3) A description of the public involvement activities to be implemented by the permittee, the anticipated time period the activities will occur, and a metric for each activity to determine if the activity is beneficial to water quality. An example of metrics may include the weight of trash collected from a stream cleanup or the number of participants in a hazardous waste collection event.

i. The annual report shall include the following information:

(1) A summary of any public comments on the MS4 program received and how the permittee responded;

(2) A summary of stormwater pollution complaints received under the procedures established in Part I E 2 a (1), excluding natural flooding complaints, and how the permittee responded;

(3) A webpage address to the permittee's MS4 program and stormwater website;

(4) Federal and state nontraditional permittees with security policies preventing the MS4 program and stormwater pollution prevention webpage from being publicly accessible utilizing an internal staff accessible website, such as intranet, shall provide evidence of the current internal MS4 program and stormwater pollution prevention webpage;

(5) A description of the public involvement activities implemented by the permittee, including any efforts to reach out and engage all economic and ethnic groups;

(6) A description of public education and outreach activities conducted that also included education regarding climate change;

(7) A report of the metric as defined for each activity and an evaluation as to whether or not the activity is beneficial to improving water quality; and

(8) The name of other MS4 permittees with whom the permittee collaborated in the public involvement opportunities.

3. Illicit discharge detection and elimination.

a. The permittee shall develop and maintain an accurate MS4 map and information table as follows:

(1) An updated map of the MS4 owned or operated by the permittee within the MS4 regulated service area no later than 24 months after the permit effective date that includes, at a minimum:

(a) MS4 outfalls discharging to surface waters, except as follows:

(i) In cases where the outfall is located outside of the MS4 permittee's legal responsibility, the permittee may elect to map the known point of discharge location closest to the actual outfall; and

(ii) In cases where the MS4 outfall discharges to receiving water channelized underground, the permittee may elect to map the point downstream at which the receiving water emerges above ground as an outfall discharge location. If there are multiple outfalls discharging to an underground channelized receiving water, the map shall identify that an outfall discharge location represents more than one outfall. This is an option a permittee may choose to use and recognizes the difficulties in accessing outfalls to underground channelized stream conveyances for purposes of mapping, screening, or monitoring;

(b) A unique identifier for each mapped item required in Part I E 3;

(c) The name and location of receiving waters to which the MS4 outfall or point of discharge discharges;

(d) MS4 regulated service area; and

(e) Stormwater management facilities owned or operated by the permittee.

(2) The permittee shall maintain an outfall information table associated with the MS4 map that includes the following information for each outfall or point of discharge for those cases in which the permittee elects to map the known point of discharge in accordance with Part I E 3 a (1) (a). The outfall information table may be maintained as a shapefile attribute table. The outfall information table shall contain the following:

(a) A unique identifier as specified on the MS4 map;

(b) The latitude and longitude of the outfall or point of discharge;

(c) The estimated regulated acreage draining to the outfall or point of discharge;

(d) The name of the receiving water;

(e) The 6th Order Hydrologic Unit Code of the receiving water;

(f) An indication as to whether the receiving water is listed as impaired in the Virginia 2022 305(b)/303(d) Water Quality Assessment Integrated Report; and

(g) The name of any EPA approved TMDLs for which the permittee is assigned a wasteload allocation.

(3) No later than 24 months after permit issuance, the permittee shall submit to DEQ, a format file geodatabase or two shapefiles that contain at a minimum:

(a) A point feature class or shapefile for outfalls with an attribute table containing outfall data elements required in accordance with Part I E 3 a (2); and

(b) A polygon feature class or shapefile for the MS4 service area as required in accordance with Part I E 3 a (1) (d) with an attribute table containing the following information:

(i) MS4 operator name;

(ii) MS4 permit number (VAR04); and

(iii) MS4 service area total acreage rounded to the nearest hundredth.

(4) All file geodatabase feature classes or shapefiles shall be submitted in the following data format standards:

(a) Point data in NAD83 or WGS84 decimal degrees global positional system coordinates;

(b) Data projected in Virginia Lambert Conformal Conic format;

(c) Outfall location accuracy shall be represented in decimal degrees rounded to at least the fifth decimal place for latitude and longitude to ensure point location accuracy (e.g., 37.61741, -78.15279); and

(d) Metadata that shall provide a description of each feature class or shapefile dataset, units of measure as applicable, coordinate system, and projection.

(5) No later than October 1 of each year, the permittee shall update the MS4 map and outfall information table to include any new outfalls constructed or TMDLs approved or both during the immediate preceding reporting period.

(6) The permittee shall provide written notification to any downstream adjacent MS4 of any known physical interconnection established or discovered after the effective date of this permit.

b. The permittee shall prohibit, through ordinance, policy, standard operating procedures, or other legal mechanism, to the extent allowable under federal, state, or local law, regulations, or ordinances, unauthorized nonstormwater discharges into the MS4. Nonstormwater discharges or flows identified in 9VAC25-890-20 D 3 shall only be addressed if they are identified by the permittee as a significant contributor of pollutants discharging to the MS4. Flows that have been identified by the department as de minimis discharges are not significant sources of pollutants to surface water.

c. The permittee shall maintain, implement, and enforce illicit discharge detection and elimination (IDDE) written procedures designed to detect, identify, and address unauthorized nonstormwater discharges, including illegal dumping, to the MS4 to effectively eliminate the unauthorized discharge. Written procedures shall include:

(1) A description of the legal authorities, policies, standard operating procedures, or other legal mechanisms available to the permittee to eliminate identified sources of ongoing illicit discharges, including procedures for using legal enforcement authorities.

(2) Dry weather field screening protocols to detect, identify, and eliminate illicit discharges to the MS4. The protocol shall include:

(a) A prioritized schedule of field screening activities and rationale for prioritization determined by the permittee based on such criteria as age of the infrastructure, land use, historical illegal discharges, dumping, or cross connections;

(b) If the total number of MS4 outfalls is equal to or less than 50, a schedule to screen all outfalls annually;

(c) If the total number of MS4 outfalls is greater than 50, a schedule to screen a minimum of 50 outfalls annually such that no more than 50% are screened in the previous 12-month period. The 50% criteria is not applicable if all outfalls have been screened in the previous three years;

(d) The permittee may adopt a risk-based approach to dry weather screening identifying observation points based upon illicit discharge risks upstream of an outfall. Observation points may include points of interconnection, manholes, points of discharge, conveyances, or inlets suspected to have a high likelihood of receiving illicit discharges;

(e) Each observation point screened may be counted as one outfall screening activity equivalent and counted towards the requirements of Part I E 3 c (2) (b) or (2) (c); however, at least 50% of the minimum annual screening events must include outfall screening;

(f) Illicit discharges reported by the public and subsequent investigations may not be counted as screening events; however once the resolution of the investigation and the date the investigation was closed has been documented, an observation point may be established for future screening events; and

(g) A checklist or mechanism to track the following information for dry weather screening events:

(i) The unique identifier for the outfall or observation point;

(ii) Time since the last precipitation event;

(iii) The estimated quantity of the last precipitation event;

(iv) Site descriptions (e.g., conveyance type and dominant watershed land uses);

(v) Observed indicators of possible illicit discharge events, such as floatables, deposits, stains, and vegetative conditions (e.g., dying or dead vegetation, excessive vegetative growth);

(vi) Whether or not a discharge was observed;

(vii) If a discharge was observed, the estimated discharge rate and visual characteristics of the discharge (e.g., odor, color, clarity) and the physical condition of the outfall; and

(viii) For observation points, the location, downstream outfall unique identifier, and risk factors or rationale for establishing the observation point.

(3) A timeframe upon which to conduct an investigation to identify and locate the source of any observed unauthorized nonstormwater discharge. Priority of investigations shall be given to discharges of sanitary sewage and those believed to be a risk to human health and public safety. Discharges authorized under a separate VPDES or state permit require no further action under this permit.

(4) Methodologies to determine the source of all illicit discharges. If the permittee is unable to identify the source of an illicit discharge within six months of beginning the investigation, then the permittee shall document that the source remains unidentified. If the observed discharge is intermittent, the permittee shall document that attempts to observe the discharge flowing were unsuccessful.

(5) Methodologies for conducting a follow-up investigation for illicit discharges that are continuous or that permittees expect to occur more frequently than a one-time discharge to verify that the discharge has been eliminated except as provided for in Part I E 3 c (4);

(6) A mechanism to track all illicit discharge investigations to document the following:

(a) The dates that the illicit discharge was initially observed, reported, or both;

(b) The results of the investigation, including the source, if identified;

(c) Any follow-up to the investigation;

(d) Resolution of the investigation; and

(e) The date that the investigation was closed.

d. The MS4 program plan shall include:

(1) The MS4 map and outfall information table required by Part I E 3 a. The map and outfall information table may be incorporated into the MS4 program plan by reference. The map shall be made available to the department within 14 days upon request;

(2) Copies of written notifications of physical interconnections given by the permittee to other MS4s; and

(3) The IDDE procedures described in Part I E 3 c.

e. The annual report shall include:

(1) A confirmation statement that the MS4 map and outfall information table have been updated to reflect any changes to the MS4 occurring on or before June 30 of the reporting year;

(2) The total number of outfalls and observation points screened during the reporting period as part of the dry weather screening program; and

(3) A list of illicit discharges to the MS4, including spills reaching the MS4 with information as follows:

(a) The location and source of illicit discharge;

(b) The dates that the discharge was observed, reported, or both;

(c) Whether the discharge was discovered by the permittee during dry weather screening, reported by the public, or other method (describe);

(d) How the investigation was resolved;

(e) A description of any follow-up activities; and

(f) The date the investigation was closed.

4. Construction site stormwater runoff and erosion and sediment control.

a. The permittee shall utilize its legal authority, such as ordinances, permits, orders, specific contract language, and interjurisdictional agreements, to address discharges entering the MS4 from regulated construction site stormwater runoff. The permittee shall control construction site stormwater runoff as follows:

(1) If the traditional permittee is a city, county, or town that has adopted a Virginia Erosion and Sediment Control Stormwater Management Program (VESCP VESMP), the permittee shall implement the VESCP VESMP consistent with the Virginia Erosion and Sediment Control Law (§ 62.1-44.15:51 Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and Virginia Erosion and Sediment Control Regulations (9VAC25-840) Stormwater Management Regulation (9VAC25-875);

(2) If the traditional permittee is a town that has not adopted a VESCP, implementation is required to adopt and administer a VESMP, the town may, pursuant to § 62.1-44.15:27 C of the Code of Virginia, enter into an agreement with the county the town lies within to become subject to the county's VESMP. If a town lies within the boundaries of more than one county, it may enter into an agreement with any of those counties that operates a VESMP. Implementation of a VESCP VESMP, consistent with the Virginia Erosion and Sediment Control Law (§ 62.1-44:15:51 et seq. of the Code of Virginia) Stormwater Management Act and Virginia Erosion and Sediment Control Regulations (9VAC25-840) Stormwater Management Regulation by the surrounding county shall constitute compliance with Part I E 4 a; such town shall notify the surrounding county of erosion, sedimentation, or other construction stormwater runoff problems;

(3) If the nontraditional permittee is a state agency; public institution of higher education, including community colleges, colleges, and universities; or federal entity and has developed standards and specifications in accordance with the Virginia Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq. of the Code of Virginia) Stormwater Management Act and Virginia Erosion and Sediment Control Regulations (9VAC25-840) Stormwater Management Regulation, the permittee shall implement the most recent department approved standards and specifications; or

(4) If the nontraditional permittee is a state agency; public institution of higher education, including community colleges, colleges, and universities; or federal entity and has not developed standards and specifications in accordance with the Virginia Erosion and Sediment Control Law (§ 62.1-44.15:51 et seq. of the Code of Virginia) Stormwater Management Act and Virginia Erosion and Sediment Control Regulations (9VAC25-840) Stormwater Management Regulation, the permittee shall inspect all land disturbing land-disturbing activities as defined in § 62.1-44.15:51 62.1-44.15:24 of the Code of Virginia that result in the disturbance of 10,000 square feet or greater, or 2,500 square feet or greater in accordance with areas designated under the Chesapeake Bay Preservation Act, as follows:

(a) During or immediately following initial installation of erosion and sediment controls;

(b) At least once per every two-week period;

(c) Within 48 hours following any runoff producing storm event; and

(d) At the completion of the project prior to the release of any performance bond.

(5) If the nontraditional permittee is a school board or other local government body, the permittee shall inspect those projects resulting in a land disturbance as defined in § 62.1-44.15.51 62.1-44.15:24 of the Code of Virginia occurring on lands owned or operated by the permittee that result in the disturbance of 10,000 square feet or greater, 2,500 square feet or greater in accordance with areas designated under the Chesapeake Bay Preservation Act, or in accordance with more stringent thresholds established by the local government, as follows:

(a) During or immediately following initial installation of erosion and sediment controls;

(b) At least once per every two-week period;

(c) Within 48 hours following any runoff producing storm event; and

(d) At the completion of the project prior to the release of any performance bond.

b. The permittee shall require implementation of appropriate controls to prevent nonstormwater discharges to the MS4, such as wastewater, concrete washout, fuels and oils, and other illicit discharges identified during land disturbing land-disturbing activity inspections. The discharge of nonstormwater discharges other than those identified in 9VAC25-890-20 D through the MS4 is not authorized by this state permit.

c. Employees and contractors serving as plan reviewers, inspectors, program administrators, and construction site operators shall obtain the appropriate certifications as required under the Virginia Erosion and Sediment Control Law Stormwater Management Act and its attendant regulations;

d. The permittee's MS4 program plan shall include:

(1) If the permittee implements an erosion and sediment control program a VESMP for construction site stormwater runoff in accordance with Part I E 4 a (1), the local ordinance citations for the VESCP program VESMP;

(2) If the permittee is a town that does not implement an erosion and sediment control stormwater management program for construction site stormwater runoff in accordance with Part I E 4 a (2), the county ordinance citations for the VESCP VESMP program the town is subject to;

(3) If the permittee implements annual standards and specifications for erosion and sediment control and construction site stormwater runoff in accordance with Part I E 4 a (3):

(a) The most recently approved standards and specifications or if incorporated by reference, the location where the standards and specifications can be viewed; and

(b) A copy of the most recent standards and specifications approval letter from the department;

(4) A description of the legal authorities utilized to ensure compliance with Part I E 4 a for erosion and sediment control and construction site stormwater runoff control, such as ordinances, permits, orders, specific contract language, policies, and interjurisdictional agreements;

(5) For traditional permittees, written inspection procedures to ensure VESCP construction site stormwater runoff and erosion and sediment control requirements are maintained in accordance with 9VAC25-840-90 A 9VAC25-875-190 and onsite erosion and sediment controls are properly implemented in accordance with 9VAC25-840-60 B 9VAC25-875-140;

(6) For nontraditional permittees, erosion and sediment control plans or annual standards and specifications shall be approved by the department in accordance with § 62.1-44.15:55 62.1-44.15:34 or 62.1-44.15:31, respectively, of the Code of Virginia. Compliance with approved erosion and sediment control plans or annual standards and specifications shall be ensured by the permittee with written inspection procedures that at minimum include the following:

(a) An inspection checklist for documenting onsite erosion and sediment control structures and systems are properly maintained and repaired as needed to ensure continued performance of their intended function; and

(b) A list of all associated documents utilized for inspections, including checklists, department approved erosion and sediment control plans, or the most recently department approved annual standards and specifications, and any other documents utilized;

(7) Traditional permittees shall maintain written procedures for requiring VESCP compliance through corrective action or enforcement action in accordance with § 62.1-44.15:58 the State Water Control Law (§ 62.1-44.2 et seq. of the Code of Virginia);

(8) Nontraditional permittees shall maintain written procedures for requiring compliance with department approved erosion and sediment control plans and annual standards and specifications through corrective action or enforcement action to the extent allowable under federal, state, or local law, regulation, ordinance, or other legal mechanisms; and

(9) The roles and responsibilities of each of the permittee's departments, divisions, or subdivisions in implementing erosion and sediment control and construction site stormwater runoff control requirements in Part I E 4.

e. The annual report shall include the following:

(1) Total number of erosion and sediment control inspections conducted;

(2) Total number of each type of compliance action and enforcement action implemented; and

(3) For nontraditional permittees:

(a) A confirmation statement that land disturbing land-disturbing projects that occurred during the reporting period have been conducted in accordance with the current department approved annual standards and specifications for erosion and sediment control; and

(b) If any land disturbing land-disturbing projects were conducted without department approved annual standards and specifications, a list of all land disturbing land-disturbing projects that occurred during the reporting period with erosion and sediment control plan approval dates for each project.

5. Post-construction stormwater management for new development and development on prior developed lands.

a. The permittee shall address post-construction stormwater runoff that enters the MS4 from the following land disturbing land-disturbing activities by implementing a post-construction stormwater runoff management program as follows:

(1) If the traditional permittee is a city, county, or town, with an approved Virginia Erosion and Stormwater Management Program (VSMP) (VESMP), the permittee shall implement the VSMP VESMP consistent with the Virginia Erosion and Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and VSMP Regulations (9VAC25-870) Virginia Erosion and Stormwater Management Regulation as well as maintain an inspection and maintenance program in accordance with Part I E 5 b and c;

(2) If the traditional permittee is a town that has not adopted a VSMP VESMP, entering into an agreement for the implementation of a VSMP VESMP consistent with the Virginia Erosion and Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and VSMP Regulations (9VAC25-870) Virginia Erosion and Stormwater Management Regulation by the surrounding county shall constitute compliance with Part I E 5 a; such town shall notify the surrounding county of erosion, sedimentation, or other post-construction stormwater runoff problems and maintain an inspection and maintenance program in accordance with Part I E 5 c and d;

(3) If the traditional permittee is a city, county, or town receiving initial permit coverage during the permit term and must obtain VSMP VESMP approval from the department, the permittee shall implement the VSMP VESMP consistent with the Virginia Erosion and Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and VSMP Regulations (9VAC25-870) Virginia Erosion and Stormwater Management Regulation as well as develop an inspection and maintenance program in accordance with Part I E 5 b and c no later than 60 months after receiving permit coverage;

(4) If the nontraditional permittee is a state agency; public institution of higher education, including community colleges, colleges, and universities; or federal entity and has not developed standards and specifications in accordance with the Virginia Erosion and Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and VSMP Regulations (9VAC25-870) Virginia Erosion and Stormwater Management Regulation, the permittee shall implement the most recent department approved standards and specifications and maintain an inspection and maintenance program in accordance with Part I E 5 b;

(5) If the nontraditional permittee is a state agency; public institution of higher education, including community colleges, colleges, and universities; or federal entity, and has not developed standards and specifications in accordance with the Virginia Erosion and Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and VSMP Regulations (9VAC25-870) Virginia Erosion and Stormwater Management Regulation, the permittee shall implement a post-construction stormwater runoff control program through compliance with 9VAC25-870 9VAC25-875 and with the implementation of a maintenance and inspection program consistent with Part I E 5 b no later than 60 months after receiving permit coverage; or

(6) If the nontraditional permittee is a school board or other local government body, the permittee shall implement a post-construction stormwater runoff control program through compliance with 9VAC25-870 9VAC25-875 or in accordance with more stringent local requirements, if applicable, and with the implementation of a maintenance and inspection program consistent with Part I E 5 b.

b. The permittee shall implement an inspection and maintenance program for those stormwater management facilities owned or operated by the permittee as follows:

(1) Within six months of the permit effective date, the permittee shall develop and maintain written inspection and maintenance procedures in order to ensure adequate long-term operation and maintenance of its stormwater management facilities. The permittee may use inspection and maintenance specifications available from the Virginia Stormwater BMP Clearinghouse or inspection and maintenance plans developed in accordance with the department's Stormwater Local Assistance Fund (SLAF) guidelines;

(2) Employees and contractors implementing the stormwater program shall obtain the appropriate certifications as required under the Virginia Erosion and Stormwater Management Act and its attendant regulations;

(3) The permittee shall inspect stormwater management facilities owned or operated by the permittee no less frequently than once per year. The permittee may choose to implement an alternative schedule to inspect these stormwater management facilities based on facility type and expected maintenance needs provided that the alternative schedule and rationale is included in the MS4 program plan. The alternative inspection frequency shall be no less often than once per five years; and

(4) If during the inspection of the stormwater management facility conducted in accordance with Part I E 5 b (2), it is determined that maintenance is required, the permittee shall conduct the maintenance in accordance with the written procedures developed under Part I E 5 b (1).

c. For traditional permittees described in Part I E 5 a (1), (2), or (3), the permittee shall:

(1) Implement an inspection and enforcement program for stormwater management facilities not owned by the permittee (i.e., privately owned) that includes:

(a) An inspection frequency of no less often than once per five years for all privately owned stormwater management facilities that discharge into the MS4; and

(b) Adequate long-term operation and maintenance by the owner of the stormwater management facility by requiring the owner to develop and record a maintenance agreement, including an inspection schedule to the extent allowable under state or local law or other legal mechanism;

(2) Utilize its legal authority for enforcement of the maintenance responsibilities in accordance with 9VAC25-870-112 9VAC25-875-535 if maintenance is neglected by the owner;

(3) The permittee may develop and implement a progressive compliance and enforcement strategy provided that the strategy is included in the MS4 program plan;

(4) The permittee may utilize the inspection reports provided by the owner of a stormwater management facility as part of an inspection and enforcement program in accordance with 9VAC25-870-114 C 9VAC25-875-140 D.

d. The MS4 program plan shall include:

(1) If the permittee implements a VSMP VESMP in accordance with Part I E 5 a (1), (2), or (3):

(a) A copy of the VSMP VESMP approval letter issued by the department;

(b) Written inspection procedures and all associated documents utilized in the inspection of privately owned stormwater management facilities; and

(c) Written procedures for compliance and enforcement of inspection and maintenance requirements for privately owned stormwater management facilities;

(2) If the permittee implements a post-development stormwater runoff control program in accordance with Part I E 5 a (4):

(a) The most recently approved standards and specifications or if incorporated by reference, the location where the standards and specifications can be viewed; and

(b) A copy of the most recent standards and specifications approval letter from the department;

(3) A description of the legal authorities utilized to ensure compliance with Part I E 5 a for post-construction stormwater runoff control such as ordinances (provide citation as appropriate), permits, orders, specific contract language, and interjurisdictional agreements;

(4) Written inspection and maintenance procedures and other associated template documents utilized during inspection and maintenance of stormwater management facilities owned or operated by the permittee; and

(5) The roles and responsibilities of each of the permittee's departments, divisions, or subdivisions in implementing the post-construction stormwater runoff control program.

e. The annual report shall include the following information:

(1) If the traditional permittee implements a VSMP VESMP in accordance with Part I E 5 a (1), (2), or (3):

(a) The number of privately owned stormwater management facility inspections conducted; and

(b) The number of enforcement actions initiated by the permittee to ensure long-term maintenance of privately owned stormwater management facilities including the type of enforcement action;

(2) Total number of inspections conducted on stormwater management facilities owned or operated by the permittee;

(3) A description of the significant maintenance, repair, or retrofit activities performed on the stormwater management facilities owned or operated by the permittee to ensure it continues to perform as designed. This does not include routine activities such as grass mowing or trash collection;

(4) For traditional permittees as specified in Part I E 5 a (1), a confirmation statement that the permittee submitted stormwater management facility information through the Virginia Construction Stormwater General Permit database for those land disturbing land-disturbing activities for which the permittee was required to obtain coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities in accordance with Part III B 1 or a statement that the permittee did not complete any projects requiring coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities (9VAC25-880);

(5) A confirmation statement that the permittee electronically reported stormwater management facilities using the DEQ BMP Warehouse in accordance with Part III B 1 and 2; and

(6) A confirmation statement that the permittee electronically reported stormwater management facilities inspected using the DEQ BMP Warehouse in accordance with Part III B 5.

6. Pollution prevention and good housekeeping for facilities owned or operated by the permittee within the MS4 service area.

a. The permittee shall maintain and implement written good housekeeping procedures for those activities listed in Part I E 6 b at facilities owned or operated by the permittee designed to meet the following objectives:

(1) Prevent illicit discharges;

(2) Ensure permittee staff or contractors properly dispose of waste materials, including landscape wastes and prevent waste materials from entering the MS4;

(3) Prevent the discharge of wastewater or wash water not authorized in accordance with 9VAC25-890-20 D 3 u, into the MS4 without authorization under a separate VPDES permit; and

(4) Minimize the pollutants in stormwater runoff.

b. The permittee shall develop and implement written good housekeeping procedures that meet the objectives established in Part I E 6 a for the following activities:

(1) Road, street, sidewalk, and parking lot maintenance and cleaning:

(a) Within 24 months of permit issuance, permittees that apply anti-icing and deicing agents shall update and implement procedures in accordance with Part I E to include implementation of best management practices for anti-icing and deicing agent application, transport, and storage;

(b) Procedures developed in accordance with Part I E shall prohibit the application of any anti-icing or deicing agent containing urea or other forms of nitrogen or phosphorus;

(2) Renovation and significant exterior maintenance activities (e.g., painting, roof resealing, and HVAC coil cleaning) not covered under a separate VSMP VPDES construction general permit. The permittee shall develop and implement procedures no later than 36 months after permit issuance;

(3) Discharging water pumped from construction and maintenance activities not covered by another permit covering such activities;

(4) Temporary storage of landscaping materials;

(5) Maintenance of permittee owned or operated vehicles and equipment (i.e., prevent pollutant discharges from leaking permittee vehicles and equipment);

(6) Application of materials, including pesticides and herbicides shall not exceed manufacturer's recommendations; and

(7) Application of fertilizer shall not exceed maximum application rates established by applicable nutrient management plans. For areas not covered under nutrient management plans where fertilizer is applied, application rates shall not exceed manufacturer's recommendations.

c. The permittee shall require through the use of contract language, training, written procedures, or other measures within the permittee's legal authority that contractors employed by the permittee and engaging in activities described in Part I E 6 b follow established good housekeeping procedures and use appropriate control measures to minimize the discharge of pollutants to the MS4.

d. The written procedures established in accordance with Part I E 6 a and b shall be utilized as part of the employee training program, and the permittee shall develop a written training plan for applicable field personnel that ensures the following:

(1) Applicable field personnel shall receive training in the prevention, recognition, and elimination of illicit discharges no less often than once per 24 months;

(2) Employees performing road, street, sidewalk, and parking lot maintenance shall receive training in good housekeeping procedures required under Part I E 6 b (1) no less often than once per 24 months;

(3) Employees working in and around facility maintenance, public works, or recreational facilities shall receive training in applicable Part I E 6 a and b good housekeeping procedures required no less often than once per 24 months;

(4) Employees working in and around high-priority facilities with a stormwater pollution prevention plan (SWPPP) shall receive training in applicable site specific SWPPP procedures no less often than once per 24 months;

(5) Employees whose duties include emergency spill control and response shall be trained in spill control and response. Emergency responders, such as firefighters and law-enforcement officers, trained on the handling of spill control and response as part of a larger emergency response training shall satisfy this training requirement and be documented in the training plan; and

(6) Employees and contractors hired by the permittee who apply pesticides and herbicides shall be trained and certified in accordance with the Virginia Pesticide Control Act (§ 3.2-3900 et seq. of the Code of Virginia). Certification by the Virginia Department of Agriculture and Consumer Services (VDACS) Pesticide and Herbicide Applicator program shall constitute compliance with this requirement. Contracts for the application of pesticide and herbicides executed after the effective date of this permit shall require contractor certification.

e. The permittee shall maintain documentation of each training activity conducted by the permittee to fulfill the requirements of Part I E 6 d for a minimum of three years after training activity completion. The documentation shall include the following information:

(1) The date when applicable employees have completed the training activity;

(2) The number of employees who have completed the training activity; and

(3) The training objectives and good housekeeping procedures required under Part I E 6 a covered by training activity.

f. The permittee may fulfill the training requirements in Part I E 6 d, in total or in part, through regional training programs involving two or more MS4 permittees; however, the permittee shall remain responsible for ensuring compliance with the training requirements.

g. Within 12 months of permit coverage, the permittee shall identify any new high-priority facilities located in expanded 2020 census urban areas with a population of at least 50,000.

h. Within 36 months of permit coverage, the permittee shall implement SWPPPs for high-priority facilities meeting the conditions of Part I E 6 i and which are located in expanded 2020 census urban areas with a population of at least 50,000.

i. The permittee shall maintain and implement a site specific SWPPP for each high-priority facility as defined in 9VAC25-890-1 that does not have or require separate VPDES permit coverage, and which any of the following materials or activities occur and are expected to have exposure to stormwater resulting from rain, snow, snowmelt, or runoff:

(1) Areas where residuals from using, storing, or cleaning machinery or equipment remain and are exposed to stormwater;

(2) Materials or residuals on the ground or in stormwater inlets from spills or leaks;

(3) Material handling equipment;

(4) Materials or products that would be expected to be mobilized in stormwater runoff during loading or unloading or transporting activities (e.g., rock, salt, fill dirt);

(5) Materials or products stored outdoors (except final products intended for outside use where exposure to stormwater does not result in the discharge of pollutants);

(6) Materials or products that would be expected to be mobilized in stormwater runoff contained in open, deteriorated, or leaking storage drums, barrels, tanks, and similar containers;

(7) Waste material except waste in covered, nonleaking containers (e.g., dumpsters);

(8) Application or disposal of process wastewater (unless otherwise permitted); or

(9) Particulate matter or visible deposits of residuals from roof stacks, vents, or both not otherwise regulated (i.e., under an air quality control permit) and evident in the stormwater runoff.

j. Each SWPPP as required in Part I E 6 g shall include the following:

(1) A site description that includes a site map identifying all outfalls, direction of stormwater flows, existing source controls, and receiving water bodies;

(2) A description and checklist of the potential pollutants and pollutant sources;

(3) A description of all potential nonstormwater discharges;

(4) A description of all structural control measures, such as stormwater management facilities and other pollutant source controls, applicable to SWPPP implementation (e.g., permeable pavement or oil-water separators that discharge to sanitary sewer are not applicable to the SWPPP), such as oil-water separators, and inlet protection designed to address potential pollutants and pollutant sources at risk of being discharged to the MS4;

(5) A maintenance schedule for all stormwater management facilities and other pollutant source controls applicable to SWPPP implementation described in Part I E 6 h (4);

(6) Site specific written procedures designed to reduce and prevent pollutant discharge that incorporate by reference applicable good housekeeping procedures required under Part I E 6 a and b;

(7) A description of the applicable training as required in Part I E 6 d (4);

(8) An inspection frequency of no less often than once per year and maintenance requirements for site specific source controls. The date of each inspection and associated findings and follow-up shall be logged in each SWPPP;

(9) A log of each unauthorized discharge, release, or spill incident reported in accordance with Part IV G including the following information:

(a) Date of incident;

(b) Material discharged, released, or spilled; and

(c) Estimated quantity discharged, released, or spilled;

(10) A log of modifications to the SWPPP made as the result of any unauthorized discharge, release, or spill in accordance Part I E 6 j or changes in facility activities and operation requiring SWPPP modification; and

(11) The point of contact for SWPPP implementation.

k. No later than June 30 of each year, the permittee shall annually review any high-priority facility owned or operated by the permittee for which an SWPPP has not been developed to determine if the facility meets any of the conditions described in Part I E 6 g. If the facility is determined to need an SWPPP, the permittee shall develop an SWPPP meeting the requirements of Part I E 6 h no later than December 31 of that same year. The permittee shall maintain a list of all high-priority facilities owned or operated by the permittee not required to maintain an SWPPP in accordance with Part I E 6 g and this list shall be available upon request.

l. The permittee shall review the contents of any site specific SWPPP no later than 30 days after any unauthorized discharge, release, or spill reported in accordance with Part IV G to determine if additional measures are necessary to prevent future unauthorized discharges, releases, or spills. If necessary, the SWPPP shall be updated no later than 90 days after the unauthorized discharge.

m. The SWPPP shall be kept at the high-priority facility and utilized as part of employee SWPPP training required in Part I E 6 d (4). The SWPPP and associated documents may be maintained as a hard copy or electronically as long as the documents are available to employees at the applicable site.

n. If activities change at a facility such that the facility no longer meets the definition of a high-priority facility, the permittee may remove the facility from the list of high-priority facilities with a high potential to discharge pollutants.

o. If activities change at a facility such that the facility no longer meets the criteria requiring SWPPP coverage as described in Part I E 6 g, the permittee may remove the facility from the list of high-priority facilities that require SWPPP coverage.

p. The permittee shall maintain and implement turf and landscape nutrient management plans that have been developed by a certified turf and landscape nutrient management planner in accordance with § 10.1-104.2 of the Code of Virginia on all lands owned or operated by the permittee where nutrients are applied to a contiguous area greater than one acre. If nutrients are being applied to achieve final stabilization of a land disturbance land-disturbance project, application shall follow the manufacturer's recommendations.

q. Within 12 months of permit coverage, the permittee shall identify contiguous areas greater than one acre located in expanded 2020 census urban areas with population of at least 50,000 and within the permittee's MS4 service area requiring turf and landscape nutrient management plans.

r. Within 36 months of permit coverage, the permittee shall implement turf and landscape nutrient management plans on contiguous areas greater than one acre located in expanded 2020 census urban areas with a population of least 50,000 and within the permittee's MS4 service area.

s. If nutrients are being applied to achieve final stabilization of a land disturbance land-disturbance project, application shall follow the manufacturer's recommendations. For newly established turf where nutrients are applied to a contiguous area greater than one acre, the permittee shall implement a nutrient management plan no later than six months after the site achieves final stabilization.

t. Nutrient management plans developed in accordance with Part I E 6 n shall be submitted to the Department of Conservation and Recreation (DCR) for approval.

u. Nutrient management plans that are expired as of the effective date of this permit shall be submitted to DCR for renewal within six months after the effective date of this permit. Thereafter, all nutrient management plans shall be submitted to DCR at least 30 days prior to nutrient management plan expiration. Within 36 months of permit coverage, no nutrient management plans maintained by the permittee in accordance with Part I E 6 n shall be expired due to DCR documented noncompliance with 4VAC50-85-130 provided to the permittee.

v. Nutrient management plans may be maintained as a hard copy or electronically as long as the documents are available to employees at the applicable site.

w. Nontraditional permittees with lands regulated under § 10.1-104.4 of the Code of Virginia, including state agencies, state colleges and universities, and other state government entities, shall continue to implement turf and landscape nutrient management plans in accordance with this statutory requirement.

x. The MS4 program plan shall include:

(1) A list of written good housekeeping procedures for the operations and maintenance activities as required by Part I E 6 a and b;

(2) A list of all high-priority facilities owned or operated by the permittee required to maintain an SWPPP in accordance with Part I E 6 g that includes the facility name, facility location, and the location of the SWPPP hardcopy or electronic document being maintained. The SWPPP for each high-priority facility shall be incorporated by reference;

(3) A list of locations for which turf and landscape nutrient management plans are required in accordance with Part I E 6 n and s, including the following information:

(a) The total acreage covered by each nutrient management plan;

(b) The DCR approval date and expiration date for each nutrient management plan;

(c) The location of the nutrient management plan hardcopy or electronic document being maintained;

(4) A summary of mechanisms the permittee uses to ensure contractors working on behalf of the permittees implement the necessary good housekeeping and pollution prevention procedures, and stormwater pollution plans as appropriate; and

(5) The written training plan as required in Part I E 6 d.

y. The annual report shall include the following:

(1) A summary of any written procedures developed or modified in accordance with Part I E 6 a and b during the reporting period;

(2) A confirmation statement that all high-priority facilities were reviewed to determine if SWPPP coverage is needed during the reporting period;

(3) A list of any new SWPPPs developed in accordance Part I E 6 i during the reporting period;

(4) A summary of any SWPPPs modified in accordance with Part I E 6 j, 6 l, or 6 m;

(5) The rationale of any high-priority facilities delisted in accordance with Part I E 6 l or m during the reporting period;

(6) The status of each nutrient management plan as of June 30 of the reporting year (e.g., approved, submitted and pending approval, and expired);

(7) A list of the training activities conducted in accordance with Part I E 6 d, including the following information:

(a) The completion date for the training activity;

(b) The number of employees who completed the training activity; and

(c) The objectives and good housekeeping procedures covered by the training activity.

Part II

TMDL Special Conditions

A. Chesapeake Bay TMDL special condition.

1. The Commonwealth in its Phase I, Phase II, and Phase III Chesapeake Bay TMDL Watershed Implementation Plans (WIPs) committed to a phased approach for MS4s, affording MS4 permittees up to three full five-year permit cycles to implement necessary reductions. This permit is consistent with the Chesapeake Bay TMDL and the Virginia Phase I, Phase II, and Phase III WIPs to meet the Level 2 (L2) scoping run for existing developed lands as it represents an implementation of an additional 60% of L2 as specified in the Phase I, Phase II, and Phase III WIPs. In combination with the 40% reduction of L2 that has already been achieved, a total reduction no later than October 31, 2028, of 100% of L2 shall be achieved. Conditions of future permits will be consistent with the TMDL or WIP conditions in place at the time of permit issuance.

2. The following definitions apply to Part II of this state permit for the purpose of the Chesapeake Bay TMDL special condition for discharges in the Chesapeake Bay Watershed:

"Existing sources" means pervious and impervious urban land uses served by the MS4 as of June 30, 2009.

"New sources" means pervious and impervious urban land uses served by the MS4 developed or redeveloped on or after July 1, 2009.

"Pollutants of concern" or "POC" means total nitrogen and total phosphorus.

"Transitional sources" means regulated land disturbing land-disturbing activities that are temporary in nature and discharge through the MS4.

3. Reduction requirements for permittees previously covered under the General VPDES Permit for Discharges of Stormwater from MS4 effective November 1, 2018. No later than October 31, 2028, the permittee shall reduce the load of total nitrogen and total phosphorus from existing developed lands served by the MS4 as of June 30, 2009, within the 2010 Census urbanized areas by at least 100% of the Level 2 (L2) Scoping Run Reductions. The 100% reduction is the sum of (i) the first phase reduction of 5.0% of the L2 Scoping Run Reductions based on the lands located within the 2000 Census urbanized areas required by June 30, 2018; (ii) the second phase reduction of at least 35% of the L2 Scoping Run based on lands within the 2000 Census urbanized areas required by June 30, 2023; (iii) the second phase reduction of at least 40% of the L2 Scoping Run, which shall only apply to the additional lands that were added by the 2010 expanded Census urbanized areas required by June 30, 2023; and (iv) the third phase reduction of least 60% of the L2 Scoping Run based on lands within the 2000 and 2010 expanded Census urbanized areas required by October 31, 2028. The required reduction shall be calculated using Tables 3a, 3b, 3c, and 3d as applicable:

Table 3a

Calculation Sheet for Estimating Existing Source Loads and Reduction Requirements for the James River, Lynnhaven, and Little Creek Basins

A

B

C

D

E

F

Pollutant

Subsource

Loading rate (lbs/ac/yr)1

Existing developed lands as of 6/30/09 served by the MS4 within the 2010 CUA (acres)2

Load(lbs/yr)3

Percentage of MS4 required Chesapeake Bay total L2 loading reduction

100% cumulative reduction Required by 10/31/2028 (lbs/yr)4

Sum of 100% cumulative reduction (lb/yr)5

Nitrogen

Regulated urban impervious

9.39

9%

Regulated urban pervious

6.99

6%

Phosphorus

Regulated urban impervious

1.76

16%

Regulated urban pervious

0.5

7.25%

1Edge of stream loading rate based on the Chesapeake Bay Watershed Model Progress Run 5.3.2.

2To determine the existing developed acres required in Column B, permittees should first determine the extent of their regulated service area based on the 2010 Census urbanized area (CUA). Next, permittees will need to delineate the lands within the 2010 CUA served by the MS4 as pervious or impervious as of the baseline date of June 30, 2009.

3Column C = Column A x Column B.

4Column E = Column C x Column D.

5Column F = The sum of the subsource cumulative reduction required by 10/31/2028 (lbs/yr) as calculated in Column E.

Table 3b

Calculation Sheet for Estimating Existing Source Loads and Reduction Requirements for the Potomac River Basin

A

B

C

D

E

F

Pollutant

Subsource

Loading rate (lbs/ac/yr)1

Existing developed lands as of 6/30/09 served by the MS4 within the 2010 CUA (acres)2

Load (lbs/yr)3

Percentage of MS4 required Chesapeake Bay total L2 loading reduction

100% cumulative reduction required by 10/31/2028 (lbs/yr)4

Sum of 100% cumulative reduction (lb/yr)5

Nitrogen

Regulated urban impervious

16.86

9%

Regulated urban pervious

10.07

6%

Phosphorus

Regulated Urban Impervious

1.62

16%

Regulated urban pervious

0.41

7.25%

1Edge of stream loading rate based on the Chesapeake Bay Watershed Model Progress Run 5.3.2

2To determine the existing developed acres required in Column B, permittees should first determine the extent of their regulated service area based on the 2010 Census urbanized area (CUA). Next, permittees will need to delineate the lands within the 2010 CUA served by the MS4 as pervious or impervious as of the baseline date of June 30, 2009.

3Column C = Column A x Column B.

4Column E = Column C x Column D.

5Column F = The sum of the subsource cumulative reduction required by 10/31/2028 (lbs/yr) as calculated in Column E.

Table 3c

Calculation Sheet for Estimating Existing Source Loads and Reduction Requirements for the Rappahannock River Basin

A

B

C

D

E

F

Pollutant

Subsource

Loading rate (lbs/ac/yr)1

Existing developed lands as of 6/30/09 served by the MS4 within the 2010 CUA (acres)2

Load (lbs/yr)3

Percentage of MS4 required Chesapeake Bay total L2 loading reduction

100% cumulative reduction Required by 10/31/2028 (lbs/yr)4

Sum of 100% cumulative reduction (lb/yr)5

Nitrogen

Regulated urban impervious

9.38

9%

Regulated urban pervious

5.34

6%

Phosphorus

Regulated urban impervious

1.41

16%

Regulated urban pervious

0.38

7.25%

1Edge of stream loading rate based on the Chesapeake Bay Watershed Model Progress Run 5.3.2.

2To determine the existing developed acres required in Column B, permittees should first determine the extent of their regulated service area based on the 2010 Census urbanized area (CUA). Next, permittees will need to delineate the lands within the 2010 CUA served by the MS4 as pervious or impervious as of the baseline date of June 30, 2009.

3Column C = Column A x Column B.

4Column E = Column C x Column D.

5Column F = The sum of the subsource cumulative reduction required by 10/31/2028 (lbs/yr) as calculated in Column E.

Table 3d

Calculation Sheet for Estimating Existing Source Loads and Reduction Requirements for the York River and Poquoson Coastal Basin

A

B

C

D

E

F

Pollutant

Subsource

Loading rate (lbs/ac/yr)1

Existing developed lands as of 6/30/09 served by the MS4 within the 2010 CUA

(acres)2

Load (lbs/yr)3

Percentage of MS4 required Chesapeake Bay total L2 loading reduction

100% cumulative reduction required by 10/31/2028 (lbs/yr)4

Sum of 100% cumulative reduction

(lb/yr)5

Nitrogen

Regulated urban impervious

7.31

9%

Regulated urban pervious

7.65

6%

Phosphorus

Regulated urban impervious

1.51

16%

Regulated urban pervious

0.51

7.25%

1Edge of stream loading rate based on the Chesapeake Bay Watershed Model Progress Run 5.3.2.

2To determine the existing developed acres required in Column B, permittees should first determine the extent of their regulated service area based on the 2010 Census urbanized area (CUA). Next, permittees will need to delineate the lands within the 2010 CUA served by the MS4 as pervious or impervious as of the baseline date of June 30, 2009.

3Column C = Column A x Column B.

4Column E = Column C x Column D.

5Column F = The sum of the subsource cumulative reduction required by 10/31/2028 (lbs/yr) as calculated in Column E.

4. No later than October 31, 2028, the permittee shall offset 100% of the increased loads from new sources initiating construction between July 1, 2009, and October 31, 2023, and designed in accordance with 9VAC25-870 Part II C (9VAC25-870-93 et seq.) Article 4 (9VAC25-875-670 et seq.) of Part V of the Virginia Erosion and Stormwater Management Regulation if the following conditions apply:

a. The activity disturbed one acre or greater; and

b. The resulting total phosphorous load was greater than 0.45 lb/acre/year, which is equivalent to an average land cover condition of 16% impervious cover.

The permittee shall utilize Table 4 of Part II A 5 to develop the equivalent pollutant load for new sources of nitrogen meeting the requirements of this condition.

5. No later than October 31, 2028, the permittee shall offset the increased loads from projects grandfathered in accordance with 9VAC25-870-48 9VAC25-875-490 that begin construction after July 1, 2014, if the following conditions apply:

a. The activity disturbs one acre or greater; and

b. The resulting total phosphorous load was greater than 0.45 lb/acre/year, which is equivalent to an average land cover condition of 16% impervious cover.

The permittee shall utilize Table 4 to develop the equivalent pollutant load for grandfathered sources of nitrogen meeting the requirements of this condition.

Table 4

Ratio of Phosphorus Loading Rate to Nitrogen Loading Rates for Chesapeake Bay Basins

Ratio of Phosphorus to Other POCs
(Based on All Land Uses 2009 Progress Run)

Phosphorus Loading Rate (lbs/acre)

Nitrogen Loading Rate (lbs/acre)

James River Basin, Lynnhaven, and Little Creek Basins

1.0

5.2

Potomac River Basin

1.0

6.9

Rappahannock River Basin

1.0

6.7

York River Basin (including Poquoson Coastal Basin)

1.0

9.5

6. Reductions achieved in accordance with the General VPDES Permit for Discharges of Stormwater from Small Municipal Separate Storm Sewer Systems effective July 1, 2013, and November 1, 2018, shall be applied toward the total reduction requirements to demonstrate compliance with Part II A 3, A 4, and A 5.

7. 40% of L2 reductions for total nitrogen and total phosphorus shall be maintained by the permittee during the permit term.

8. Reductions shall be achieved in each river basin as calculated in Part II A 3 or for reductions in accordance with Part II A 4 and A 5 in the basin in which the new source or grandfathered project occurred.

9. Loading and reduction values greater than or equal to 10 pounds calculated in accordance with Part II A 3, A 4, and A 5 shall be calculated and reported to the nearest pound without regard to mathematical rules of precision. Loading and reduction values of less than 10 pounds reported in accordance with Part II A 3, A 4, and A 5 shall be calculated and reported to two significant digits.

10. Reductions required in Part II A 3, A 4, and A 5 shall be achieved through one or more of the following:

a. BMPs approved by the Chesapeake Bay Program;

b. BMPs approved by the department; or

c. A trading program described in Part II A 11.

11. The permittee may acquire and use total nitrogen and total phosphorus credits in accordance with § 62.1-44.19:21 of the Code of Virginia for purposes of compliance with the required reductions in Table 3a, Table 3b, Table 3c, and Table 3d of Part II A 3; Part II A 4; and Part II A 5, provided the use of credits has been approved by the department. The exchange of credits is subject to the following requirements:

a. The credits are generated and applied to a compliance obligation in the same calendar year;

b. The credits are generated and applied to a compliance obligation in the same tributary;

c. The credits are acquired no later than June 1 immediately following the calendar year in which the credits are applied;

d. No later than June 1 immediately following the calendar year in which the credits are applied, the permittee certifies on an MS4 Nutrient Credit Acquisition Form that the permittee has acquired the credits; and

e. Total nitrogen and total phosphorus credits shall be either point source credits generated by point sources covered by the Watershed Permit for Total Nitrogen and Total Phosphorus Discharges and Nutrient Trading in the Chesapeake Bay Watershed general permit issued pursuant to § 62.1-44.19:14 of the Code of Virginia or nonpoint source credits certified pursuant to § 62.1-44.19:20 of the Code of Virginia.

12. Chesapeake Bay TMDL action plan requirements.

a. Permittees applying for initial coverage under this general permit shall submit a draft first phase Chesapeake Bay TMDL action plan to the department no later than October 31, 2028, unless the department grants a later date. The required reduction shall be calculated using Tables 3a, 3b, 3c, and 3d as applicable. The first phase action plan shall achieve a minimum reduction of least 40% of the L2 Scoping Run based on lands within the 2000 and 2010 expanded Census urbanized areas no later than October 31, 2033. The action plan shall include the following information:

(1) The load and cumulative reduction calculations for each river basin calculated in accordance with Part II A 3, A 4, and A 5;

(2) The BMPs to be implemented by the permittee to achieve 40% of the reductions calculated in Part II A 13 a:

(a) Type of BMP;

(b) Project name;

(c) Location;

(d) Percent removal efficiency for each pollutant of concern; and

(e) Calculation of the reduction expected to be achieved by the BMP calculated and reported in accordance with the methodologies established in Part II A 9 for each pollutant of concern;

(3) A preliminary schedule for implementation of the BMPs included in the Chesapeake Bay TMDL action plan; and

(4) A summary of any comments received as a result of public participation required in Part II A 14, the permittee's response, identification of any public meetings to address public concerns, and any revisions made to Chesapeake Bay TMDL action plan as a result of public participation.

b. For permittees previously covered under the General VPDES Permit for the Discharge of Stormwater from MS4 effective November 1, 2018, no later than 12 months after the permit effective date, the permittee shall submit a third phase Chesapeake Bay TMDL action plan for the reductions required in Part II A 3, A 4, and A 5 that includes the following information:

(1) Any new or modified legal authorities, such as ordinances, permits, policy, specific contract language, orders, and interjurisdictional agreements, implemented or needing to be implemented to meet the requirements of Part II A 3, A 4, and A 5.

(2) The load and cumulative reduction calculations for each river basin calculated in accordance with Part II A 3, A 4, and A 5.

(3) The total reductions achieved as of November 1, 2023, for each pollutant of concern in each river basin.

(4) A list of BMPs implemented prior to November 1, 2023, to achieve reductions associated with the Chesapeake Bay TMDL, including:

(a) The date of implementation; and

(b) The reductions achieved.

(5) The BMPs to be implemented by the permittee within 60 months of the effective date of this permit to meet the cumulative reductions calculated in Part II A 3, A 4, and A 5, including as applicable:

(a)Type of BMP;

(b) Project name;

(c) Location;

(d) Percent removal efficiency for each pollutant of concern;

(e) Calculation of the reduction expected to be achieved by the BMP calculated and reported in accordance with the methodologies established in Part II A 9 for each pollutant of concern; and

(f) A preliminary schedule for implementation of the BMPs included in the Chesapeake Bay TMDL action plan.

(6) A summary of any comments received as a result of public participation required in Part II A 13, the permittee's response, identification of any public meetings to address public concerns, and any revisions made to Chesapeake Bay TMDL action plan as a result of public participation.

13. Prior to submittal of the action plan required in Part II A 12 a and b, permittees shall provide an opportunity for public comment for no fewer than 15 days on the additional BMPs proposed in the third phase Chesapeake Bay TMDL action plan.

14. Chesapeake Bay TMDL implementation annual status report.

a. Permittees previously covered under the General VPDES Permit for Discharges of Stormwater from MS4 effective November 1, 2018, shall submit a Chesapeake Bay TMDL implementation annual status report in a method (i.e., how the permittee must submit) and format (i.e., how the report shall be laid out) as specified by the department no later than October 1 of each year. The report shall cover the previous year from July 1 to June 30.

b. Following notification from the department of the start date for the required electronic submission of Chesapeake Bay TMDL implementation annual status reports, as provided for in 9VAC25-31-1020, such forms and reports submitted after that date shall be electronically submitted to the department in compliance with 9VAC25-31-1020 and this section. There shall be at least a three-month notice provided between the notification from the department and the date after which such forms and reports must be submitted electronically.

c. The year two Chesapeake Bay TMDL implementation annual status report shall contain a summary of any public comments on the Chesapeake Bay TMDL action plan received and how the permittee responded.

d. Each Chesapeake Bay TMDL implementation annual status report shall include the following information:

(1) A list of Chesapeake Bay TMDL action plan BMPs, not including annual practices, implemented prior to the reporting period that includes the following information for reported BMP;

(a) The number of BMPs for each BMP type;

(b) The estimated reduction of pollutants of concern achieved by each BMP type and reported in pounds of pollutant reduction per year; and

(c) A confirmation statement that the permittee electronically reported Chesapeake Bay TMDL action plan BMPs inspected using the DEQ BMP Warehouse in accordance with Part III B 5.

(2) A list of newly implemented BMPs including annual practices implemented during the reporting period that includes the following information for each reported BMP or a statement that no BMPs were implemented during the reporting period:

(a) The BMP type and a description of the location for each BMP;

(b) The estimated reduction of pollutants of concern achieved by each BMP and reported in pounds of pollutant reduction per year; and

(c) A confirmation statement that the permittee electronically reported BMPs using the DEQ BMP Warehouse in accordance with Part III B 3.

e. If the permittee acquired credits during the reporting period to meet all or a portion of the required reductions in Part II A 3, A 4, or A 5, a statement that credits were acquired.

f. Pollutant load reductions generated by annual practices, such as street and storm drain cleaning, shall only be applied to the compliance year in which the annual practice was implemented.

g. The progress, using the final design efficiency of the BMPs, toward meeting the required cumulative reductions for total nitrogen and total phosphorus.

h. Any revisions made to the Chesapeake Bay TMDL action plan.

i. A list of BMPs that are planned to be implemented during the next reporting period.

15. Within 60 months after permit issuance, the permittee shall update the Phase III Chesapeake Bay TMDL action plan to offset the increased loads from new sources initiating construction between July 1, 2009, and October 31, 2023, that are located in the expanded 2020 census urban areas with a population of at least 50,000, and within the permittee's MS4 service area, and designed in accordance with 9VAC25-870 Part II C (9VAC25-870-93 et seq.) Article 4 (9VAC25-875-670 et seq.) of Part V of the Virginia Erosion and Stormwater Management Regulation, if the following conditions apply:

a. The activity disturbed one acre or greater; and

b. The resulting total phosphorous load was greater than 0.45 pounds per acre per year, which is equivalent to an average land cover condition of 16% impervious cover.

The permittee shall utilize Table 4 of Part II A 5 to develop the equivalent nitrogen pollutant load for new sources meeting the requirements of this condition.

16. Within 60 months after permit issuance, the permittee shall update the Phase III Chesapeake Bay TMDL action plan to offset the increased loads from projects grandfathered in accordance with 9VAC25-870-48 9VAC25-875-490 that are located in the expanded 2020 census urban areas with a population of least 50,000, and within the permittee's MS4 service area, and began construction after July 1, 2014, if the following conditions apply:

a. The activity disturbs one acre or greater; and

b. The resulting total phosphorous load was greater than 0.45 pounds per acre per year, which is equivalent to an average land cover condition of 16% impervious cover.

The permittee shall utilize Table 4 of Part II A 6 to develop the equivalent nitrogen pollutant load for grandfathered sources meeting the requirements of this condition.

B. Local TMDL special condition.

1. Permittees applying for initial coverage under this general permit shall develop a local TMDL action plan designed to reduce loadings for pollutants of concern if the permittee discharges the pollutants of concern to an impaired water for which a TMDL has been approved by the U.S. Environmental Protection Agency (EPA) prior to October 31, 2023, and in which an individual or aggregate wasteload has been allocated to the permittee. The permittee shall develop action plans to meet the conditions of Part II B 4, B 5, B 6, B 7, and B 8 as applicable. Each local TMDL action plan shall be provided to the department no later than October 31, 2028, unless the department grants a later date.

2. Permittees previously covered under the General VPDES Permit for Discharges of Stormwater from MS4 effective November 1, 2018, shall develop and maintain a local TMDL action plan designed to reduce loadings for pollutants of concern if the permittee discharges the pollutants of concern to an impaired water for which a TMDL has been approved by the U.S. Environmental Protection Agency (EPA) as described in Part II B 2 a and 2 b:

a. For TMDLs approved by EPA prior to July 1, 2018, and in which an individual or aggregate wasteload has been allocated to the permittee, the permittee shall develop and initiate or update as applicable the local TMDL action plans to meet the conditions of Part II B 4, B 6, B 7, and B 8, as applicable, no later than 18 months after the permit effective date and continue implementation of the action plan. Updated action plans shall include:

(1) An evaluation of the results achieved by the previous action plan; and

(2) Any adaptive management strategies incorporated into updated action plans based on action plan evaluation.

b. For TMDLs approved by EPA on or after July 1, 2018, and prior to October 31, 2023, and in which an individual or aggregate wasteload has been allocated to the permittee, the permittee shall develop and initiate implementation of action plans to meet the conditions of Part II B 4, B 5, B 6, B 7, and B 8, as applicable no later than 30 months after the permit effective date.

3. The permittee shall complete implementation of the TMDL action plans as determined by the schedule. TMDL action plans may be implemented in multiple phases over more than one permit cycle using the adaptive iterative approach provided adequate progress is achieved in the implementation of BMPs designed to reduce pollutant discharges in a manner that is consistent with the assumptions and requirements of the applicable TMDL.

4. Each local TMDL action plan developed by the permittee shall include the following:

a. The TMDL project name;

b. The EPA approval date of the TMDL;

c. The wasteload allocated to the permittee (individually or in aggregate), and the corresponding percent reduction, if applicable;

d. Identification of the significant sources of the pollutants of concern discharging to the permittee's MS4 that are not covered under a separate VPDES permit. For the purposes of this requirement, a significant source of pollutants of concern means a discharge where the expected pollutant loading is greater than the average pollutant loading for the land use identified in the TMDL;

e. The BMPs designed to reduce the pollutants of concern in accordance with Part II B 5, B 6, B 7, and B 8;

f. Any calculations required in accordance with Part II B 5, B 6, B 7, or B 8;

g. For action plans developed in accordance with Part II B 5, B 6, and B 8, an outreach strategy to enhance the public's education (including employees) on methods to eliminate and reduce discharges of the pollutants; and

h. A schedule of anticipated actions planned for implementation during this permit term.

5. Bacterial TMDLs.

a. Traditional permittees shall select and implement at least three of the strategies listed in Table 5 designed to reduce the load of bacteria to the MS4. Selection of the strategies shall correspond to sources identified in Part II B 4 d.

b. Nontraditional permittees shall select at least one strategy listed in Table 5 designed to reduce the load of bacteria to the MS4 relevant to sources of bacteria applicable within the MS4 regulated service area. Selection of the strategies shall correspond to sources identified in Part II B 4 d.

Table 5

Strategies for Bacteria Reduction Stormwater Control/Management Strategy

Source

Strategies (provided as an example and not meant to be all inclusive or limiting)

Domestic pets (dogs and cats)

Provide signage to pick up dog waste, providing pet waste bags and disposal containers.

Adopt and enforce pet waste ordinances or policies, or leash laws or policies.

Place dog parks away from environmentally sensitive areas.

Maintain dog parks by removing disposed of pet waste bags and cleaning up other sources of bacteria.

Protect riparian buffers and provide unmanicured vegetative buffers along streams to dissuade stream access.

Urban wildlife

Educate the public on how to reduce food sources accessible to urban wildlife (e.g., manage restaurant dumpsters and grease traps, residential garbage, feed pets indoors).

Install storm drain inlet or outlet controls.

Clean out storm drains to remove waste from wildlife.

Implement and enforce urban trash management practices.

Implement rooftop disconnection programs or site designs that minimize connections to reduce bacteria from rooftops.

Implement a program for removing animal carcasses from roadways and properly disposing of the same (either through proper storage or through transport to a licensed facility).

Illicit connections or illicit discharges to the MS4

Implement an enhanced dry weather screening and illicit discharge, detection, and elimination program beyond the requirements of Part I E 3 to identify and remove illicit connections and identify leaking sanitary sewer lines infiltrating to the MS4 and implement repairs.

Implement a program to identify potentially failing septic systems.

Educate the public on how to determine whether their septic system is failing.

Implement septic tank inspection and maintenance program.

Implement an educational program beyond any requirements in Part I E 1 though E 6 to explain to citizens why they should not dump materials into the MS4.

Dry weather urban flows (irrigations, car washing, powerwashing, etc.)

Implement public education programs to reduce dry weather flows from storm sewers related to lawn and park irrigation practices, car washing, powerwashing and other nonstormwater flows.

Provide irrigation controller rebates.

Implement and enforce ordinances or policies related to outdoor water waste.

Inspect commercial trash areas, grease traps, washdown practices, and enforce corresponding ordinances or policies.

Birds (Canadian geese, gulls, pigeons, etc.)

Identify areas with high bird populations and evaluate deterrents, population controls, habitat modifications and other measures that may reduce bird-associated bacteria loading.

Prohibit feeding of birds.

Other sources

Enhance maintenance of stormwater management facilities owned or operated by the permittee.

Enhance requirements for third parties to maintain stormwater management facilities.

Develop BMPs for locating, transporting, and maintaining portable toilets used on permittee-owned sites. Educate third parties that use portable toilets on BMPs for use.

Provide public education on appropriate recreational vehicle dumping practices.

6. Local sediment, phosphorus, and nitrogen TMDLs.

a. The permittee shall reduce the loads associated with sediment, phosphorus, or nitrogen through implementation of one or more of the following:

(1) One or more of the BMPs from the Virginia Stormwater BMP Clearinghouse listed in 9VAC25-870-65 9VAC25-875-590 or other approved BMPs found on through the Virginia Stormwater BMP Clearinghouse website;

(2) One or more BMPs approved by the Chesapeake Bay Program. Pollutant load reductions generated by annual practices, such as street and storm drain cleaning, shall only be applied to the compliance year in which the annual practice was implemented; or

(3) Land disturbance thresholds lower than Virginia's regulatory requirements for erosion and sediment control and post development stormwater management.

b. The permittee may meet the local TMDL requirements for sediment, phosphorus, or nitrogen through BMPs implemented or sediment, phosphorus, or nitrogen credits acquired. BMPs implemented and nutrient and sediment credits acquired to meet the requirements of the Chesapeake Bay TMDL in Part II A may also be utilized to meet local TMDL requirements as long as the BMPs are implemented or the credits are generated in the watershed for which local water quality is impaired.

c. The permittee shall calculate the anticipated load reduction achieved from each BMP and include the calculations in the action plan required in Part II B 4 f.

d. No later than 36 months after the effective date of this permit, the permittee shall submit to the department an update on the progress made toward achieving local TMDL action plan goals and the anticipated end dates by which the permittee will meet each wasteload allocation for sediment, phosphorus, or nitrogen. The proposed end date may be developed in accordance with Part II B 3.

7. Polychlorinated biphenyl (PCB) TMDLs.

a. For each PCB TMDL action plan, the permittee shall include an inventory of potentially significant sources of PCBs owned or operated by the permittee that drains to the MS4 that includes the following information:

(1) Location of the potential source;

(2) Whether or not the potential source is from current site activities or activities previously conducted at the site that have been terminated (i.e., legacy activities); and

(3) A description of any measures being implemented or to be implemented to prevent exposure to stormwater and the discharge of PCBs from the site.

b. If at any time during the term of this permit, the permittee discovers a previously unidentified significant source of PCBs within the permittee's MS4 regulated service area, the permittee shall notify DEQ in writing within 30 days of discovery.

c. As part of its annual reporting requirements, the permittee shall submit results of any action plan PCB monitoring or product testing conducted and any adaptive management strategies that have been incorporated into the updated action plan based upon monitoring or product testing results if the permittee has elected to perform monitoring or product testing or both.

8. Chloride TMDLs.

a. No later than 36 months after the permit effective date, permittees shall develop an anti-icing and deicing agent education and outreach strategy that identifies target audiences for increasing awareness of anti-icing and deicing agent application impacts on receiving waters and encourages implementation of enhanced BMPs for application, handling, and storage of anti-icing and de-icing agents used for snow and ice management.

b. Anti-icing and deicing agent education and outreach strategies shall contain a schedule to implement two or more of the strategies listed in Part I E 1 d Table 1 per year to communicate to target audiences the importance of responsible anti-icing and deicing agent application, transport, and storage.

c. No later than 36 months after permit issuance, the permittee shall review good housekeeping procedures for anti-icing and deicing agent application, handling, storage, and transport activities required under Part I E 6 b (1) (a) and identify a minimum of two strategies for implementing enhanced BMPs that promote efficient management and application of anti-icing and deicing agents while maintaining public safety.

9. Prior to submittal of the action plan required in Part II B 2, the permittee shall provide an opportunity for public comment for no fewer than 15 days on the proposal to meet the local TMDL action plan requirements.

10. The MS4 program plan as required by Part I B of this permit shall incorporate each local TMDL action plan. Local TMDL action plans may be incorporated by reference into the MS4 program plan provided that the program plan includes the date of the most recent local TMDL action plan and identification of the location where a copy of the local TMDL action plan may be obtained.

11. For each reporting period, each annual report shall include a summary of actions conducted to implement each local TMDL action plan.

C. Inspection and maintenance of ecosystem restoration projects used for TMDL compliance.

1. Within 36 months of permit issuance the permittee shall develop and maintain written inspection and maintenance procedures in order to ensure adequate long-term operation and maintenance of ecosystem restoration projects as defined in 9VAC25-890-1 and implemented as part of a TMDL action plan developed in accordance with Part II A, B, or both. The permittee may utilize inspection and maintenance protocols developed by the Chesapeake Bay Program or inspection and maintenance plans developed in accordance with the department's Stormwater Local Assistance Fund (SLAF) guidelines.

2. The permittee shall inspect ecosystem restoration projects owned or operated by the permittee and implemented as part of a current TMDL action plan developed in accordance with Part II A or B no less than once every 60 months.

Part III

DEQ BMP Warehouse Reporting

A. For the purpose of Part III of this permit, "best management practice" or "BMP" means a practice that achieves quantifiable nitrogen, phosphorus, or total suspended solids reductions, including stormwater management facilities, ecosystem restoration projects, annual practices, and other practices approved by the department for reducing nitrogen, phosphorus, and total suspended solids pollutants.

B. No later than October 1 of each year the permittee shall electronically report new BMPs implemented and inspected as applicable between July 1 and June 30 of each year using the DEQ BMP Warehouse.

1. The permittee shall use the associated reporting template for stormwater management facilities not reported in accordance with Part III B 5, including stormwater management facilities installed to control post-development stormwater runoff from land disturbing land-disturbing activities less than one acre in accordance with the Chesapeake Bay Preservation Area Designation and Management Regulations (9VAC25-830), if applicable, and for which a General VPDES Permit for Discharges of Stormwater from Construction Activities was not required.

2. The permittee shall use the DEQ BMP Warehouse to report BMPs that were not reported in accordance with Part III B 1 or B 5 and were implemented as part of a TMDL action plan to achieve nitrogen, phosphorus, and total suspended solids reductions in accordance with Part II A or B.

3. The permittee shall use the DEQ BMP Warehouse to report any BMPs that were not reported in accordance with Part III B 1, B 2, or B 5.

4. The permittee shall use the DEQ BMP Warehouse to report the most recent inspection date for BMPs in accordance with Part I E 5 b or 5 c, or in accordance with Part II C and the most recent associated TMDL action plan.

5. Traditional permittees specified in Part I E 5 a (1) shall use the DEQ Construction Stormwater Database or other application as specified by the department to report each stormwater management facility installed after July 1, 2014, to address the control of post-construction runoff from land disturbing land-disturbing activities for which the permittee is required to obtain a General VPDES Permit for Discharges of Stormwater from Construction Activities.

C. The following information for each new BMP reported in accordance with Part III B 1, B 2, B 3, or B 5 shall be reported to the DEQ BMP Warehouse as applicable:

1. The BMP type;

2. The BMP location as decimal degree latitude and longitude;

3. The acres treated by the BMP, including total acres and impervious acres;

4. The date the BMP was brought online (MM/YYYY). If the date brought online is not known, the permittee shall use 06/2005;

5. The 6th Order Hydrologic Unit Code in which the BMP is located;

6. Whether the BMP is owned or operated by the permittee or privately owned;

7. Whether or not the BMP is part of the permittee's Chesapeake Bay TMDL action plan required in Part II A or local TMDL action plan required in Part II B, or both;

8. If the BMP is privately owned, whether a maintenance agreement exists;

9. The date of the permittee's most recent inspection of the BMP; and

10. Any other information specific to the BMP type required by the DEQ BMP Warehouse (e.g., linear feet of stream restoration).

D. No later than October 1 of each year, the permittee shall electronically report the most recent inspection date for any existing BMP that was previously reported and re-inspected between July 1 and June 30 using the BMP Warehouse. If an existing BMP has not been previously reported, the BMP shall be reported as new in accordance with Part III B and Part III C. No later than October 1 of each year the DEQ BMP Warehouse shall be updated if an existing BMP is discovered between July 1 and June 30 that was not previously reported to the DEQ BMP Warehouse.

E. No later than October 1 of each year the DEQ BMP Warehouse shall be updated if an existing BMP is discovered between July 1 and June 30 that was not previously reported to the DEQ BMP Warehouse.

Part IV

Conditions Applicable to All State and VPDES Permits

NOTE: Discharge monitoring is not required for compliance purposes by this general permit. If the operator chooses to monitor stormwater discharges for informational or screening purposes, the operator does not need to comply with the requirements of Part IV A, B, or C.

A. Monitoring.

1. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity.

2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this state permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services (1VAC30-45 or 1VAC30-46).

3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements.

B. Records.

1. Monitoring records and reports shall include:

a. The date, exact place, and time of sampling or measurements;

b. The individuals who performed the sampling or measurements;

c. The dates and times analyses were performed;

d. The individuals who performed the analyses;

e. The analytical techniques or methods used; and

f. The results of such analyses.

2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this state permit, and records of all data used to complete the registration statement for this state permit, for a period of at least three years from the date of the sample, measurement, report, or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the department.

C. Reporting monitoring results.

1. The operator shall submit the results of the monitoring as may be performed in accordance with this state permit with the annual report unless another reporting schedule is specified elsewhere in this state permit.

2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved, or specified by the department; or in any format provided that the date, location, parameter, method, and result of the monitoring activity are included. Following notification from the department of the start date for the required electronic submission of monitoring reports, as provided for in 9VAC25-31-1020, such forms and reports submitted after that date shall be electronically submitted to the department in compliance with 9VAC25-31-1020 and this section. There shall be at least a three-month notice provided between the notification from the department and the date after which such forms and reports must be submitted electronically.

3. If the operator monitors any pollutant specifically addressed by this state permit more frequently than required by this state permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this state permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department.

4. Calculations for all limitations that require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this state permit.

D. Duty to provide information. The operator shall furnish within a reasonable time, any information that the department may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this state permit or to determine compliance with this state permit. The department or EPA may require the operator to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from the permittee's discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and Virginia Erosion and Stormwater Management Act. The operator shall also furnish to the department or EPA upon request, copies of records required to be kept by this state permit.

E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this state permit shall be submitted no later than 14 days following each schedule date.

F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a MS4.

G. Reports of unauthorized discharges. Any operator of a MS4 who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters shall notify the department of the discharge immediately (see Part IV I 4) upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department within five days of discovery of the discharge. The written report shall contain:

1. A description of the nature and location of the discharge;

2. The cause of the discharge;

3. The date on which the discharge occurred;

4. The length of time that the discharge continued;

5. The volume of the discharge;

6. If the discharge is continuing, how long it is expected to continue;

7. If the discharge is continuing, what the expected total volume of the discharge will be; and

8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this state permit.

Discharges reportable to the department under the immediate reporting requirements of other regulations are exempted from this requirement.

H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge, including a bypass in Part IV U or an upset in Part IV V, should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify (see Part IV I 4), in no case later than within 24 hours, the department after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department within five days of discovery of the discharge in accordance with Part IV I 2. Unusual and extraordinary discharges include any discharge resulting from:

1. Unusual spillage of materials resulting directly or indirectly from processing operations;

2. Breakdown of processing or accessory equipment;

3. Failure or taking out of service some or all of the facilities; and

4. Flooding or other acts of nature.

I. Reports of noncompliance.

1. The operator shall report any noncompliance that may adversely affect surface waters or may endanger public health.

a. A report to the department shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under Part IV I:

(1) Any unanticipated bypass; and

(2) Any upset that causes a discharge to surface waters.

b. A written report shall be submitted within five days and shall contain:

(1) A description of the noncompliance and its cause;

(2) The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and

(3) Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case-by-case basis for reports of noncompliance under Part IV I if the report has been received within 24 hours and no adverse impact on surface waters has been reported.

2. The operator shall report all instances of noncompliance not reported under Part IV I 1 b, in writing, as part of the annual reports that are submitted. The reports shall contain the information listed in Part IV I 2.

3. The immediate (within 24 hours) reports required in Part IV G, H, and I shall be made to the department. Reports may be made by telephone, email, or online at https://www.deq.virginia.gov/our-programs/pollution-response/pollution-data-and-reporting. For reports outside normal working hours, the online portal shall be used. For emergencies, call the Virginia Department of Emergency Management's Emergency Operations Center (24-hours) at 1-800-468-8892.

4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect information in any report, including a registrations statement, to the department, the operator shall promptly submit such facts or correct information.

J. Notice of planned changes.

1. The operator shall give notice to the department as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required only when:

a. The operator plans an alteration or addition to any building, structure, facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-420 9VAC25-875-990:

b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are not subject to effluent limitations in this state permit; or

2. The operator shall give advance notice to the department of any planned changes in the permitted facility or activity that may result in noncompliance with state permit requirements.

K. Signatory requirements.

1. Registration statement. All registration statements shall be signed as follows:

a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;

b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or

c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes:

(1) The chief executive officer of the agency, or

(2) A senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency.

2. Reports and other information. All reports required by state permits, including annual reports, and other information requested by the department shall be signed by a person described in Part IV K 1, or by a duly authorized representative of that person. A person is a duly authorized representative only if:

a. The authorization is made in writing by a person described in Part IV K 1;

b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.); and

c. The signed and dated written authorization is submitted to the department.

3. Changes to authorization. If an authorization under Part IV K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the MS4, a new authorization satisfying the requirements of Part IV K 2 shall be submitted to the department prior to or together with any reports, or information to be signed by an authorized representative.

4. Certification. Any person signing a document under Part IV K 1 or K 2 shall make the following certification:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

L. Duty to comply. The operator shall comply with all conditions of this state permit. Any state permit noncompliance constitutes a violation of the Virginia Erosion and Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this state permit may constitute a violation of the Virginia Erosion and Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for state permit termination, revocation and reissuance, or modification; or denial of a state permit renewal application.

The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this state permit has not yet been modified to incorporate the requirement.

M. Duty to reapply. If the operator wishes to continue an activity regulated by this state permit after the expiration date of this state permit, the operator shall submit a new registration statement at least 90 days before the expiration date of the existing state permit, unless permission for a later date has been granted by the department. The department shall not grant permission for registration statements to be submitted later than the expiration date of the existing state permit.

N. Effect of a state permit. This state permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights, or any infringement of federal, state or local law or regulations.

O. State law. Nothing in this state permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except as provided in state permit conditions on bypassing in Part IV U and upset in Part IV V nothing in this state permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance.

P. Oil and hazardous substance liability. Nothing in this state permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or § 311 of the Clean Water Act.

Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this state permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this state permit.

R. Disposal of solids or sludges. Solids, sludges, or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations.

S. Duty to mitigate. The operator shall take all reasonable steps to minimize or prevent any discharge in violation of this state permit that has a reasonable likelihood of adversely affecting human health or the environment.

T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this state permit.

U. Bypass.

1. "Bypass," as defined in 9VAC25-870-10 9VAC25-875-850, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part IV U 2 and U 3.

2. Notice.

a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days before the date of the bypass.

b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in Part IV I.

3. Prohibition of bypass.

a. Except as provided in Part IV U 1, bypass is prohibited, and the department may take enforcement action against an operator for bypass, unless:

(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage;

(2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and

(3) The operator submitted notices as required under Part IV U 2.

b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part IV U 3 a.

V. Upset.

1. An "upset," as defined in 9VAC25-870-10 9VAC25-875-850, means an exceptional incident in which there is unintentional and temporary noncompliance with technology based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.

2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology-based state permit effluent limitations if the requirements of Part IV V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review.

3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.

4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that:

a. An upset occurred and that the operator can identify the causes of the upset;

b. The permitted facility was at the time being properly operated;

c. The operator submitted notice of the upset as required in Part IV I; and

d. The operator complied with any remedial measures required under Part IV S.

5. In any enforcement proceeding the operator seeking to establish the occurrence of an upset has the burden of proof.

W. Inspection and entry. The operator shall allow the department, EPA, or an authorized representative (including an authorized contractor), upon presentation of credentials and other documents as may be required by law, to:

1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this state permit;

2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this state permit;

3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this state permit; and

4. Sample or monitor at reasonable times, for the purposes of ensuring permit compliance or as otherwise authorized by the Clean Water Act and the Virginia Erosion and Stormwater Management Act, any substances or parameters at any location.

For purposes of this subsection, the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency.

X. State permit actions. State permits may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition.

Y. Transfer of state permits.

1. State permits are not transferable to any person except after notice to the department. Except as provided in Part IV Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Erosion and Stormwater Management Act and the Clean Water Act.

2. As an alternative to transfers under Part IV Y 1, this state permit may be automatically transferred to a new operator if:

a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property;

b. The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility, coverage, and liability between them; and

c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part IV Y 2 b.

Z. Severability. The provisions of this state permit are severable, and if any provision of this state permit or the application of any provision of this state permit to any circumstance is held invalid, the application of such provision to other circumstances, and the remainder of this state permit, shall not be affected thereby.

9VAC25-900-10. Definitions.

The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:

"300 animal units" means the term as defined in 9VAC25-192-10.

"Act" means the Chesapeake Bay Watershed Nutrient Credit Exchange Program, Article 4.02 (§ 62.1-44.19:12 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

"Animal feeding operation" means the term as defined by 9VAC25-31-10.

"Applicant" means the person who submits an application to the department for nutrient credit certification pursuant to this chapter.

"Bankfull event" means the storm event that corresponds with the stream stage at its incipient point of flooding. The bankfull discharge associated with the bankfull event is the flow that transports the majority of a stream's sediment load over time and thereby forms and maintains the channel dimension, pattern, and profile.

"Baseline" means the practices, actions, or levels of reductions that must be in place before credits can be generated. The best management practices to be implemented for achieving baseline are provided in 9VAC25-900-100.

"Best management practice," "practice," or "BMP" means a structural practice, nonstructural practice, or other management practice used to prevent or reduce nutrient loads reaching surface waters or the adverse effects thereof.

"Board" means the State Water Control Board. When used outside the context of the promulgation of regulations, including regulations to establish general permits, "Board" means the Department of Environmental Quality.

"Certification of nutrient credits" or "nutrient credit certification" means the approval of nutrient credits issued by the department as specified in 9VAC25-900-80. Nutrient credit certification does not include the certification of point source credits generated by point sources regulated under the Watershed General Virginia Pollutant Discharge Elimination System Permit issued pursuant to § 62.1-44.19:14 of the State Water Control Law.

"Chesapeake Bay Watershed" means the land areas draining to the following Virginia river basins: the Potomac River Basin, the James River Basin, the Rappahannock River Basin, the Chesapeake Bay and small coastal basins, or the York River Basin.

"Concentrated animal feeding operation" means the term as defined by 9VAC25-31-10.

"Cropland" means land that is used for the production of grain, oilseeds, silage or industrial crops not defined as hay or pasture.

"DCR" means the Department of Conservation and Recreation.

"Delivery factor" means the estimated percentage of a total nitrogen or total phosphorus load delivered to tidal waters as determined by the specific geographic location of the nutrient source. For point source discharges the delivery factor accounts for attenuation that occurs during riverine transport between the point of discharge and tidal waters. For nonpoint source loads the delivery factor accounts for attenuation that occurs during riverine transport as well as attenuation between the nutrient source and the edge of the nearest stream. Delivery factors values shall be as specified by the department. In the Chesapeake Bay Watershed, the Chesapeake Bay Program Partnership's approved delivery factors shall be used.

"Department" means the Department of Environmental Quality.

"Director" means the Director of the Department of Environmental Quality or his designee.

"Exchange" means the transaction in which a person acquires released nutrient credits produced by a nutrient credit-generating project.

"Field office technical guide" or "FOTG" means technical guides about conservation of soil, water, air, and related plant and animal resources and are the primary scientific reference for the U.S. Department of Agriculture's Natural Resource Conservation Service. These guides are used in each field office and are localized so that they apply specifically to the geographic area for which they are prepared.

"Hayland" means land that is used to grow a grass, legume, or other plants such as clover or alfalfa, which is cut and dried for feed.

"Highly erodible soils" means land that is defined as highly erodible by the Sodbuster, Conservation Reserve, and Conservation Compliance parts of the Food Security Act of 1985 (P.L. 99-198) and the Food, Agriculture, Conservation, and Trade Act of 1990 (P.L. 101-624). Lists of highly erodible and potential highly erodible map units are maintained in NRCS field office technical guide.

"HUC" means the hydrologic unit code.

"Impaired waters" means those waters identified as impaired in the 305(b)/303(d) Water Quality Assessment Integrated Report prepared pursuant to § 62.1-44.19:5 of the State Water Control Law.

"Implementation plan" means a plan that has been developed to meet the requirements of 9VAC25-900-120 and is submitted as part of the application.

"Invasive plant species" means non-native plant species that are contained on DCR's Virginia Invasive Plant Species List.

"Innovative practice" means practices or BMPs not approved by the Chesapeake Bay Program Partnership or the Virginia Stormwater BMP Clearinghouse. Nutrient credits generated by innovative practices may only be certified as term credits.

"Landowner" means any person or group of persons acting individually or as a group that owns the parcel on which a nutrient credit-generating project is sited including: (i) the Commonwealth or any of its political subdivisions, including localities, commissions, and authorities; (ii) any public or private institution, corporation, association, firm, or company organized or existing under the laws of this or any other state or country; or (iii) any officer or agency of the United States.

"Land use controls" means legal measures or instruments that restrict the activity, use, and access to property.

"Land use conversion" means a change from a more intensive to less intensive land use resulting in nutrient reductions.

"Management area" means all contiguous parcels deeded to the same landowner that includes the site of the nutrient credit-generating project within its boundaries. The term contiguous means the same or adjacent parcels that may be divided by public or private right-of-way. For a public entity that owns or operates an MS4 and generates credits within the MS4 service area, the management area is the MS4 service area.

"Mitigation" means sequentially avoiding and minimizing impacts to the maximum extent practicable and then compensating for remaining unavoidable impacts of a proposed action.

"Mitigation bank" means a site providing off-site, consolidated compensatory mitigation that is developed and approved in accordance with all applicable federal and state laws or regulations for the establishment, use and operation of mitigation banks and is operating under a signed mitigation banking instrument.

"Mitigation banking instrument" means the legal document for the establishment, operation, and use of a stream or wetland mitigation bank.

"MS4" means a municipal separate storm sewer system as defined in 9VAC25-870-10 9VAC25-875-20.

"MS4 service area" means (i) for Phase I MS4 permittees, the service area delineated in accordance with the permit issued pursuant to 9VAC25-870-380 A 3 9VAC25-875-950 A; and (ii) for Phase II MS4 permittees, the term as described in 9VAC25-890.

"Non-land use conversion" means practices, except for land use conversion, that are used by a nutrient credit-generating project to produce nutrient reductions.

"Nonpoint source pollution" or "nonpoint source" means pollution such as sediment, nitrogen, phosphorus, hydrocarbons, heavy metals, and toxics whose sources cannot be pinpointed but rather are washed from the land surface in a diffuse manner by stormwater runoff.

"NRCS" mean the U.S. Department of Agriculture's Natural Resource Conservation Service.

"Nutrient credit" or "credit" means a nonpoint source nutrient reduction that is certified pursuant to this chapter and expressed in pounds of phosphorus and nitrogen either (i) delivered to tidal waters when the credit is generated within the Chesapeake Bay Watershed or (ii) as otherwise specified when generated in the Southern Rivers watersheds. Nutrient credit does not include point source nitrogen credits or point source phosphorus credits as defined in § 62.1-44.19:13 of the Code of Virginia.

"Nutrient credit-generating entity" means an entity that implements practices for the generation of nonpoint source nutrient credits.

"Nutrient credit-generating project" or "project" means a project developed to reduce the load of nitrogen and phosphorous nonpoint source pollution in order to generate nutrient credits for certification pursuant to this chapter.

"Nutrient reductions" means the reduction in the load of nitrogen and phosphorous nonpoint source pollution.

"Owner" means the Commonwealth or any of its political subdivisions, including sanitation district commissions and authorities and any public or private institution, corporation, association, firm, or company organized or existing under the laws of this or any other state or country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates, charters, rents, or otherwise exercises control over or is responsible for any nutrient credit-generating project.

"Pasture" means land that supports the grazing of domesticated animals for forages.

"Performance standards" means the minimum objectives or specifications required of a particular management practice by the department in order to assure predicted nutrient reductions will be achieved.

"Perpetual nutrient credits" or "perpetual credits" mean credits that are generated by practices that result in permanent nutrient reductions from baseline and certified as permanent in accordance with this chapter.

"Person" means any individual, corporation, partnership, association, state, municipality, commission, or political subdivision of a state, governmental body, including a federal, state, or local entity as applicable, any interstate body or any other legal entity.

"Potential nutrient credits" means the possible credits generated by a nutrient credit-generating project as calculated pursuant to 9VAC25-900-110. These potential nutrient credits shall be expressed in terms of the estimated number of phosphorus and nitrogen credits generated.

"Redevelopment" means a project that includes new development on previously developed land.

"Registry" means the online Virginia Nutrient Credit Registry established and maintained by the department in accordance with § 62.1-44.1.19:20 D of the Code of Virginia.

"Released nutrient credit" means credits that the department has determined to be eligible for placement on the Virginia Nutrient Credit Registry.

"Restoration" means the reestablishment of a wetland, stream, or other aquatic resource in an area where it previously existed. Wetland restoration means the reestablishment of wetland hydrology, soils, and vegetation in an area where a wetland previously existed. Stream restoration means the process of converting an unstable, altered, or degraded stream corridor, including adjacent areas and floodplains, to its natural conditions.

"Retrofit" means a project that provides improved nutrient reductions to previously developed land through the implementation of new BMPs or upgrades to existing BMPs.

"Site" means the physical location within the management area where the nutrient credit-generating project and its associated practices, both baseline and credit-generating, are located.

"Site protection instrument" means a deed restriction, conservation easement, or other legal mechanism approved by the department that provides assurance that the credits will be maintained in accordance with this chapter and the certification requirements.

"Southern Rivers watersheds" means the land areas draining to the following river basins: the Albemarle Sound, Coastal; the Atlantic Ocean, Coastal; the Big Sandy River Basin; the Chowan River Basin; the Clinch-Powell River Basin; the New Holston River Basin (Upper Tennessee); the New River Basin; the Roanoke River Basin; or the Yadkin River Basin.

"State waters" means all water, on the surface and under the ground, wholly or partially within or bordering the Commonwealth or within its jurisdiction, including wetlands.

"Steward" or "long-term steward" means any person who is responsible for implementation of the long-term management plan of a perpetual nutrient credit-generating project.

"Structural BMPs" means any man-made stormwater control measure or feature that requires routine maintenance in order to function or provide the hydrologic, hydraulic, or water quality benefit as designed. Structural practices include bioretention, infiltration facilities, wet ponds, extended detention, wet and dry swales, permeable pavement, rainwater harvesting, vegetated roofs, underground or surface chambers or filters, and other manufactured treatment devices (MTDs).

"T" means the soil loss tolerance rate as defined by the NRCS.

"Term nutrient credit" or "term credit" means nutrient reduction activities that generate credits for a determined and finite period of at least one year but no greater than five years.

"Total maximum daily load" or "TMDL" means the sum of the individual wasteload allocations (WLAs) for point sources, load allocations (LAs) for nonpoint sources, natural background loading, and a margin of safety. TMDLs can be expressed in terms of either mass per time, toxicity, or other appropriate measure. The TMDL process provides for point versus nonpoint source trade-offs. TMDLs in Virginia are expressed as both a daily load and an annual load. For nutrient trading, annual loads are most often utilized.

"Tributary" means those river basins for which separate tributary strategies were prepared pursuant to § 2.2-218 of the Code of Virginia and includes the Potomac, Rappahannock, York, and James River basins, and the Eastern Coastal Basin, which encompasses the creeks and rivers of the Eastern Shore of Virginia that are west of Route 13 and drain into the Chesapeake Bay. For areas outside of the Chesapeake Bay Watershed, "tributary" includes the following watersheds: Albemarle Sound, Coastal; Atlantic Ocean, Coastal; Big Sandy; Chowan; Clinch-Powell; New Holston (Upper Tennessee); New River; Roanoke; and Yadkin.

"Urban lands" means lands characterized by developed areas with buildings, asphalt, concrete, suburban gardens, and a systematic street pattern. Classes of urban development include residential, commercial, industrial, institutional, transportation, communications, utilities, and mixed urban. Undeveloped land surrounded by developed areas, such as cemeteries, golf courses, and urban parks is recognized as urban lands.

"VACS BMP Manual" means the Virginia Agricultural Cost Share BMP Manual.

"VESMP authority" means a Virginia erosion and stormwater management program authority as defined in 9VAC25-875-20.

"Virginia Chesapeake Bay TMDL Watershed Implementation Plan," "Watershed Implementation Plan," or "WIP" means the Phase I watershed implementation plan strategy submitted by Virginia and approved by the U.S. Environmental Protection Agency (EPA) in December 2010 to meet the nutrient and sediment allocations prescribed in the Chesapeake Bay Watershed TMDL or any subsequent revision approved of EPA.

"Virginia Erosion and Stormwater Management Program" or "VESMP" means a program established by a VESMP authority for the effective control of soil erosion and sediment deposition and the management of the quality and quantity of runoff resulting from land-disturbing activities to prevent the unreasonable degradation of properties, stream channels, waters, and other natural resources. The program shall include such items as local ordinances, rules, requirements for permits and land-disturbance approvals, policies and guidelines, technical materials, and requirements for plan review, inspection, and enforcement consistent with the requirements of the Virginia Erosion and Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia).

"Virginia Pollutant Discharge Elimination System permit" or "VPDES permit" means a document issued by the department pursuant to the State Water Control Law authorizing, under prescribed conditions, the potential or actual discharge of pollutants from a point source to surface waters and the use or disposal of sewage sludge.

"Virginia Stormwater Management Program" or "VSMP" means a program to manage the quality and quantity of runoff resulting from land-disturbing activities and includes such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, and enforcement, where authorized in the Stormwater Management Act and pursuant to 9VAC25-870, 9VAC25-880, or 9VAC25-890 established by the department pursuant to § 62.1-44.15:27.1 of the Code of Virginia on behalf of a locality on or after July 1, 2014, to manage the quality and quantity of runoff resulting from any land-disturbing activity that (i) disturbs one acre or more of land or (ii) disturbs less than one acre of land and is part of a larger common plan of development or sale that results in one acre or more of land disturbance.

"Virginia Water Protection permit" or "VWP permit" means an individual or general permit issued by the department under § 62.1-44.15:20 of the Code of Virginia that authorizes activities otherwise unlawful under § 62.1-44.5 of the Code of Virginia or otherwise serves as Virginia's Section 401 certification.

"VPA" means Virginia Pollution Abatement.

"VPDES" means Virginia Pollutant Discharge Elimination System.

"VSMP authority" means a Virginia stormwater management program authority as defined in 9VAC25-870-10 9VAC25-875-20.

"VWP" means Virginia Water Protection.

"Water body with perennial flow" means a body of water that flows in a natural or man-made channel year-round during a year of normal precipitation as a result of groundwater discharge or surface runoff. Such water bodies exhibit the typical biological, hydrological, and physical characteristics commonly associated with the continuous conveyance of water.

"Water Quality Guide" means Virginia's Forestry Best Management Practices for Water Quality.

"Wetlands" means those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.

9VAC25-900-40. Relationship to other laws and regulations.

A. Specific requirements regarding the use of nutrient credits are found in the following regulations and statutes:

1. Virginia Erosion and Stormwater Management Program (VSMP) Regulation (9VAC25-870 9VAC25-875).

a. VSMP Individual VPDES Permits for Discharges from Construction Activities. As specified in § 62.1-44.19:21 B of the Act, those applicants required to comply with water quality requirements for land-disturbing activities operating under a construction individual permit issued pursuant to 9VAC25-870 9VAC25-875 may acquire and use perpetual nutrient credits placed on the registry for exchange.

b. VSMP Individual Permits for Municipal Separate Storm Sewer Systems. As specified in § 62.1-44.19:21 A of the Act, an MS4 permittee may acquire, use, and transfer nutrient credits for purposes of compliance with any wasteload allocations established as effluent limitations in an MS4 individual permit issued pursuant to 9VAC25-870 9VAC25-875. Such method of compliance may be approved by the department following review of a compliance plan submitted by the permittee that includes the use of nutrient credits and is in accordance with the provisions of § 62.1-44.19:21 A.

2. General VPDES Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). As specified in § 62.1-44.19:21 B of the Act, those applicants required to comply with water quality requirements for land-disturbing activities operating under a general VSMP VPDES permit for discharges of stormwater from construction activities issued pursuant to 9VAC50-880 may acquire and use perpetual nutrient credits placed on the registry for exchange.

3. General VPDES Permit for Discharges of Stormwater from Small Municipal Separate Storm Sewer Systems (9VAC25-890). As specified in § 62.1-44.19:21 A of the Act, an MS4 permittee may acquire, use, and transfer nutrient credits for purposes of compliance with any wasteload allocations established as effluent limitations in an MS4 general permit issued pursuant to 9VAC25-890. Such method of compliance may be approved by the department following review of a compliance plan submitted by the permittee that includes the use of nutrient credits and is in accordance with the provisions of § 62.1-44.19:21 A.

4. Virginia Pollutant Discharge Elimination System (VPDES) Permit Regulation (9VAC25-31). As specified in § 62.1-44.19:21 C of the Act, owners of confined or concentrated animal feeding operations issued individual permits pursuant to 9VAC25-31 may acquire, use, and transfer credits for compliance with any wasteload allocations contained in the provisions of a VPDES permit. Such method of compliance may be approved by the department following review of a compliance plan submitted by the permittee that includes the use of nutrient credits.

5. Virginia Pollutant Discharge Elimination System (VPDES) Permits for Discharges of Storm Water Associated with Industrial Activity. As specified in § 62.1-44.19:21 D of the Act, owners of facilities registered for coverage under 9VAC25-151 for the general VPDES permit or issued a VPDES permit regulating stormwater discharges that requires nitrogen and phosphorus monitoring at the facility may acquire, use, and transfer credits for compliance with any wasteload allocations established as effluent limitations in a VPDES permit. Such method of compliance may be approved by the department following review of a compliance plan submitted by the permittee that includes the use of nutrient credits.

6. General Virginia Pollutant Discharge Elimination System (VPDES) Watershed Permit Regulation for Total Nitrogen and Total Phosphorus Discharges and Nutrient Trading in the Chesapeake Bay Watershed in Virginia (9VAC25-820). Nutrient credits certified pursuant to this chapter may be acquired to offset mass loads of total nitrogen or total phosphorus discharged by new or expanded facilities regulated by 9VAC25-820.

B. This chapter shall not be construed to limit or otherwise affect the authority of the department to establish and the department to enforce more stringent water quality-based effluent limitations for total nitrogen or total phosphorus in permits where those limitations are necessary to protect local water quality. The exchange or acquisition of credits pursuant to this chapter shall not affect any requirement to comply with such local water quality-based limitations.

9VAC25-900-60. Limitations, liability, and prohibitions.

A. Except to the extent it may be an owner as defined by this chapter, none of the following shall have responsibility or liability for the performance of practices at a nutrient credit-generating project evaluated using the procedures established in this chapter: (i) the department, (ii) a VSMP VESMP authority, or (iii) any political subdivision of the Commonwealth.

B. Those persons with whom the department contracts, including those serving as technical evaluators on an advisory committee, are advisors to the department, and the department remains solely responsible for decisions made regarding implementation of this chapter.

C. For the purposes of this chapter, the certification of nutrient credits that are generated from practices funded in part or in whole by federal or state water quality grant funds is prohibited other than controls and practices under § 62.1-44.19:20 B 1 a of the Act; however, establishing baseline as specified in 9VAC25-900-100 may be achieved through the use of such grants.

D. The option to acquire nutrient credits for compliance purposes shall not eliminate any requirement to comply with local water quality requirements, including such requirements lawfully imposed by a locality or local MS4.

E. The issuance of a nutrient credit certification under this chapter does not convey any property rights of any sort or any exclusive privilege.

F. The issuance of a nutrient credit certification under this chapter does not authorize any injury to persons or property or invasion of other private rights, or any infringement of state or local law or regulations.

G. Nutrient credit certifications are not transferable except in accordance with 9VAC25-900-180. The department may require modification or revocation and reissuance of nutrient credit certifications to change the name of the owner of the nutrient credit-generating project and incorporate such other requirements as may be necessary under the State Water Control Law or the Clean Water Act.

H. No person shall offer for exchange nutrient credits except in compliance with the provisions of this chapter.

I. No nutrient credit shall be generated by practices previously implemented to comply with: (i) the requirements for a VPDES (9VAC25-31), VPA (9VAC25-32), VWP (9VAC25-210), or VSMP (9VAC25-870) VPDES construction general permit (9VAC25-880); (ii) erosion and sedimentation control requirements pursuant to 9VAC25-840 9VAC25-875; or (iii) the requirements of the Chesapeake Bay Preservation Act pursuant to § 62.1-44.15:67-79 of the Code of Virginia.

J. Nutrient credit generation and use shall be contemporaneous with the applicable permit's compliance period.

9VAC25-900-90. Nutrient credit release and registration.

A. Retirement of credits.

1. Pursuant to the requirements of § 62.1-44.19:20 of the Act, 5.0% of the total credits certified will be retired by the department at the time of nutrient credit certification and will not be placed on the registry for exchange.

2. When phosphorus credits are acquired in accordance with 9VAC25-870-69 9VAC25-875-610, the associated nitrogen credits generated by the nutrient credit-generating project will be retired and removed from the registry by the department.

3. When nitrogen credits are acquired for purposes other than compliance with 9VAC25-870-69 9VAC25-875-610, the associated phosphorus credits generated by the nutrient credit-generating project shall not be available for compliance under 9VAC25-870-69 9VAC25-875-610.

4. Except as limited by this subsection, associated nitrogen and phosphorus credits generated by a nutrient credit-generating project may be exchanged independently.

B. Schedule of release of nutrient credits. The department shall establish a schedule for release of credits as follows:

1. For nutrient credit-generating projects using land use conversion, 25% of the credits will be released by the department after the department has verified completion of the conditions of the nutrient credit certification. For afforestation projects, an additional 25% of credits will be released by the department after the site has been planted with a minimum of 400 woody stems per acre. The remaining balance of credits will be released by the department after it is satisfied that the implementation plan's performance criteria required pursuant to 9VAC25-900-120 has been achieved. When a request for credit release is made concurrently with the application for nutrient credit certification from land conversion practices, the concurrent 25% initial release, and additional 25% release if planting has occurred, shall be processed on the same timeline as the application as provided in 9VAC25-900-80 C. When the request for credit release is from a previously approved land conversion project, the department shall schedule a site visit, if warranted, within 30 days of the request and shall deny, approve, or approve with conditions the release of the remaining 75% of the nutrient credits within 15 days of the site visit or determination that a site visit is not warranted.

2. For nutrient credit-generating projects using wetland or stream restoration, after construction 25% of the credits may be released by the department after the department has verified completion of the conditions of the nutrient credit certification. Every monitoring year thereafter, 25% of the credits may be released if all performance standards are met, the area or channel is stable, and, for streams, evidence is presented that a bankfull event occurred within the monitoring year. For streams, if a bankfull event did not occur, but performance standards are met and the channel is stable, 10% of the credits may be released. No additional credits will be released after the fourth monitoring year until a bankfull event has occurred. After the fourth monitoring year, if a bankfull event occurs, the channel is stable, and all performance standards are met, 25% of the credits may be released that monitoring year, not to exceed the remaining credits available. The schedule for release of credits shall also require, prior to the release of credits, the approval of any required financial assurance mechanism established pursuant to Part VI (9VAC25-900-230 et seq.) of this chapter. The department may accelerate the release of a maximum of 50% of nutrient credits from a stream restoration project based on (i) a determination that the level of risk for restoration failure is low; (ii) the provision of additional financial assurance in an amount adequate to cover the cost of project repair or replacement in the event of failure; and (iii) the experience of the applicant or the applicant's agents who will implement the stream restoration project.

3. For nutrient credit-generating projects using practices other than land use conversion or wetland or stream restoration, the schedule for release of credits will be determined by the department on a case-by-case basis and provided to the applicant with the nutrient credit certification. For projects using structural BMPs, the schedule shall also require, prior to release of credits, the approval of any required financial assurance mechanism established pursuant to Part VI (9VAC25-900-230 et seq.) of this chapter.

C. Registration of nutrient credits. Credits will be placed on the registry and classified as term or perpetual credits by the department. The registry will also indicate the number of credits that have been released for exchange. Only credits released by the department are available for exchange.

9VAC25-900-100. Establishing baseline.

A. Practices for establishing baseline must be in place prior to the generation of any credits by a nutrient credit-generating project except in the case of land use conversion as described in subsection E of this section. The practices for establishing baselines, as provided in this section, shall be implemented and properly maintained for each type of operation within the management area. Baselines are applicable statewide for nutrient credit-generating projects including those located in either the Chesapeake Bay Watershed or the Southern Rivers watersheds. Baseline practices are, at a minimum, in accordance with the requirements of the WIP or an approved TMDL, whichever is more stringent.

B. Cropland, hayland, and pastures. Baselines for cropland, hayland, or pastures within the management area shall be established in accordance with subdivision 1, 2, or 3 of this subsection.

1. The owner holds a valid Certificate of Resource Management Plan Implementation for the management area that has been issued pursuant to the Resource Management Plans regulation (4VAC50-70).

2. If the owner does not hold a valid Certificate of Resource Management Plan Implementation for the management area, the owner shall implement the following practices for establishing baseline:

a. Soil conservation. Soil conservation practices for the management area shall be implemented and maintained to achieve a maximum soil loss rate not to exceed "T" and to address gross erosion when it is present as gullies or other severely eroding conditions.

b. Nutrient management. Implementation and maintenance of the nutrient management practices required by the nutrient management plan written by a certified nutrient management planner pursuant to the Nutrient Management Training and Certification Regulations (4VAC50-85).

c. Riparian buffer. A woodland or grass riparian buffer shall be installed and maintained around all water bodies with perennial flow within the management area and shall be installed and maintained along all water bodies with perennial flow bordering the management area. The riparian buffer shall be a minimum width of 35 feet as measured from the top of the channel bank to the edge of the cropland, hayland, or pasture and in accordance with DCR Specifications for NO. FR-3 or DCR Specifications for NO. WQ-1 contained in the VACS BMP Manual.

d. Cover crop. For croplands, cover crops shall be planted to meet the standard planting date and other specifications in accordance with DCR Specifications for NO. SL-8B contained in the VACS BMP Manual. This requirement applies to all croplands where summer annual crops are grown and the summer annual crop receives greater than a total of 50 pounds per acre of nitrogen application from any nutrient source; however, if the cropland is planted to winter cereal crops for harvest in the spring, then cover crops do not need to be planted on these croplands during that production year.

e. Livestock water body exclusion. For pastures or when livestock are present within the management area, livestock exclusion fencing shall be placed around perennial streams, rivers, lakes, ponds, or other water bodies having perennial flow. This exclusionary fencing shall be constructed in accordance with DCR Specification NO. WP-2W contained in the VACS BMP Manual in order to restrict livestock access to the water body. Livestock shall be provided with an alternative watering source. The livestock exclusion fencing shall be placed at least 35 feet from the top of the channel bank and this exclusion zone shall contain the riparian buffer required by subdivision 2 c of this subsection. Access points for livestock watering or crossing over a water body shall be a hardened surface constructed to DCR Specifications for NO. WP-2W contained in the VACS BMP Manual and shall be fenced to limit livestock access to the water body at the crossing point. Ponds that have been specifically built for the purpose of livestock watering and that do not have perennial flow through an overflow pipe or spillway are not required to meet the provisions of this subdivision 2 e.

3. The department may approve a load-based baseline determination equivalent to full implementation of the practices identified in subdivision 2 of this subsection.

C. Agricultural animal feeding operations. Baselines for agricultural animal feeding operations within the management area shall be established in accordance with either subdivision 1 or 2 of this subsection:

1. The animal feeding operation is in compliance with a valid VPDES or VPA permit in compliance with the board's regulations.

2. For animal feeding operations excluded from or not required to hold a VPDES or VPA permit under the board's regulations, the practices for establishing baseline shall be implemented and properly maintained as required in this subdivision 2.

a. Implementation and maintenance of the nutrient management practices required by the nutrient management plan written by a certified nutrient management planner pursuant to the Nutrient Management Training and Certification Regulations (4VAC50-85).

b. For animal feeding operations, except confined poultry operations, a storage facility designed and operated to prevent point source discharges of pollutants to state waters except in the case of a storm event greater than a 25-year/24-hour storm and to provide adequate waste storage capacity to accommodate periods when the ground is frozen or saturated, periods when land application of nutrients should not occur due to limited or nonexistent crop nutrient uptake, and periods when physical limitations prohibit the land application of waste shall be implemented and maintained.

c. For confined poultry operations, storage of poultry waste according to the nutrient management plan and in a manner that prevents contact with surface water and groundwater. Poultry waste that is stockpiled outside of the growing house for more than 14 days shall be kept in a facility or at a location that provides adequate storage. Adequate storage management practices shall meet the following minimum requirements:

(1) The poultry waste shall be covered to protect it from precipitation and wind.

(2) Stormwater shall not run onto or under the area where the poultry waste is stored.

(3) The ground surface of the poultry waste storage area shall have a minimum of two feet separation distance to the seasonal high water table. If poultry waste is stored in an area where the seasonal high groundwater table lies within two feet of the ground surface, the storage area shall be underlain by a low-permeability, hard-surfaced barrier such as concrete or asphalt.

(4) For poultry waste that is not stored inside or under a roofed structure, the storage area must be at least 100 feet from any surface water, intermittent drainage, wells, sinkholes, rock outcrops, and springs.

D. Urban practices. Achievement of baseline for new development, redevelopment, or retrofits to existing development shall be required prior to generation of credits. These baselines are:

1. For new development and redevelopment, baseline shall be achieved through compliance with the post-construction water quality design criteria requirements of the Virginia Erosion and Stormwater Management Program (VSMP) Regulation under 9VAC25-870-63 9VAC25-875-580. Additionally, for development in a locality with a local stormwater management design criteria more stringent than 9VAC25-870-63 9VAC25-875-580, baselines shall be achieved through compliance with the local stormwater management ordinance.

2. For retrofits within the Chesapeake Bay Watershed, baseline shall be at a level necessary to achieve the nutrient reduction assigned in the urban sector of the WIP or the approved local TMDL, whichever is more stringent.

3. For retrofits within the Southern Rivers watersheds and within a watershed with an approved TMDL with total phosphorus or total nitrogen allocations, baselines shall be at a level necessary to achieve reductions of the approved TMDL. For all other retrofits within the Southern Rivers watersheds, baseline shall be achieved through compliance with the post-construction water quality design criteria requirements for development on prior developed lands pursuant to 9VAC25-870-63 9VAC25-875-580 A 2.

4. No credits may be certified for a nutrient credit-generating project owned by an MS4 permittee and located within the permittee's MS4 service area until the level of nutrient reduction required by the WIP or approved TMDL, whichever is more stringent, is achieved for the entire MS4 service area. MS4 permittees generating credits for exchange shall have an accounting system demonstrating that the exchanged credits are not used to satisfy the MS4 permit requirements.

E. Land use conversions. Baselines for land use conversion shall be established using the preconversion land use. The preconversion land use shall be based on the land use as of (i) July 1, 2005, for a nutrient credit-generating project located within the Chesapeake Bay Watershed; (ii) the date of the approved TMDL for a nutrient credit-generating project located within a TMDL watershed but not within the Chesapeake Bay Watershed; or (iii) July, 1, 2009, for a nutrient credit-generating project not within an approved TMDL watershed or the Chesapeake Bay Watershed.

F. Stream or wetland restoration. Baseline for stream restoration shall be established using the pre-restoration condition of the stream. Baseline for wetland restoration shall be established on a case-by-case basis, depending on the current land use of the proposed wetland restoration area.

G. Other nutrient credit-generating projects. The department shall establish baselines for other nutrient credit-generating projects not otherwise regulated by subsections B through F of this section. The practices necessary for establishing baseline at these other nutrient credit-generating projects shall be in accordance with the requirements of the WIP or the approved TMDL and shall utilize the best available scientific and technical information regarding the practices.

9VAC25-900-110. Credit calculation procedures.

A. Pursuant to this section, the applicant shall calculate the potential nutrient credits generated by the practices implemented at the nutrient credit-generating projects. The applicable delivery factors, dependent upon the tributary in which the nutrient credit-generating project is located, shall be applied when calculating the potential credits generated.

B. For agricultural practices, except land use conversion, the potential nutrient credits shall be calculated using removal efficiencies for practices approved by the department. In the Chesapeake Bay Watershed, these practices shall be approved by the department based on the efficiencies assigned by the Chesapeake Bay Program. In the Southern Rivers watersheds, these practices shall be approved by the department based on submitted calculations and demonstrations. The standards and specifications for implementation of the practices will be established by the department and shall be in accordance with the VACS BMP Manual or the FOTG, as applicable.

C. For urban practices, the potential nutrient credits shall be calculated using the applicable removal efficiencies pursuant to 9VAC25-870-65 9VAC25-875-590 or using the best available scientific and technical information available at the time of nutrient credit certification as approved by the department. Limitations on potential nutrient credits from certain BMPs are:

1. In the Chesapeake Bay Watershed, nutrient load reductions from practices in place prior to July 1, 2005, may not be used to generate credits. Removal efficiencies shall be based upon those efficiencies approved by the Chesapeake Bay Program partnership where applicable. These efficiencies shall be reviewed at the time of certification renewal and adjusted as necessary based upon changes made by the Chesapeake Bay Program Partnership.

2. In the Southern Rivers watersheds, nutrient load reductions from practices in place prior to July 1, 2009, may not be used to generate credits.

D. For land use conversions, conversion of land to a more intensive land use activity will not generate nutrient credits. The number of potential nutrient credits shall be determined by calculating the nutrient credits per acre and multiplying that number by the total acreage that will undergo land use conversion. The nutrient credits per acre is equal to the amount calculated by subtracting the load per acre of nutrient nonpoint source pollution for the proposed land use after conversion from the load per acre for the preconversion land use. The values used for the loadings per acre in this calculation shall be based on the applicable loading levels provided in the WIP or the approved TMDL, where applicable. The preconversion land use shall be based on the land use as of the date specified in 9VAC25-900-100 E. The load per acre for the preconversion land use shall reflect the implementation of any applicable baseline practices necessary to comply with 9VAC25-900-100 B, C, and D. No credits shall be generated from the conversion of land within 35 feet of a water body with perennial water flow as measured from the top of the channel bank.

E. For wetland or stream restoration, an existing conditions assessment survey will be completed prior to restoration activities to use as a pre-restoration condition (baseline pursuant to of 9VAC25-900-100 F) and will be used for comparison to post-restoration conditions. The potential number of credits shall be determined by applying protocols or guidance on a case-by-case basis using the best available scientific and technical information, as approved by the department.

F. For a practice not previously approved by the department, the department will perform a case-by-case review in order to calculate the number of potential nutrient credits generated. The owner shall submit the removal efficiency calculation information for the practice and the calculation of the potential number of credits generated using that efficiency. The department may also request that the submittal include requirements for demonstration projects, the collection of sufficient data to evaluate the results, and any other information the department deems necessary to determine the validity of the credits. In the Chesapeake Bay Watershed, for a practice not approved by the Chesapeake Bay Program Partnership, the department will perform a case-by-case review in order to calculate the number of potential nutrient credits generated on a term basis.

G. In the certification and recertification of credits, the department may substitute a delivery factor that is deemed by the director to be based on the best available scientific and technical information appropriate for the tributaries located outside of the Chesapeake Bay Watershed as an alternative to any delivery factor derived from the application of the Chesapeake Bay Program watershed model.

9VAC25-900-120. Implementation plan.

A. The implementation plan submitted pursuant to 9VAC25-900-80 shall provide information detailing how the nutrient credit-generating project will generate credits for the term of the credits. The implementation plan will include the applicable information as required in subsections B through J of this section.

B. For all nutrient credit-generating projects, the implementation plan shall include:

1. An operation and maintenance plan that provides a description and schedule of operation and maintenance requirements and detailed written specifications and process diagrams for the practices used at the nutrient credit-generating project. The plan must be adhered to for the term of the credits and shall include a description of site management activities to be performed after meeting all performance standards to ensure long-term sustainability of the site.

2. The performance standards that shall be used to evaluate whether the nutrient credit-generating project is generating credits as calculated in 9VAC25-900-110.

3. Applicable requirements for the project required pursuant to Part IV (9VAC25-900-140 et seq.) of this chapter.

C. For nutrient credit-generating projects utilizing managed afforestation land use conversion, the implementation plan shall also include:

1. A project plan submitted in the form required by the department and prepared by a person trained in (i) forestry management, (ii) nutrient management, or (iii) other applicable land management training that includes an understanding of whole land management planning. The project plan shall include (i) methods for invasive plant species control and eradication if woody invasive plant species impacts 5.0% or more of the nutrient credit-generating project's acreage; (ii) a requirement that any harvesting of timber shall adhere to best management practices as set forth by Department of Forestry's Water Quality Guide and any other applicable local, state, or federal laws or requirements; (iii) the land management goals; (iv) a statement that no fertilizer is to be used on the nutrient credit-generating project's land conversion acreage for the term of the credit generated; (v) a planting plan to include size, species, and spacing of trees; and (vi) any planting phases planned for the project if the area will not be planted all at one time, but will be planted in different phases. Additionally, if timbering is planned within the land conversion area, a copy of the timbering plan shall be submitted to the department at least 90 days prior to the occurrence of any land disturbance or timbering.

2. Provisions for planting forests to achieve an initial survival density of a minimum of 400 deciduous tree or evergreen tree woody stems per acre including any noninvasive volunteers. Survival of planted deciduous trees shall not be established until the start of the second complete growing season following planting. Survival of planted evergreen trees may be established after completion of the first complete growing season following planting. Survival of mixed specie plantings with a minimum of 200 evergreen trees per acre may be established after completion of the first complete growing season following planting.

3. A description of agricultural baseline requirements implemented in accordance with 9VAC50-900-100 B and C that apply to any remaining portions of the management area that are not undergoing land use conversion.

4. Performance standards and reporting procedures demonstrating ongoing compliance with the baseline requirements of 9VAC25-900-100 B and C.

D. For nutrient credit-generating projects utilizing natural succession land use conversion, the implementation plan shall also include provisions for:

1. Forests to achieve an initial density of a minimum of 400 noninvasive woody stems per acre.

2. Invasive plant species control and eradication if woody invasive plant species impacts 5.0% or more of the nutrient credit-generating project's acreage.

3. A description of agricultural baseline requirements implemented in accordance with 9VAC25-900-100 B and C that apply to any remaining portions of the management area not undergoing land use conversion.

4. Performance standards for demonstrating ongoing compliance with the agricultural baseline requirements of 9VAC25-900-100 B and C.

E. For nutrient credit-generating projects utilizing other land use conversion not subject to either subsection C, D, or G of this section, the implementation plan shall also include:

1. Description of the land use conversion project and its implementation and maintenance criteria.

2. Description of the applicable baseline practices implemented in accordance with 9VAC25-900-100 for the management area including the nutrient credit-generating project.

3. Performance standards and reporting procedures demonstrating ongoing compliance with the baseline practices requirements of 9VAC25-900-100.

F. For nutrient credit-generating projects utilizing non-land use conversion agricultural practices, the implementation plan shall also include:

1. A description of the entire management area. This description shall include (i) the acreage and use including descriptions for the proposed practices of the nutrient credit-generating project and baseline area; (ii) water features including all streams, ponds, lakes, and wetlands; (iii) environmentally sensitive sites as defined in 4VAC50-85-10; (iv) areas with highly erodible soils; and (v) the current agricultural operations, crops, or animal facilities.

2. Copies of the current nutrient management plans developed by a certified nutrient management planner and approved by the department and any soil conservation plans completed by a certified conservation planner.

3. Information on the location and status of all existing and proposed BMPs including implementation schedules, lifespan, and maintenance procedures for each BMP that constitutes the baseline requirements.

G. For nutrient credit-generating projects utilizing approved wetland and stream mitigation projects pursuant to § 62.1-44.15:23 of the Code of Virginia, the implementation plan shall also include:

1. A copy of the approved mitigation banking instrument.

2. A plan view map clearly delineating and labeling areas to be considered for credit conversion.

3. A spreadsheet or table listing each labeled area. For each labeled area, the table shall include:

a. The type of eligible land use conversion or restoration practice;

b. The acreage or linear feet of the area;

c. The available mitigation credits;

d. The potential nutrient credits; and

e. The ratio of mitigation credits to nutrient credits.

4. Documentation that complies with the department-approved procedure to ensure credits are not used for both wetland or stream credit and nutrient credit purposes.

5. Documentation shall include written approval from the Interagency Review Team, which oversees stream and wetland mitigation projects pursuant to 33 CFR 332.8 and § 62.1-44.15:23 of the Code of Virginia, to establish a nutrient credit generating site within an approved mitigation bank.

H. For nutrient credit-generating projects utilizing proposed new wetland or stream restoration projects not subject to 33 CFR 332.8 and § 62.1-44.15:23 of the Code of Virginia, the implementation plan shall also include, where appropriate to the type of restoration and project:

1. Certification that the owner will obtain all appropriate permits or other authorizations needed to construct and maintain the restoration activities, prior to initiating work in state waters.

2. An initial wetland restoration plan, which shall include the following:

a. The goals and objectives in terms of proposed nutrient reductions and restoration activities;

b. A detailed location map (e.g., a U.S. Geologic Survey topographic quadrangle map) including latitude and longitude to the nearest second and the hydrologic unit code (HUC) at the center of the site;

c. A description of the surrounding land use;

d. A hydrologic analysis, including a draft water budget based on expected monthly inputs and outputs that will project water level elevations for a typical year, a dry year, and a wet year;

e. The groundwater elevation data or, if not available, the proposed location of groundwater monitoring wells to collect this data;

f. Wetland delineation confirmation and data sheets and maps for existing surface water areas on the proposed site;

g. A preliminary grading plan;

h. A preliminary wetland planting scheme, including suggested plant species and zonation of each vegetation type proposed;

i. Descriptions of existing soils, including general information on topsoil and subsoil conditions, permeability, and the need for soil amendments;

j. A preliminary design of any water control systems or structures for wetland restoration or establishment;

k. Depiction of any land conversion or other buffer areas associated with the nutrient credit-generating entity;

l. A description of any structures or features necessary for the success of the site; and

m. A preliminary schedule for site construction.

3. An initial stream restoration plan, which shall include the following:

a. The goals and objectives in terms of proposed nutrient reductions and restoration activities;

b. A detailed location map (e.g., a U.S. Geologic Survey topographic quadrangle map), including the latitude and longitude (to the nearest second) and the hydrologic unit code (HUC) at the center of the site;

c. A description of the surrounding land use;

d. The preliminary proposed stream segment restoration locations, including plan view, profile, and cross-section sketches;

e. The existing stream deficiencies that need to be addressed;

f. The proposed restoration measures to be employed, including channel measurements, proposed design flows, types of instream structures, and conceptual planting scheme for streambank plantings;

g. Reference stream data, if available;

h. Depiction of any land conversion or other buffer areas associated with the nutrient credit-generating project; and

i. A preliminary schedule for site construction.

4. Prior to construction of the restoration site, the following final plans shall be submitted where appropriate to the type of restoration:

a. The final wetland restoration plan, which shall include all of the items listed in subdivision H 2 of this section and the following:

(1) A summary of the type and acreage of existing stream and wetland impacts anticipated during the construction of the restoration site and the proposed compensation for these impacts;

(2) A site access plan;

(3) An erosion and sediment control plan meeting the requirements of 9VAC25-840 9VAC25-875;

(4) The final construction schedule; and

(5) A monitoring plan as detailed in subdivision H 4 c of this section.

b. A final stream restoration plan, which shall include the items listed in subdivision H 3 of this section of this section and the following:

(1) A summary of the type and acreage or linear feet of impacts to state waters anticipated during the construction of the restoration site and the proposed compensation for these impacts;

(2) A detailed plan view, profile, and cross-section sketches with the location of proposed restoration measures;

(3) A site access plan;

(4) An erosion and sediment control plan meeting the requirements of 9VAC25-840 9VAC25-875;

(5) The final construction schedule; and

(6) A monitoring plan as detailed in subdivision H 4 c of this section.

c. A monitoring plan, which shall include: (i) monitoring goals; (ii) proposed performance standards; (iii) parameters to be monitored; (iv) methods of monitoring; (v) length of monitoring period; (vi) monitoring and reporting schedule; (vii) reporting requirements; and (viii) projects responsible for monitoring and reporting.

(1) Performance standards for wetland or stream restoration shall include specific, measureable parameters for determination of performance in comparison to as-built conditions. For wetland restoration, performance standards may include applicable parameters to demonstrate characteristics of wetland formation and stability for the type of wetland restored, including hydrology, soils, vegetation, and stability of any water control structures or berms. For stream restoration, performance standards may include applicable parameters to demonstrate characteristics of channel stability, including dimension, pattern, profile, materials, and stability of the channel and any structures.

(2) Monitoring methods and parameters shall be selected based on type of wetland or stream restoration, the implementation plan, and performance standards of the nutrient credit-generating project, and will be outlined in the monitoring plan. For wetland restoration, the monitoring plan shall include the location and number of photo stations, monitoring wells, vegetation sampling points, other monitoring equipment, and reference wetlands, if available. For stream restoration, the plan shall include the location and number of stations utilized for photo-monitoring, cross-sections, profiles, pattern measurements, streambank stability measurements, streambank vegetation surveys, bank pins, scour chains, stream gages, rain gages, other monitoring equipment, and reference streams, if available.

(3) The monitoring and reporting schedule shall include an as-built survey conducted directly following construction and at least six monitoring and reporting events over a 10-year monitoring period following construction. All monitoring activities shall occur during the growing season, with the exception that after year three, physical monitoring of stream condition (cross-section, profiles, pattern) may be conducted outside the growing season. For any year in which planting was conducted, monitoring of woody vegetation shall take place no earlier than October and at least six months following planting. If all performance standards have not been met in the 10th year, then a monitoring report shall be required for each consecutive year until two sequential annual reports indicate that all performance standards have been successfully satisfied. The extent of monitoring may be reduced, upon approval by the department, on a case-by-case basis, in response to exceptional attainment of performance standards. Submittal of a final monitoring report, typically prepared the 10th growing season following construction completion, shall be required as a baseline for long-term management.

5. A long-term management plan, which shall include:

a. Restoration projects shall include minimization of active engineering features (e.g., pumps) that require long-term management and appropriate site selection to ensure that natural hydrology and landscape context will support long-term sustainability;

b. Long-term management and maintenance shall include basic management as necessary to ensure long-term sustainability of the nutrient credit-generating project such as long-term repair or replacement, maintenance of water control or other structures, or easement enforcement;

c. The owner shall designate a responsible long-term steward in the plan. The owner of the nutrient credit-generating project is the default long-term steward and is responsible for implementing the long term management plan and management of the financial assurance. However, the owner may transfer the long-term management responsibilities and management of the long-term financial assurance to a long-term steward or land stewardship project, such as a public agency, nongovernmental organization, or private land manager, upon review and approval by the department;

d. Long-term management needs, annual cost estimates for these needs, and identifying the funding mechanism that will be used to meet these needs shall be included.

I. For nutrient credit-generating projects utilizing urban practices, the implementation plan shall also include:

1. A description of the contributing drainage area (CDA) for the proposed nutrient credit-generating project's BMP. This description shall include (i) the acreage and land covers (e.g., impervious, forest or open space, managed turf); (ii) water features including all streams, ponds, lakes, and wetlands; (iii) identification of all impaired waters and approved TMDLs; and (iv) identification or mapping of the soil types within the CDA, by USDA hydrological soil group.

2. A list of all of the current urban nutrient management plans developed by a certified nutrient management planner and being implemented within the CDA.

3. Information on the location and description of existing BMPs within the CDA. For BMPs that constitute the baseline requirements include implementation schedules, lifespan, and maintenance procedures.

4. For development and redevelopment projects, the implementation plan shall include the erosion and sediment control plan and the stormwater management plan developed in accordance 9VAC25-870 9VAC25-875.

5. For retrofits, the implementation plan shall include relevant credit calculations and documentation as deemed appropriate by the department.

J. For other types of activities or projects not presented in subsections C through I of this section, the implementation plan shall include information as deemed appropriate by the department in order to evaluate the credits for nutrient credit certification.

9VAC25-900-230. Financial assurance applicability.

A. An owner of a nutrient credit-generating project that utilizes structural BMPs for the generation of perpetual credits shall submit and maintain financial assurance in accordance with this part. The financial assurance mechanism shall be submitted to and approved by the department prior to the release of credits.

B. An owner of a nutrient credit-generating project that utilizes structural BMPs for the generation of term credits with terms that exceed one year shall submit and maintain financial assurance in accordance with this part. However, an owner of a nutrient credit-generating project that utilizes structural BMPs for the generation of term credits with terms that exceed one year shall not be required to submit and maintain financial assurance in accordance with this part, provided that the department annually approves the generation of the term nutrient credits prior to release of the credits. In accordance with 9VAC25-900-90 B, the financial assurance mechanism shall be submitted to and approved by the department prior to the release of credits. For the purposes of this part, term credit shall refer to credit with a term greater than one year but not perpetual.

C. An owner of a nutrient credit-generating project using proposed new wetland or stream restoration practices not subject to 33 CFR 332.8 and § 62.1-44.15:23 of the Code of Virginia for the generation of perpetual credits shall be required to submit and maintain financial assurance in accordance with this chapter. In accordance with 9VAC25-900-90 B, the financial assurance mechanism shall be submitted to and approved by the department prior to the release of credits. The following financial assurances shall be provided for these new wetland or stream restoration projects:

1. A monitoring plan financial assurance mechanism shall be established to ensure implementation of the monitoring plan pursuant to 9VAC25-900-120 for any nutrient credits generated from wetland or stream restoration. When the owner conducts the required monitoring and submits a complete monitoring report as specified in the monitoring plan and report requirements, then the owner may request a reduction of the required financial assurance amount equivalent to the cost of one year of monitoring, subject to department approval. If any funds remain in the financial assurance mechanism after the monitoring period, the mechanism shall be maintained until the final monitoring report is submitted and approved, at which point the mechanism shall be released by the department;

2. A long-term management fund financial assurance mechanism shall be established in support of required long-term management plan tasks pursuant to 9VAC25-900-120 for any nutrient credits generated from wetland or stream restoration. Long-term management funds shall be placed in a separate interest bearing trust account in an appropriate financial institution and may be funded from a sufficient percentage of all credit sale proceeds, a single lump sum payment, or an approved schedule of payments, subject to department approval. No long-term management funds shall be used to finance any expense or activity other than those specified in the long-term management plan unless approved by the department. Responsibility for and access to the long-term management fund is given to the owner or long-term steward and may be transferred to any new long-term steward that is designated by the owner and approved by the department; and

3. In lieu of the long-term management fund trust account for stream restoration projects established in subdivision 2 of this subsection, a third-party long-term steward approved by the department, such as a public agency, nongovernmental organization, or private land manager, may hold long-term management funds in a separate interest-bearing account to be used only for the long-term management of the stream restoration project.

D. When the nutrient credits are generated or used by a locality, authority, utility, sanitation district, or owner operating an MS4 or a point source permitted under 9VAC25-870 9VAC25-875, the existence of tax or rate authority may be used by such entity at its option in satisfaction of the financial assurance required pursuant to this part.

VA.R. Doc. No. R25-7886; Filed July 24, 2024